Image search results - "4300" |
![Filename=060416_3478r.jpg
Filesize=440KiB
Dimensions=1280x853
Date added=Mar 21, 2018 060416_3478r.jpg](albums/pr_website/thumb_060416_3478r.jpg)
060416 3478r614 viewsNelson Point Locomotive Service Shop, BHP Billiton's class leader of the Electro-Motive built SD70ACe/LC locomotive 4300 serial 20038540-001 which was actually purchased as a spare parts source, sits in the shed during commissioning, of note is that it has no windscreen protectors fitted. 16th April 2006. This unit was subsequently stripped and then the frame and cab eventually scrapped in January 2016 without ever hauling a train.
|
|
![Filename=170915_0705.jpg
Filesize=437KiB
Dimensions=1280x853
Date added=Dec 06, 2017 170915_0705.jpg](albums/Pilbara/09-12_2017/thumb_170915_0705.jpg)
170915 07051574 viewsGreat Northern Highway 18.2 km grade crossing, empty Roy Hill fuel train powers along bound for Tad Yard with General Electric built ES44ACi unit RHA 1019 serial 64300 leading eleven of Roy Hill's twelve tank waggons. 15th September 2017. View map here.
|
|
![Filename=170915_0709.jpg
Filesize=391KiB
Dimensions=1280x853
Date added=Dec 06, 2017 170915_0709.jpg](albums/Pilbara/09-12_2017/thumb_170915_0709.jpg)
170915 0709906 viewsGreat Northern Highway 18.2 km grade crossing, empty Roy Hill fuel train powers along bound for Tad Yard with General Electric built ES44ACi unit RHA 1019 serial 64300 leading eleven of Roy Hill's twelve tank waggons. 15th September 2017. View map here.
|
|
![Filename=170915_0710.jpg
Filesize=426KiB
Dimensions=1280x853
Date added=Dec 06, 2017 170915_0710.jpg](albums/Pilbara/09-12_2017/thumb_170915_0710.jpg)
170915 0710126 viewsGreat Northern Highway 18.2 km grade crossing, empty Roy Hill fuel train powers along bound for Tad Yard with General Electric built ES44ACi unit RHA 1019 serial 64300 leading eleven of Roy Hill's twelve tank waggons. 15th September 2017. View map here.
|
|
|