Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Image search results - "4D"
128-27.jpg
128-27404 viewsNar Nar Goon, 4D (Double Deck Development and Demonstration), double deck suburban electric set, stabled during testing phase, 3/4 shot, station platform.
128-28.jpg
128-28368 viewsNar Nar Goon, 4D (Double Deck Development and Demonstration), double deck suburban electric set, testing phase, cab side.
128-29.jpg
128-29365 viewsNar Nar Goon, 4D (Double Deck Development and Demonstration), double deck suburban electric set, testing phase, cab side.
128-30.jpg
128-30365 viewsNar Nar Goon, 4D (Double Deck Development and Demonstration), double deck suburban electric set, testing phase, double deck view of middle section.
128-31.jpg
128-31374 viewsNar Nar Goon, 4D (Double Deck Development and Demonstration), double deck suburban electric set, testing phase, 5002T, shows carriage join.
128-32.jpg
128-32337 viewsNar Nar Goon, 4D (Double Deck Development and Demonstration), double deck suburban electric set, testing phase, cab front.
128-33.jpg
128-33373 viewsNar Nar Goon, 4D (Double Deck Development and Demonstration), double deck suburban electric set, 3/4 shot, security guard car, stabled during testing phase.
128-34.jpg
128-34420 viewsNar Nar Goon, down passenger train with Comeng 377M, guard in doorway, station building and platform, 4D (Double Deck Development and Demonstration), double deck suburban electric set, testing phase.
128-35.jpg
128-35369 viewsNar Nar Goon, down passenger train with Comeng 377M, guard in doorway, departing, station building and platform, 4D (Double Deck Development and Demonstration), double deck suburban electric set, testing phase.
128-36.jpg
128-36470 viewsNar Nar Goon, up passenger train with Comeng 487M, pausing at platform, 4D (Double Deck Development and Demonstration), double deck suburban electric set, testing phase.
128-37.jpg
128-37424 viewsNar Nar Goon, up passenger train with Comeng 487M, departing, 4D (Double Deck Development and Demonstration), double deck suburban electric set, testing phase.
129-1-02.jpg
129-1-02421 viewsNar Nar Goon, 4D (Double Deck Development and Demonstration), double deck suburban electric set, testing phase. The set was built by Goninan NSW in December 1991 as a 'Tangara' model.
129-1-03.jpg
129-1-03377 viewsNar Nar Goon, 4D (Double Deck Development and Demonstration), double deck suburban electric set, testing phase. The set was built by Goninan NSW in December 1991 as a 'Tamgara' model.
129-1-04.jpg
129-1-04403 viewsNar Nar Goon - Tynong section, 4D (Double Deck Development and Demonstration), double deck suburban electric set, testing phase. The set was built by Goninan NSW in December 1991 as a 'Tangara' model.
129-1-05.jpg
129-1-05401 viewsNar Nar Goon - Tynong section, west of Tynong, 4D (Double Deck Development and Demonstration), double deck suburban electric set, testing phase. The set was built by Goninan NSW in December 1991 as a 'Tamgara' model.
129-1-06.jpg
129-1-06381 viewsNar Nar Goon - Tynong section, west of Tynong, 4D (Double Deck Development and Demonstration), double deck suburban electric set, testing phase. The set was built by Goninan NSW in December 1991 as a 'Tamgara' model.
151111_9479.jpg
151111 9479478 viewsCape Lambert Yard, empty train with motive power in the form of General Electric ES44DCi units 8160 and 8193 serials 60224 and 61852 and General Electric Dash 9-44CW 7074 serial 47743.
151111_9483.jpg
151111 9483436 viewsCape Lambert Yard, empty train with motive power of General Electric ES44DCi units 8160 and 8193 serials 60224 and 61852 and General Electric Dash 9-44CW 7074 serial 47743 waiting to depart with leased CFCLA CD class shunt units CD 4302 and CD 4305 and compressor car sets CB 13 and CB 16.
151111_9484.jpg
151111 9484421 viewsCape Lambert Yard, empty train with motive power of General Electric ES44DCi units 8160 and 8193 serials 60224 and 61852 and General Electric Dash 9-44CW 7074 serial 47743 waiting to depart and compressor car sets CB 13 and CB 16.
151111_9485.jpg
151111 9485423 viewsNear the 38 km post, an empty train lead by General Electric ES44DCi units 8160 and 8193 serials 60224 and 61852 and General Electric Dash 9-44CW 7074 serial 47743 power under the water supply pipeline on the Cape Lambert line.
76 files on 4 page(s) 1

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional