Image search results - "5486" |
![Filename=160128_00407.jpg
Filesize=427KiB
Dimensions=1280x853
Date added=Jan 31, 2016 160128_00407.jpg](albums/Pilbara/01-2016/thumb_160128_00407.jpg)
160128 00407255 viewsWedgefield, Sims Metal Yard, rear view of Goninan rebuilt GE model CM40-8MEFI 5669 serial 8412-02, builders no. 95-160 flanked on the left by sister unit 5668 and on the right by older CM40-8M 5642. Note the newer rebuilds have marker lights while 42 has none but has a snow plough on the no. 2 end. Also note the roof access ladder rungs have been removed.
|
|
![Filename=207-26.jpg
Filesize=491KiB
Dimensions=1280x853
Date added=Oct 01, 2014 207-26.jpg](albums/Pilbara/207/thumb_207-26.jpg)
207-26141 viewsHardie Siding, BHP unit 5669 'Builen' is the highest numbered CM40-8MEFI rebuild by Goninan, serial 8412-02 / 95-160, leading an empty train pauses to allow the 2nd person to alight and set the road for the passing track.
|
|
![Filename=207-27.jpg
Filesize=349KiB
Dimensions=1280x853
Date added=Oct 01, 2014 207-27.jpg](albums/Pilbara/207/thumb_207-27.jpg)
207-27140 viewsHardie Siding, BHP unit 5669 'Builen' serial 8412-02 / 95-160 is the highest numbered CM40-8MEFI rebuild by Goninan in the BHP roster, leading an empty train as it takes the passing track to effect a cross.
|
|
![Filename=207-28.jpg
Filesize=487KiB
Dimensions=1280x853
Date added=Oct 01, 2014 207-28.jpg](albums/Pilbara/207/thumb_207-28.jpg)
207-28236 viewsHardie Siding, the days of the C36-7M or Dash 7 units running the Goldsworthy line are almost over, as the CM40-8M or Dash 8 variants take up the task following the arrival of the AC6000 class units. Here, CM40-8MEFI unit 5669 'Beilun' takes the passing track with an empty as C36-7M unit 5513 holds the mainline with a loaded.
|
|
![Filename=207-29.jpg
Filesize=484KiB
Dimensions=1280x853
Date added=Oct 01, 2014 207-29.jpg](albums/Pilbara/207/thumb_207-29.jpg)
207-29141 viewsHardie Siding, BHP Goninan GE rebuild CM40-8MEFI unit 5669 'Builen' serial 8412-02 / 95-160 runs down the passing track, USA built Gunderson smooth sided ore cars ex Phelps Dodge Copper Mine.
|
|
![Filename=221-13.jpg
Filesize=350KiB
Dimensions=1280x848
Date added=Sep 19, 2015 221-13.jpg](albums/Pilbara/221/thumb_221-13.jpg)
221-13122 viewsHardie Siding, BHP Iron Ore Goninan rebuild unit CM40-8MEFI 5669 the last Dash 8 rebuilt for BHP and one of four fitted with an EFI prime mover, serial 95-160/8412-02 is backing out onto the mainline with an empty train that will continue onto Yarrie for loading.
|
|
![Filename=221-14.jpg
Filesize=363KiB
Dimensions=1280x848
Date added=Sep 19, 2015 221-14.jpg](albums/Pilbara/221/thumb_221-14.jpg)
221-14131 viewsHardie Siding, BHP Iron Ore Goninan rebuild unit CM40-8MEFI 5669 the last Dash 8 rebuilt for BHP and one of four fitted with an EFI prime mover, serial 95-160/8412-02, with the switch restored for the mainline the 2nd Person climbs aboard to continue on to Yarrie Mine.
|
|
![Filename=221-15.jpg
Filesize=345KiB
Dimensions=1280x844
Date added=Sep 19, 2015 221-15.jpg](albums/Pilbara/221/thumb_221-15.jpg)
221-15123 viewsHardie Siding, BHP Iron Ore Goninan rebuild unit CM40-8MEFI 5669 the last Dash 8 rebuilt for BHP and one of four fitted with an EFI prime mover, serial 95-160/8412-02, with the switch restored for the mainline the 2nd Person climbs aboard to continue on to Yarrie Mine.
|
|
![Filename=221-16.jpg
Filesize=314KiB
Dimensions=1280x844
Date added=Sep 19, 2015 221-16.jpg](albums/Pilbara/221/thumb_221-16.jpg)
221-16131 viewsHardie Siding, BHP Iron Ore Goninan rebuild unit CM40-8MEFI 5669 the last Dash 8 rebuilt for BHP and one of four fitted with an EFI prime mover, serial 95-160/8412-02, passes the Hardie Station 71 location cases and continues on the mainline bound for loading at Yarrie.
|
|
![Filename=221-17.jpg
Filesize=338KiB
Dimensions=1280x848
Date added=Sep 19, 2015 221-17.jpg](albums/Pilbara/221/thumb_221-17.jpg)
221-17119 viewsHardie Siding, BHP Iron Ore Goninan rebuild unit CM40-8MEFI 5669 the last Dash 8 rebuilt for BHP and one of four fitted with an EFI prime mover, serial 95-160/8412-02, passes the Hardie Station 71 location cases and continues on the mainline bound for loading at Yarrie.
|
|
![Filename=225-02.jpg
Filesize=249KiB
Dimensions=1280x853
Date added=Oct 28, 2015 225-02.jpg](albums/Pilbara/225/thumb_225-02.jpg)
225-0276 viewsBing siding at the 17.5 km, Goninan rebuild CM40-8MEFI GE loco 5669 'Beilun' serial 8412-02 / 95-160 was the last Dash 8 built for BHP Iron Ore, seen here sitting at BNN 6 signal awaiting a path, note the CCTV camera mounted under the radiator wing as a trial for single man crewing when long end leading. GeoData.
|
|
![Filename=225-05.jpg
Filesize=243KiB
Dimensions=1280x849
Date added=Oct 28, 2015 225-05.jpg](albums/Pilbara/225/thumb_225-05.jpg)
225-0574 viewsBing siding, the afternoon empty train to Yandi was a double AC6000, 112 waggons, AC6000 and 112 waggons for a long time, here's one on approach behind General Electric AC6000 6074 serial 51066 built by GE at Erie as it passes Goninan rebuild CM40-8M GE unit 5669. GeoData.
|
|
![Filename=225-10.jpg
Filesize=217KiB
Dimensions=839x1280
Date added=Oct 28, 2015 225-10.jpg](albums/Pilbara/225/thumb_225-10.jpg)
225-1080 viewsBing siding, looking south, signal post BGN 3 arrival signal for south bound movements, empty train heading south, CM40-8M light engine on approach. GeoData.
|
|
![Filename=225-11.jpg
Filesize=237KiB
Dimensions=839x1280
Date added=Oct 28, 2015 225-11.jpg](albums/Pilbara/225/thumb_225-11.jpg)
225-1173 viewsBing siding, looking south, signal post BGN 3 arrival signal for south bound movements, empty train heading south, 5669 'Beilun' serial 8412-02 / 95-160 was the final Dash 8 rebuilt for BHP Iron Ore by Goninan as a CM40-8MEFI GE rebuilt from an ALCo, light engine on approach. GeoData.
|
|
![Filename=225-12.jpg
Filesize=228KiB
Dimensions=842x1280
Date added=Oct 28, 2015 225-12.jpg](albums/Pilbara/225/thumb_225-12.jpg)
225-1272 viewsBing siding, looking south, signal post BGN 3 arrival signal for south bound movements, empty train heading south, 5669 'Beilun' serial 8412-02 / 95-160 was the final Dash 8 rebuilt for BHP Iron Ore by Goninan as a CM40-8MEFI GE rebuilt from an ALCo, light engine on approach. GeoData.
|
|
![Filename=225-13.jpg
Filesize=229KiB
Dimensions=844x1280
Date added=Oct 28, 2015 225-13.jpg](albums/Pilbara/225/thumb_225-13.jpg)
225-1380 viewsBing siding, looking south, signal post BGN 3 arrival signal for south bound movements, empty train heading south, 5669 'Beilun' serial 8412-02 / 95-160 was the final Dash 8 rebuilt for BHP Iron Ore by Goninan as a CM40-8MEFI GE rebuilt from an ALCo, light engine on approach. GeoData.
|
|
![Filename=225-14.jpg
Filesize=249KiB
Dimensions=1280x848
Date added=Oct 28, 2015 225-14.jpg](albums/Pilbara/225/thumb_225-14.jpg)
225-1477 viewsBing siding at the 17 km, Goninan rebuild CM40-8MEFI GE loco 5669 'Beilun' serial 8412-02 / 95-160 was the last Dash 8 built for BHP Iron Ore, heading into Nelson Point, note the CCTV camera mounted under the radiator wing as a trial for single man crewing when long end leading. GeoData.
|
|
![Filename=228-22.jpg
Filesize=243KiB
Dimensions=1280x850
Date added=Nov 13, 2015 228-22.jpg](albums/Pilbara/228/thumb_228-22.jpg)
228-2261 viewsYandi Two branch, the afternoon empty train mid-train remotes cross the bridge at the YT307 km in the form of elephant style Goninan final rebuild GE CM40-8MEFI model unit 5669 'Beilun' serial 8412-02/95-160 and CM40-8M model 5638 'Mallina' serial 8281-02/92-127. Geodata -22.706976, 119.097651 .
|
|
![Filename=228-23.jpg
Filesize=237KiB
Dimensions=1280x851
Date added=Nov 13, 2015 228-23.jpg](albums/Pilbara/228/thumb_228-23.jpg)
228-2362 viewsYandi Two branch, the afternoon empty train mid-train remotes cross the bridge at the YT307 km in the form of elephant style Goninan final rebuild GE CM40-8MEFI model unit 5669 'Beilun' serial 8412-02/95-160 and CM40-8M model 5638 'Mallina' serial 8281-02/92-127. Geodata -22.706976, 119.097651 .
|
|
![Filename=236-17.jpg
Filesize=402KiB
Dimensions=1280x854
Date added=Apr 03, 2016 236-17.jpg](albums/Pilbara/236/thumb_236-17.jpg)
236-1788 viewsNelson Point Loco Overhaul Shop, BHP Iron Ore's Goninan GE rebuilt CM40-8MEFI unit 5669 'Beilun' serial 8412-02 / 95-160 sits out the front awaiting attention.
|
|
|