Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Image search results - "5633"
1047_001.jpg
1047 001223 viewsWelshpool, Goninan Open Day 27th August, 1988. Brand new Pilbara cab being constructed for GE CM39-8 locomotive 5633 serial 5831-12 / 88-082 under construction for Mt Newman Mining.
Jim Bisdee photo.
1050_001.jpg
1050 001283 viewsWelshpool, Goninan Open Day 27th August, 1988. Brand new GE CM39-8 locomotive 5633 serial 5831-12 / 88-082 is only in the early stages of construction for Mt Newman Mining.
Jim Bisdee photo.
160128_00380.jpg
160128 00380381 viewsWedgefield, Sims Metal yard, surrounded by remains, the last unit of 4 GE CM39-8 units built new in 1988 by Goninan WA, 5633 serial 5831-12/88-082 has its back to the scrapping while rebuilt sibling 5636 looks on.
160128_00410.jpg
160128 00410262 viewsWedgefield, Sims Metal Yard, this image shows three different types of the Dash 8 units. On the left 5654 is a GE model CM40-8M Goninan rebuild of a Comeng built ALCo M636, in the middle is new built GE model CM39-8 by Goninan 5633 and on the right is 5636 which is a GE model CM40-8M Goninan rebuild of an AE Goodwin built ALCo C636.
206-26.jpg
206-26124 viewsAn empty train on the Yarrie (former Goldsworthy) line behind BHP 5633 'Hephaestus' built new in 1988 by Goninan as a GE CM39-8 model, serial 5831-12 / 88-082. The four CM39-8 units were upgraded to CM40-8 units following overhauls and finally scrapped in January 2016.
206-27.jpg
206-27117 viewsAn empty train on the Yarrie (former Goldsworthy) line behind BHP 5633 'Hephaestus' built new in 1988 by Goninan as a GE CM39-8 model, serial 5831-12 / 88-082. The four CM39-8 units were upgraded to CM40-8 units following overhauls and finally scrapped in January 2016.
206-28.jpg
206-28121 viewsAn empty train on the Yarrie (former Goldsworthy) line behind BHP 5633 'Hephaestus' built new in 1988 by Goninan as a GE CM39-8 model, serial 5831-12 / 88-082. The four CM39-8 units were upgraded to CM40-8 units following overhauls and finally scrapped in January 2016.
206-29.jpg
206-29119 viewsAn empty train on the Yarrie (former Goldsworthy) line behind BHP 5633 'Hephaestus' built new in 1988 by Goninan as a GE CM39-8 model, serial 5831-12 / 88-082. The four CM39-8 units were upgraded to CM40-8 units following overhauls and finally scrapped in January 2016.
206-30.jpg
206-30125 viewsAn empty train on the Yarrie (former Goldsworthy) line behind BHP 5633 'Hephaestus' built new in 1988 by Goninan as a GE CM39-8 model, serial 5831-12 / 88-082. The four CM39-8 units were upgraded to CM40-8 units following overhauls and finally scrapped in January 2016.
     
9 files on 1 page(s)

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2024 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional