Image search results - "5639" |
![Filename=030720_160654r.jpg
Filesize=411KiB
Dimensions=1280x853
Date added=Feb 02, 2018 030720_160654r.jpg](albums/pr_website/thumb_030720_160654r.jpg)
030720 160654r2484 viewsNelson Point Loco Service Shop, BHP Billiton Goninan GE rebuild CM40-8M 5639 'Corunna Downs' serial 8281-03 / 92-128 sits in the afternoon Pilbara sun displaying its brand new colours, painting only finished on it this day and about ten minutes after these photos where taken the unit was back in service! Sunday 20th July 2003.
|
|
![Filename=040812_123214r.jpg
Filesize=443KiB
Dimensions=1280x853
Date added=Jan 26, 2018 040812_123214r.jpg](albums/pr_website/thumb_040812_123214r.jpg)
040812 123214r578 viewsYarrie line 148 km, east of Taplin, BHP Billiton Goninan GE rebuild CM40-8M 5639 'Corunna Downs' serial 8281-03/92-128 works a 'mixed' of 12 ballast and 10 loaded GML waggons towards Hedland following a derailment further out near the Yarrie Mine, 1230 hrs 12th August 2004.
|
|
![Filename=040812_155940r.jpg
Filesize=403KiB
Dimensions=1280x853
Date added=Jan 26, 2018 040812_155940r.jpg](albums/pr_website/thumb_040812_155940r.jpg)
040812 155940r532 viewsGoldsworthy Junction BHP Billiton Goninan GE rebuild CM40-8M 5639 'Corunna Downs' serial 8281-03/92-128 is on the Yarrie line with a mixed ballast and loaded ore train awaiting a Pilot to come out from Hedland to pilot the train into Nelson Point yard at 1600 hrs 12th August 2004.
|
|
![Filename=050624_3346.jpg
Filesize=335KiB
Dimensions=1280x853
Date added=Jan 31, 2018 050624_3346.jpg](albums/pr_website/thumb_050624_3346.jpg)
050624 3346425 viewsGoldsworthy Siding 110.8 km on the GML sees BHP Billiton Goninan GE rebuilt model CM40-8M unit 5636 'Munda' serial 8151-11 / 91-122 having just cut off and pulled forward from the Sundowner in the passing track 24th June 2005.
|
|
![Filename=226-10.jpg
Filesize=281KiB
Dimensions=1280x845
Date added=Nov 13, 2015 226-10.jpg](albums/Pilbara/226/thumb_226-10.jpg)
226-1089 viewsRedmont, at the 202 km the mid-train trailing remote Goninan rebuild CM40-8M GE unit 5639 'Corunna Downs' serial 8281-03/92-128. GeoData.
|
|
![Filename=230-30.jpg
Filesize=238KiB
Dimensions=1280x849
Date added=Nov 13, 2015 230-30.jpg](albums/Pilbara/230/thumb_230-30.jpg)
230-3062 viewsYandi Two balloon loop, Goninan GE CM40-8M rebuild 5637 'De Grey' serial 8181-01/92-123 is from an AE Goodwin ALCo C636 unit 5456. 5637 has the silver BHP logo on the end but the hood logo has been painted out. Geodata -22.718338, 119.039909 .
|
|
![Filename=230-31.jpg
Filesize=249KiB
Dimensions=851x1280
Date added=Nov 13, 2015 230-31.jpg](albums/Pilbara/230/thumb_230-31.jpg)
230-3157 viewsYandi Two balloon loop, two Goninan GE CM40-8M rebuilds back to back, 5637 on the right being an early rebuild has no marker lights and a snow plough while 5654 has maker lights and note the spare coupler knuckle mounted at the bottom of the steps. Geodata -22.718338, 119.039909 .
|
|
![Filename=230-32.jpg
Filesize=238KiB
Dimensions=849x1280
Date added=Nov 13, 2015 230-32.jpg](albums/Pilbara/230/thumb_230-32.jpg)
230-3261 viewsYandi Two balloon loop, cab side view of Goninan rebuild GE CM40-8M model 5637 'De Grey' serial 8181-01/92-123 with ALCo Hi-Ad bogie. Geodata -22.718338, 119.039909 .
|
|
![Filename=230-37.jpg
Filesize=231KiB
Dimensions=1280x849
Date added=Nov 13, 2015 230-37.jpg](albums/Pilbara/230/thumb_230-37.jpg)
230-3775 viewsYandi Two balloon loop, 3/4 view from no. 2 end of Goninan rebuilt GE CM40-8M model 5639 'Corunna Downs' serial 8281-03/92-128 from AE Goodwin built ALCo C636 5459. Shows the silver BHP Australia logo, the logo on the hood has been painted out. Geodata -22.718338, 119.039909 .
|
|
![Filename=232-10.jpg
Filesize=233KiB
Dimensions=1280x845
Date added=Mar 21, 2016 232-10.jpg](albums/Pilbara/232/thumb_232-10.jpg)
232-1099 viewsYandi One backtrack, following a cyclone shutdown of the mainline and severe flooding around Yandi a 'mixed' freight train was operated to Yandi to deliver food, mail and diesel fuel to the mine and camp. Here BHP Iron Ore CM40-8M unit 5639 'Corunna Downs' serial 8281-03 / 92-128 idles away in the backtrack awaiting its path back to Port Hedland with flat waggon 6703, four fuel tank waggons and a broken ore waggon. February 1997. GeoData.
|
|
![Filename=232-11.jpg
Filesize=212KiB
Dimensions=1280x842
Date added=Mar 21, 2016 232-11.jpg](albums/Pilbara/232/thumb_232-11.jpg)
232-1175 viewsYandi One backtrack, following a cyclone shutdown of the mainline and severe flooding around Yandi a 'mixed' freight train was operated to Yandi to deliver food, mail and diesel fuel to the mine and camp. Here BHP Iron Ore CM40-8M unit 5639 'Corunna Downs' serial 8281-03 / 92-128 idles away in the backtrack awaiting its path back to Port Hedland with flat waggon 6703, four fuel tank waggons and a broken ore waggon. February 1997. GeoData.
|
|
![Filename=232-12.jpg
Filesize=286KiB
Dimensions=842x1280
Date added=Mar 21, 2016 232-12.jpg](albums/Pilbara/232/thumb_232-12.jpg)
232-1289 viewsYandi One backtrack, following a cyclone shutdown of the mainline and severe flooding around Yandi a 'mixed' freight train was operated to Yandi to deliver food, mail and diesel fuel to the mine and camp. Here BHP Iron Ore CM40-8M unit 5639 'Corunna Downs' serial 8281-03 / 92-128 idles away in the backtrack awaiting its path back to Port Hedland with flat waggon 6703, four fuel tank waggons and a broken ore waggon. February 1997. GeoData.
|
|
![Filename=232-14.jpg
Filesize=228KiB
Dimensions=1280x846
Date added=Mar 21, 2016 232-14.jpg](albums/Pilbara/232/thumb_232-14.jpg)
232-1484 viewsYandi One backtrack, following a cyclone shutdown of the mainline and severe flooding around Yandi a 'mixed' freight train was operated to Yandi to deliver food, mail and diesel fuel to the mine and camp. Here BHP Iron Ore CM40-8M unit 5639 'Corunna Downs' serial 8281-03 / 92-128 idles away in the backtrack awaiting its path back to Port Hedland with flat waggon 6703, four fuel tank waggons and a broken ore waggon. February 1997. GeoData.
|
|
![Filename=232-16.jpg
Filesize=219KiB
Dimensions=1280x846
Date added=Mar 21, 2016 232-16.jpg](albums/Pilbara/232/thumb_232-16.jpg)
232-1681 viewsYandi One backtrack, following a cyclone shutdown of the mainline and severe flooding around Yandi a 'mixed' freight train was operated to Yandi to deliver food, mail and diesel fuel to the mine and camp. Here BHP Iron Ore CM40-8M unit 5639 'Corunna Downs' serial 8281-03 / 92-128 idles away in the backtrack awaiting its path back to Port Hedland with flat waggon 6703, four fuel tank waggons and a broken ore waggon. February 1997. GeoData.
|
|
![Filename=232-17.jpg
Filesize=233KiB
Dimensions=851x1280
Date added=Mar 21, 2016 232-17.jpg](albums/Pilbara/232/thumb_232-17.jpg)
232-1782 viewsYandi One backtrack, following a cyclone shutdown of the mainline and severe flooding around Yandi a 'mixed' freight train was operated to Yandi to deliver food, mail and diesel fuel to the mine and camp. Here BHP Iron Ore CM40-8M unit 5639 'Corunna Downs' serial 8281-03 / 92-128 idles away in the backtrack awaiting its path back to Port Hedland with flat waggon 6703, four fuel tank waggons and a broken ore waggon. February 1997. GeoData.
|
|
![Filename=232-18.jpg
Filesize=216KiB
Dimensions=1280x848
Date added=Mar 21, 2016 232-18.jpg](albums/Pilbara/232/thumb_232-18.jpg)
232-1880 viewsYandi One backtrack, following a cyclone shutdown of the mainline and severe flooding around Yandi a 'mixed' freight train was operated to Yandi to deliver food, mail and diesel fuel to the mine and camp. Here BHP Iron Ore CM40-8M unit 5639 'Corunna Downs' serial 8281-03 / 92-128 idles away in the backtrack awaiting its path back to Port Hedland with flat waggon 6703, four fuel tank waggons and a broken ore waggon. February 1997. GeoData.
|
|
![Filename=235-24.jpg
Filesize=258KiB
Dimensions=1280x848
Date added=Mar 21, 2016 235-24.jpg](albums/Pilbara/235/thumb_235-24.jpg)
235-2467 viewsYandi One, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5639 'Corunna Downs' serial 8281-03 / 92-128 sits on a loaded train as second unit awaiting departure time. Note the unit has no marker lights and the tank tells it was an AE Goodwin built C636 ALCo before rebuild.
|
|
![Filename=235-26.jpg
Filesize=257KiB
Dimensions=1280x840
Date added=Mar 21, 2016 235-26.jpg](albums/Pilbara/235/thumb_235-26.jpg)
235-2660 viewsYandi One, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5639 'Corunna Downs' serial 8281-03 / 92-128 sits on a loaded train as second unit awaiting departure time. Note the fuel tank and air receiver unit that tells it was an AE Goodwin built C636 ALCo before rebuild.
|
|
![Filename=235-34.jpg
Filesize=216KiB
Dimensions=1280x846
Date added=Mar 21, 2016 235-34.jpg](albums/Pilbara/235/thumb_235-34.jpg)
235-3460 viewsYandi One, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5639 'Corunna Downs' serial 8281-03 / 92-128 sits on a loaded train as second unit awaiting departure time. Note the unit has no marker lights and the tank tells it was an AE Goodwin built C636 ALCo before rebuild.
|
|
![Filename=5639_roster_rhs_040627_151710.jpg
Filesize=648KiB
Dimensions=1280x853
Date added=Aug 22, 2023 5639_roster_rhs_040627_151710.jpg](albums/Pilbara/roster/thumb_5639_roster_rhs_040627_151710.jpg)
5639 roster rhs 040627 15171058 viewsNelson Point, BHP Billiton's Goninan ALCo to GE rebuild CM40-8M 5639 'Corunna Downs' serial 8281-03 / 92-128 sits in the afternoon Pilbara sun at Car Dumper Two. 5639 was rebuilt from AE Goodwin built ALCo C636 locomotive 5459 in 1992. 27th of June 2004.
|
|
|