Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Image search results - "5666"
040806_091254r.jpg
040806 091254r643 viewsGoldsworthy Junction, BHP Goninan GE rebuild CM40-8MEFI 5666 'Taranto' serial 8412-11 / 94-157, was the first unit fitted with Electronic Fuel Injection to the 16FDL engine hence the EFI on the model designation, is in charge of the Weighbridge Calibration train which is situated in the middle of the switches at the Goldsworthy Junction. 5666 will do several trips back and forward over the weighbridge at various speed to allow the technicians to calibrate it as well as having to clear the mainline for loaded and empty train movements. 0915 hrs 6th August 2004.
202-31.jpg
202-31156 viewsYandi One, 307 km grade crossing, mid-train remote CM40-8MEFI Goninan GE unit 5666 'Taranto' serial 8412-11/94-157 and CM40-8ML unit 5663 'Newcastle' show the difference in the ALCo builds by the fuel tanks, 5666 was originally an M636C built by Comeng while 5663 was originally built by AE Goodwin.
253-31.jpg
253-3132 viewsNelson Point yard sees BHP dumper pilot locomotive 5666 'Taranto', a Goninan GE rebuild CM40-8MEFI model with serial 8412-11 / 94-157, 5666 was the first unit fitted with Electronic Fuel Injection to the 16FDL engine hence the EFI on the model designation.
253-32.jpg
253-3227 viewsNelson Point yard sees BHP dumper pilot locomotives 5666 'Taranto', a Goninan GE rebuild CM40-8MEFI model with serial 8412-11 / 94-157, 5666 was the first unit fitted with Electronic Fuel Injection to the 16FDL engine hence the EFI on the model designation, and in the background with compressor set #2 is 5633 which was a new build CM39-8 GE model by Goninan. A sharp eye will notice the difference in the fuel tanks of the two locomotives.
253-33.jpg
253-3327 viewsNelson Point yard sees BHP dumper pilot locomotive 5666 'Taranto', a Goninan GE rebuild CM40-8MEFI model with serial 8412-11 / 94-157, 5666 was the first unit fitted with Electronic Fuel Injection to the 16FDL engine hence the EFI on the model designation.
     
5 files on 1 page(s)

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2024 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional