Pilbara Railways Scanned and Digital Image Showcase

The entire photo collection with the Toad's Scans images scanned from negatives and slides onto today's digital images


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Image search results - "5831-12/88-082"
1047_001.jpg
1047 00136 viewsWelshpool, Goninan Open Day 27th October, 1988. Brand new Pilbara cab being constructed for GE CM39-8 locomotive 5633 serial 5831-12 / 88-082 under construction for Mt Newman Mining.
Jim Bisdee photo.
1050_001.jpg
1050 00137 viewsWelshpool, Goninan Open Day 27th October, 1988. Brand new GE CM39-8 locomotive 5633 serial 5831-12 / 88-082 is only in the early stages of construction for Mt Newman Mining.
Jim Bisdee photo.
160128_00380.jpg
160128 00380189 viewsWedgefield, Sims Metal yard, surrounded by remains, the last unit of 4 GE CM39-8 units built new in 1988 by Goninan WA, 5633 serial 5831-12/88-082 has its back to the scrapping while rebuilt sibling 5636 looks on.
160128_00410.jpg
160128 00410108 viewsWedgefield, Sims Metal Yard, this image shows three different types of the Dash 8 units. On the left 5654 is a GE model CM40-8M Goninan rebuild of a Comeng built ALCo M636, in the middle is new built GE model CM39-8 by Goninan 5633 and on the right is 5636 which is a GE model CM40-8M Goninan rebuild of an AE Goodwin built ALCo C636.
206-26.jpg
206-2626 viewsAn empty train on the Yarrie (former Goldsworthy) line behind BHP 5633 'Hephaestus' built new in 1988 by Goninan as a GE CM39-8 model, serial 5831-12 / 88-082. The four CM39-8 units were upgraded to CM40-8 units following overhauls and finally scrapped in January 2016.
206-27.jpg
206-2729 viewsAn empty train on the Yarrie (former Goldsworthy) line behind BHP 5633 'Hephaestus' built new in 1988 by Goninan as a GE CM39-8 model, serial 5831-12 / 88-082. The four CM39-8 units were upgraded to CM40-8 units following overhauls and finally scrapped in January 2016.
206-28.jpg
206-2830 viewsAn empty train on the Yarrie (former Goldsworthy) line behind BHP 5633 'Hephaestus' built new in 1988 by Goninan as a GE CM39-8 model, serial 5831-12 / 88-082. The four CM39-8 units were upgraded to CM40-8 units following overhauls and finally scrapped in January 2016.
206-29.jpg
206-2928 viewsAn empty train on the Yarrie (former Goldsworthy) line behind BHP 5633 'Hephaestus' built new in 1988 by Goninan as a GE CM39-8 model, serial 5831-12 / 88-082. The four CM39-8 units were upgraded to CM40-8 units following overhauls and finally scrapped in January 2016.
206-30.jpg
206-3032 viewsAn empty train on the Yarrie (former Goldsworthy) line behind BHP 5633 'Hephaestus' built new in 1988 by Goninan as a GE CM39-8 model, serial 5831-12 / 88-082. The four CM39-8 units were upgraded to CM40-8 units following overhauls and finally scrapped in January 2016.
     
9 files on 1 page(s)

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Website and all images are © 1997-2019 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional