Image search results - "650" |

041001 152919r1004 viewsRedbank Bridge, BHP Goninan GE rebuild CM40-8M 5650 'Yawata' serial 8412-07 / 93-141 notches back up into power as it passes the examiner doing his 'roll by' entering Nelson Point yard as a Doug Gould road train passes over the top. A very rare shot indeed! 1530 hrs 1st October 2004.
|
|

0650 061209 818353 viewsRobe River ore waggon 650, built by Tomlinson Steel WA, non-handbrake side loaded view at the 7 km location just south of Cape Lambert yard. December 9, 2006.
|
|

0650 180616 164847 viewsRobe River ore waggon 650, built by Tomlinson Steel WA, fixed coupler non-handbrake side loaded view at the 38.5 km, Harding on the Cape Lambert line, June 16, 2018.
|
|

100508 8226r879 viewsNelson Point, BHP Billiton's Goninan GE CM40-8M unit 5650 'Yawata' serial 8412-07 / 93-141 rebuilt from AE Goodwin M636C ALCo 5481, cab side shot shows Hi-Ad bogie, modified handrail and black side loco numbers, only 5639 and 5650 carried black numbers till retirement with the original repaint 5632 having its black numbers changed to white. 8th May 2010.
|
|

130720 1469r972 viewsBing Siding, BHP Billiton's Goninan GE CM40-8M unit 5650 'Yawata' serial 8412-07 / 93-141 rebuilt from AE Goodwin M636C ALCo 5481, side shot shows Hi-Ad bogies, modified handrail and black side loco numbers, only 5639 and 5650 carried black numbers till retirement with the original repaint 5632 having its black numbers changed to white. 8th May 2010.
|
|

140601 4499260 viewsWoodbridge, empty Carina bound iron ore train #1035, CFCLA leased CHCH type waggon CHCH 7650 these waggons were rebuilt between 2010 and 2012 by Bluebird Rail Operations SA from former Goldsworthy Mining hopper waggons originally built by Tomlinson WA and Scotts of Ipswich Qld back in the 60's to early 80's. 1st June 2014.
|
|

161112 3014317 viewsWest Kalgoorlie, loaded Malcolm sulphur train 6029, CQZY type waggon CQZY 1650, built by CIMC at Dalian China for CFCLA and one of fifteen on lease to Aurizon with a pair of original style sulphur containers with sliding tarpaulins, S68B G861 with what look to be fork pockets in the top sill, and S86W G988.
|
|

208-2-27367 viewsMidland Workshops, Westrail L class L 255 a Clyde Engineering EMD model GT26C, serial 67-545 under overhaul surrounded by various rollingstock including the WSL 30650 bogie transport waggon which was built for this task in 1977 at Midland Workshops.
|
|

208-2-28348 viewsMidland Workshops, Westrail L class L 255 a Clyde Engineering EMD model GT26C, serial 67-545 under overhaul surrounded by various rollingstock including the WSL 30650 bogie transport waggon which was built for this task in 1977 at Midland Workshops.
|
|

208-2-29370 viewsMidland Workshops, Westrail L class L 255 a Clyde Engineering EMD model GT26C, serial 67-545 under overhaul surrounded by various rollingstock including the WSL 30650 bogie transport waggon which was built for this task in 1977 at Midland Workshops.
|
|

229-03512 viewsYandi Two balloon switch looking east with an empty BHP train heading for the loadout behind a pair of Goninan rebuild CM40-8M GE units with 5650 'Yawata' serial 8412-07 / 93-141 leading sister unit 5642, grade crossing is the YT 311.5 km. GeoData.
|
|

229-15323 viewsYandi Two loadout, looking at the exit portal of the tunnel as Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 drags a loading through at 1.2 km/h, the massive pile of ore is gravity fed into the waggons via two sets of hydraulic chutes, the red and amber lights control access through the tunnel and the steel pipe is for dust extraction. GeoData.
|
|

229-16319 viewsYandi Two loadout, looking at the exit portal of the tunnel as Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 drags a loading through at 1.2 km/h, the massive pile of ore is gravity fed into the waggons via two sets of hydraulic chutes, the red and amber lights control access through the tunnel and the steel pipe is for dust extraction. GeoData.
|
|

229-17318 viewsYandi Two loadout, looking at the exit portal of the tunnel as Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 and sister 5642 drag a loading train at 1.2 km/h, the red and amber lights control entry to the tunnel and the steel pipe is for dust extraction. GeoData.
|
|

229-18327 viewsYandi Two loadout, looking at the exit portal of the tunnel as Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 and sister 5642 drag a loading train at 1.2 km/h, the red and amber lights control entry to the tunnel and the steel pipe is for dust extraction. GeoData.
|
|

229-19278 viewsYandi Two loadout, looking at the exit portal of the tunnel as Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 drags a loading train through at 1.2 km/h, the massive pile of ore is gravity fed into the waggons via two sets of hydraulic chutes, the original pedestal radial stacker is visible above the ore along with the extraction fan. GeoData.
|
|

229-20313 viewsYandi Two loadout, looking at the exit portal of the tunnel as Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 drags a loading train through at 1.2 km/h, the massive pile of ore is gravity fed into the waggons via two sets of hydraulic chutes, the original pedestal radial stacker is visible above the ore along with the extraction fan. GeoData.
|
|

229-21289 viewsYandi Two loadout, looking at the exit portal of the tunnel as Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 drags a loading train through at 1.2 km/h, the massive pile of ore is gravity fed into the waggons via two sets of hydraulic chutes, the original pedestal radial stacker is visible above the ore along with the extraction fan. GeoData.
|
|

229-22296 viewsYandi Two loadout, looking at the exit portal of the tunnel as Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 drags a loading train through at 1.2 km/h, the massive pile of ore is gravity fed into the waggons via two sets of hydraulic chutes, the original pedestal radial stacker is visible above the ore along with the extraction fan. GeoData.
|
|

229-23311 viewsYandi Two loadout, looking at the exit portal of the tunnel as Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 drags a loading train through at 1.2 km/h, the massive pile of ore is gravity fed into the waggons via two sets of hydraulic chutes, the original pedestal radial stacker is visible above the ore along with the extraction fan. GeoData.
|
|
67 files on 4 page(s) |
1 |
 |
|