Image search results - "676" |

0676 060722 763257 viewsRobe River ore waggon 676, built by Tomlinson Steel WA, rotary coupler end handbrake side empty view, at the 11.7 km, Cape Lambert. July 22, 2006.
|
|

0676 141124 678251 viewsRobe River ore waggon 676, built by Tomlinson Steel WA, fixed coupler handbrake side empty view at the 25 km at Arches Siding on the Cape Lambert line. November 24, 2014.
|
|

0676 210322 977843 viewsRobe River ore waggon 676, built by Tomlinson Steel WA, rotary coupler end non-handbrake side loaded view at the 17 km on the Cape Lambert line, March 22, 2021.
|
|

160530 9272309 viewsBinduli, 7SP3 intermodal service, RLSY 18676
|
|

240701 246350 viewsWestern Creek, 67 km, one of Rio Tinto's blue rakes with spring assisted park brake and only electronic controlled pneumatic [ECP] braking, waggon pair 31676 is a master and is bar coupled to slave waggon 36676 built by China Northen as a Q type in 11/2022. Captured on July 1, 2024.
|
|

250501 0455209 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2675 - GA 2676, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|
|
|
|