Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images. **Note - Due to recent changes to make the gallery mobile friendly, please click the image for full size picture.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Image search results - "796"
0796_110602_1622.jpg
0796 110602 1622268 viewsRobe River ore waggon 796, built by Centurion Industries WA, rotary coupler end handbrake side loaded view at the 71 km, Western Creek on the Deepdale line. June 2, 2011.
231020_8188.jpg
231020 8188491 viewsParkeston, QQYY type 40' container waggon QQYY 57965 one of five hundred ordered by Aurizon and built by CRRC Yangtze Group of China in 2022. In service with two loaded 20' half height hard top 'rotainers' lettered CRM, for Cristal Mining before they were absorbed into Tronox, CRM 000164 with Tronox decal and CRM 001517 with Cristal decal, on Aurizon's Tronox mineral sands train 4UP1 from Ivanhoe / Broken Hill (NSW) to Kwinana (WA). October 20, 2023.
231020_8228.jpg
231020 8228484 viewsParkeston, QQYY type 40' container waggon QQYY 57960 one of five hundred ordered by Aurizon and built by CRRC Yangtze Group of China in 2022. In service with two loaded 20' half height hard top 'rotainers' lettered CRM, for Cristal Mining before they were absorbed into Tronox, CRM 001750 with Tronox decal and yellow corner posts and CRM 001388 with Tronox decal and yellow corner posts, on Aurizon's Tronox mineral sands train 4UP1 from Ivanhoe / Broken Hill (NSW) to Kwinana (WA). October 20, 2023.
231020_8233.jpg
231020 8233435 viewsParkeston, QQYY type 40' container waggon QQYY 57962 one of five hundred ordered by Aurizon and built by CRRC Yangtze Group of China in 2022. In service with two loaded 20' half height hard top 'rotainers' lettered CRM, for Cristal Mining before they were absorbed into Tronox, CRM 001455 with Cristal decal and yellow corner posts and CRM 001518 with Cristal decal and yellow corner posts, on Aurizon's Tronox mineral sands train 4UP1 from Ivanhoe / Broken Hill (NSW) to Kwinana (WA). October 20, 2023.
250501_0439.jpg
250501 0439451 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2795 - GA 2796, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
     
5 files on 1 page(s)

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2026 www.pilbararailways.com.au Contact Us
Australian flag  Valid XHTML 1.0 Transitional