Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Image search results - "8002"
160522_2068.jpg
160522 2068384 viewsBinduli, 5MP2 steel train, RKVY 8002 wide steel plate tilt waggon, built as part of a batch of five units by Goninan Bassendean WA in 2011, loaded with plates.
160524_4045.jpg
160524 4045355 viewsBinduli, Melbourne bound steel train service 3PM4, RKVY 8002, empty tilt bed plate steel waggon, one of five built by Goninan Bassendean WA in 2011.
8002_060716_7200.jpg
8002 060716 720041 viewsRobe River diesel fuel tank waggon 8002 running empty on the rear of a loaded ore train, built by Comeng NSW in September 1972 with a 45,000 litre capacity, at the 71 km on the Deepdale line, Western Creek, July 16, 2006.
8002_070915_0882.jpg
8002 070915 088236 viewsRobe River diesel fuel tank waggon 8002 running loaded at the front of an empty ore train, built by Comeng NSW in September 1972 with a 45,000 litre capacity, at the 73.4 km on the Deepdale line, Western Creek, September 15, 2007.
8002_1301122_3340.jpg
8002 1301122 334051 viewsRobe River diesel fuel tank waggon 8002, built by Comeng NSW in September 1972 with a 45,000 litre capacity. Rio's Seven Mile complex, November 22, 2013.
8002_1301123_3425.jpg
8002 1301123 342546 viewsRobe River diesel fuel tank waggon 8002, built by Comeng NSW in September 1972 with a 45,000 litre capacity. Rio's Seven Mile complex, November 23, 2013.
   
6 files on 1 page(s)

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional