Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images. **Note - Due to recent changes to make the gallery mobile friendly, please click the image for full size picture.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Image search results - "856"
0856_141124_6806.jpg
0856 141124 6806258 viewsRobe River ore waggon 856, built by Centurion Industries WA, fixed coupler handbrake side empty view at the 25 km at Arches Siding on the Cape Lambert line. November 24, 2014.
0856_160306_1241.jpg
0856 160306 1241321 viewsRobe River ore waggon 856, built by Centurion Industries WA, fixed coupler non-handbrake side empty view at Greenpool on the Cape Lambert line. March 6, 2016.
0856_170513_8763.jpg
0856 170513 8763292 viewsRobe River ore waggon 856, built by Centurion Industries WA, handbrake side loaded view, Cape Lambert yard, May 13, 2017.
1856-6856_050828_5064.jpg
1856-6856 050828 5064114 viewsTunkawanna, empty Hamersley Iron Bradken built S series waggon pair 1856 control and 6856 slave built in April 2003. August 28, 2005.
4 files on 1 page(s)

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2026 www.pilbararailways.com.au Contact Us
Australian flag  Valid XHTML 1.0 Transitional