Image search results - "908" |

0908 060722 749311 viewsRobe River ore waggon 908, built by Centurion Industries WA, handbrake side loaded view at the 78.8 km between Western Creek and Maitland on the Deepdale line. July 22, 2006.
|
|

0908 081209 014010 viewsRobe River ore waggon 908, built by Centurion Industries WA, non-handbrake side loaded view at the 7 km location just south of Cape Lambert yard. December 9, 2008.
|
|

110620 2019r218 viewsWalla Siding, empty BHP ore waggon 9081, renumbered from 2710, originally built in 1971 by Comeng WA as part of a batch of four hundred waggons. The renumbering would be due to a new waggon replacing a potential scrap waggon, which then has been returned to service. 20th of June 2011.
|
|

130708 0778238 viewsCharra, originally an Kinki Sharyo built NH type for the NAR now coded ENH type ENH 8 Y, without hungry boards loaded with gypsum, Charoban Rd grade crossing, 477.8 km.
|
|

130708 0934223 viewsThevenard originally an Kinki Sharyo built NH type for the NAR now coded ENH type ENH 8, without hungry boards loaded with gypsum crossing Bergmann Drive grade crossing, 434.2 km.
|
|

250501 0417150 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2907 - GA 2908, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|
|
|
|