Image search results - "925" |
070609 0205129 viewsMidland, ABAY 30925 covered goods waggon originally built by Mechanical Handling Ltd SA as part of a third batch of one hundred and thirty five WVX type covered vans, recoded to WBAX in 1979, in 1985 to WBNX, then in 1995 to RBPX.
|
|
110620 2392r42 viewsWalla, comparison between loaded BHP ore waggons from Comeng WA in 2925 and from Astra Vagoane, Arad Romania in 3312. 2925 is from a batch of four hundred built in 1971 by Comeng WA, while 3312 is from a batch of three hundred and fifty built in 1988 by Astra Vagoane, of which only two hundred and eighty-four didn't enter service. The Comeng build features square side and floor joins, while the Astra Vagoane build is all rounded. 20th of June 2011.
|
|
130708 078275 viewsCharra, originally an Kinki Sharyo built NH type for the NAR now coded ENH type ENH 25 D, without hungry boards loaded with gypsum, Charoban Rd grade crossing, 477.8 km.
|
|
130708 093871 viewsThevenard originally an Kinki Sharyo built NH type for the NAR now coded ENH type ENH 25, without hungry boards loaded with gypsum crossing Bergmann Drive grade crossing, 434.2 km.
|
|
160524 4315109 viewsWest Kalgoorlie, 1MP2 steel train, container waggon RKLY 20925 with a couple of plastic wrapped flat rack units. Originally built in the third contract of two hundred NODY type open waggons built by EPT NSW in 1980/81. Several recodes later it is fitted for containers, primarily steel traffic.
|
|
231020 824628 viewsParkeston, QQYY type 40' container waggon QQYY 57925 one of five hundred ordered by Aurizon and built by CRRC Yangtze Group of China in 2022. In service with two loaded 20' half height hard top 'rotainers' lettered CRM, for Cristal Mining before they were absorbed into Tronox, CRM 000633 with Cristal decal and yellow corner posts and CRM 001163 with Tronox decal and yellow corner posts, on Aurizon's Tronox mineral sands train 4UP1 from Ivanhoe / Broken Hill (NSW) to Kwinana (WA). 20th of October 2023.
|
|
246-3354 viewsCape Lambert, a Robe River loaded Deepdale train on the mainline with waggon 925 a Centurion Industries WA build. The ore is a ROM product and will be dumped over the gyratory crusher to be correctly sized. 22nd May 2002.
|
|
|
|