Image search results - "959" |

0959 060722 75269 viewsRobe River ore waggon 959, built by Centurion Industries WA, handbrake side loaded view at the 78.8 km between Western Creek and Maitland on the Deepdale line. July 22, 2006.
|
|

0959 081209 014213 viewsRobe River ore waggon 959, built by Centurion Industries WA, non-handbrake side loaded view at the 7 km location just south of Cape Lambert yard. December 9, 2008.
|
|

130708 0823233 viewsMoule, originally an Kinki Sharyo built NH type for the NAR now coded ENH type ENH 59 R, without hungry boards loaded with gypsum, Mewett Rd grade crossing, 470.1 km.
|
|

130708 0898240 viewsThevenard originally an Kinki Sharyo built NH type for the NAR now coded ENH type ENH 59 R, without hungry boards loaded with gypsum crossing Bergmann Drive grade crossing, 434.2 km.
|
|

160525 4560296 viewsParkeston, SCT train 3PG1 which operates from Perth to Parkes NSW (Goobang Junction), originally built by Victorian Railways Ballarat North Workshops in March 1980 as one of seventy five VQCX type container flat waggons built, now in private ownership and reclassed PQCY type, PQCY 959 is now fitted with bulkheads and loaded with a truck flat deck with a collection of items.
|
|

160601 10140245 viewsWest Kalgoorlie, 2MP5 intermodal train, NQOY 14959 container waggon, one of fifty built by Tulloch Ltd NSW as type OCY in 1974/75 with a 40' KT type flatrack loaded with mesh KT 1 and a 20' Royal Wold box RWTU 962017.
|
|

161109 1936264 viewsMoule, originally built by Kinki Sharyo as the NH type for the NAR in 1968, sent to Port Lincoln in 1978, then rebuilt and recoded ENH type in 1984, ENH 59 with hungry boards loaded with gypsum.
|
|
|
|