Image search results - "BHP-Ballast-Waggon" |

0207 CNR - QRRS China 150620 9329503 viewsQuarry 8 ballast loading area, rake of CNR-QRRS of China built 99 tonne ballast waggons with the Difco USA built long and short side dump waggons with a Dash 8 loco on the rear.
|
|

0209 CNR - QRRS China 110606 1749497 viewsFlash Butt, CNR-QRRS of China built 99 tonne ballast waggon 0209 waits to be loaded.
|
|

0209 CNR - QRRS China 110606 1752516 viewsFlash Butt yard, CNR-QRRS of China built ballast waggons, 0209 is a 99 tonne bottom discharge and 0711 is an 80 tonne side dump waggon, both built and delivered in early 2011.
|
|

0209 CNR - QRRS China 150620 9326472 viewsQuarry 8 ballast loading area, CNR-QRRS of China built 99 tonne ballast waggons 0209 and 0220 await loading.
|
|

0209 CNR - QRRS China 150620 9328510 viewsQuarry 8 ballast loading area, CNR-QRRS of China built 99 tonne ballast waggon 0209 waits to be loaded.
|
|

0214 CNR - QRRS China 130720 1447480 viewsFlash Butt yard, CNR-QRRS of China built 99 tonne ballast waggons 0214 and 0212 loaded awaiting their next duty.
|
|

0214 CNR - QRRS China 130720 1448443 viewsFlash Butt yard, CNR-QRRS of China built 99 tonne ballast waggon 0214 loaded awaiting their next duty.
|
|

0220 CNR - QRRS China 150620 9327461 viewsQuarry 8 ballast loading area, CNR-QRRS of China built 99 tonne ballast waggon 0220 waits to be loaded.
|
|

0226 CNR - QRRS China 150729 9458513 viewsBing Siding, loaded CNR-QRRS of China built 60 m3 capacity ballast waggon 0226, loaded with ballast.
|
|

0235 CNR - QRRS China 150729 9457544 viewsBing Siding, loaded CNR-QRRS of China built 60 m3 capacity ballast waggon 0235, loaded with ballast.
|
|

0501 Magor USA 050518 2157461 viewsBing Siding. 3/4 view of 1963 built Magor USA waggon 501, the first of twenty waggons originally used on the Oroville Dam construction before coming to the Pilbara in January 1968 as ballast waggons.
|
|

0501 Magor USA 050518 2158492 viewsBing Siding. Side view of 1963 built Magor USA waggon 501, the first of twenty waggons originally used on the Oroville Dam construction before coming to the Pilbara in January 1968 as ballast waggons.
|
|

0502 Magor USA 050412 0772506 viewsQuarry 8, Shaw Siding area. Side view of 1963 built Magor USA ballast waggon 502.
|
|

0502 Magor USA 050412 0775538 viewsQuarry 8, Shaw Siding area. 3/4 view of 1963 built Magor USA ballast waggon 502.
|
|

0502 Magor USA 050518 2161469 viewsBing Siding. 3/4 view of 1963 built Magor USA waggon 502, one of twenty waggons originally used on the Oroville Dam construction before coming to the Pilbara in January 1968 as ballast waggons.
|
|

0502 Magor USA 050518 2162517 viewsBing Siding. Side view of 1963 built Magor USA waggon 502, one of twenty waggons originally used on the Oroville Dam construction before coming to the Pilbara in January 1968 as ballast waggons.
|
|

0503 Magor USA 050412 0762493 viewsQuarry 8, Shaw Siding area. Side view of 1963 built Magor USA ballast waggon 503.
|
|

0503 Magor USA 050412 0765483 viewsQuarry 8, Shaw Siding area. 3/4 view of 1963 built Magor USA ballast waggon 503.
|
|

0503 Magor USA 050518 2171496 viewsBing Siding. 3/4 view of 1963 built Magor USA waggon 503, one of twenty waggons originally used on the Oroville Dam construction before coming to the Pilbara in January 1968 as ballast waggons.
|
|

0503 Magor USA 050518 2172518 viewsBing Siding. Side view of 1963 built Magor USA waggon 503, one of twenty waggons originally used on the Oroville Dam construction before coming to the Pilbara in January 1968 as ballast waggons.
|
|
| 270 files on 14 page(s) |
1 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
|