Pilbara Railways Scanned and Digital Image Showcase

The entire photo collection with the Toad's Scans images scanned from negatives and slides onto today's digital images


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Image search results - "BHP-weigh-waggon"
060414_3439.jpg
060414 343914 viewsNelson Point yard, originally a Magor USA built ballast waggon for the Oroville Dam construction, 507 seen here modified as a weighbridge test waggon with an axle load of 20 ton.
060414_3440.jpg
060414 344014 viewsNelson Point yard, originally a Magor USA built ballast waggon for the Oroville Dam construction, 522 seen here modified as a weighbridge test car.
060414_3441.jpg
060414 34419 viewsNelson Point yard, originally a Magor USA built ballast waggon for the Oroville Dam construction, 522 seen here modified as a weighbridge test car.
060414_3442.jpg
060414 344219 viewsNelson Point yard, originally a Magor USA built ballast waggon for the Oroville Dam construction, 510 seen here modified as a weighbridge test car.
060414_3443.jpg
060414 344324 viewsNelson Point yard, originally a Magor USA built ballast waggon for the Oroville Dam construction, 510 seen here modified as a weighbridge test car.
060414_3445.jpg
060414 3445106 viewsNelson Point yard, originally a Magor USA built ballast waggon for the Oroville Dam construction, 507 seen here modified as a weighbridge test waggon with an axle load of 20 ton. The others in the fleet are 40, 60 and 100 tons. 14th April 2006.
060414_3446.jpg
060414 344639 viewsNelson Point yard, originally a Magor USA built ballast waggon for the Oroville Dam construction, 507 seen here modified as a weighbridge test waggon with an axle load of 20 ton.
060414_3447.jpg
060414 344742 viewsNelson Point yard, originally a Magor USA built ballast waggon for the Oroville Dam construction, 507 seen here modified as a weighbridge test waggon with an axle load of 20 ton.
060414_3448.jpg
060414 344825 viewsNelson Point yard, originally a Magor USA built ballast waggon for the Oroville Dam construction, 507 seen here modified as a weighbridge test waggon, end view.
     
9 files on 1 page(s)

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Website and all images are © 1997-2020 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional