Image search results - "BP01" |
![Filename=110619_1916.jpg
Filesize=326KiB
Dimensions=1280x853
Date added=Apr 21, 2018 110619_1916.jpg](albums/pr_website/thumb_110619_1916.jpg)
110619 1916807 viewsBarker Siding which is the ballast loading point, one of two FMG ballast plough waggons BP 01, built in China by CSR at the Yangtze Rolling Stock Company in 2010. 19th June 2011.
|
|
![Filename=252-11.jpg
Filesize=325KiB
Dimensions=1280x853
Date added=Nov 27, 2020 252-11.jpg](albums/Pilbara/252/thumb_252-11.jpg)
252-1121 viewsCockatoo Siding 273 km on the Hamersley Iron line to Yandi, ballast plough waggon BP 02 is on the end of a ballast rake being loaded. BP 01 has been converted from an Nippon Sharyo ore waggon with the fitting of a plough blade, the waggon is also loaded with ballast for ballast. Location is roughly here. 24th November 2001.
|
|
|
|
|