Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Image search results - "BP02"
171121_0965.jpg
171121 096575 viewsBarker Siding which is the ballast loading point, one of two FMG ballast plough waggons BP 02, built in China by CSR at the Yangtze Rolling Stock Company in 2010 on the south end of a ballast rake. 21st November 2017.
252-02.jpg
252-0235 viewsCockatoo Siding 273 km on the Hamersley Iron line to Yandi, ballast plough waggon BP 02 is on the end of a ballast rake being loaded. BP 02 has been converted from an Nippon Sharyo ore waggon with the mounting of an air compressor on top and the fitting of a plough blade, the waggon is also loaded with ballast for ballast. Location is roughly here. 24th November 2001.
   
2 files on 1 page(s)

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2024 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional