Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Image search results - "CM39-8"
030726_121315r.jpg
030726 121315r885 viewsNelson Point Loco Overhaul Workshop sees BHP Billiton Goninan GE build CM39-8 unit 5632 'Poseidon' serial 5831-11 / 88-081 as it waits for a new engine. Although this was the first unit painted, sister loco 5639 saw the first mainline working of the new scheme to Yandi. This shot was taken on Saturday 26th July 2003.
040801_172236r.jpg
040801 172236r630 viewsBoodarie, 5631 'Apollo' serial 5831-10 / 88-080 leading a loaded Yarrie train thunders around the curve between Boodarie Yard and Finucane Island bound for the FI rotary dumper at 1722 hrs 1st August 2004.
040802_141058r.jpg
040802 141058r562 viewsGoldsworthy Junction, BHP Billiton Goninan GE built CM39-8 5632 'Poseidon' serial 5831-11 / 88-081 in charge of the 'Recycle Rake' is traversing the Transfer Road, this train conveys ore from Nelson Point to Finucane Island, sometimes twice a day. The line to the right is the line to the Junction, Yarrie and Bing. 1410 hrs 2nd August 2004.
040817_194500r.jpg
040817 194500r717 viewsNelson Point, BHP Billiton Goninan GE CM39-8 unit 5630 'Zeus' serial 5831-09 / 88-079 class leader of a batch of four new built units, 5630 ended up travelling 4,940,000 km when retired. Here it idles away next to TSB 2 building awaiting a path out of Nelson Point yard with the 'Recycle Rake' bound for the dumper at Finucane Island 1945 hrs 17th August 2004.
1046_001.jpg
1046 001268 viewsWelshpool, Goninan Open Day 27th August, 1988. Brand new GE CM39-8 locomotive 5632 serial 5831-11 / 88-081 under construction for Mt Newman Mining.
Jim Bisdee photo.
1047_001.jpg
1047 001221 viewsWelshpool, Goninan Open Day 27th August, 1988. Brand new Pilbara cab being constructed for GE CM39-8 locomotive 5633 serial 5831-12 / 88-082 under construction for Mt Newman Mining.
Jim Bisdee photo.
1048_001.jpg
1048 001204 viewsWelshpool, Goninan Open Day 27th August, 1988. View from No.2 end of under construction GE CM39-8 locomotive 5632 serial 5831-11 / 88-081 being built for Mt Newman Mining.
Jim Bisdee photo.
1049_001.jpg
1049 001213 viewsWelshpool, Goninan Open Day 27th August, 1988. View of the assembly floor area, brand new GE CM39-8 locomotive 5631 serial 5831-10 / 88-080 under construction for Mt Newman Mining with sister unit 5632 inline behind it.
Jim Bisdee photo.
1050_001.jpg
1050 001276 viewsWelshpool, Goninan Open Day 27th August, 1988. Brand new GE CM39-8 locomotive 5633 serial 5831-12 / 88-082 is only in the early stages of construction for Mt Newman Mining.
Jim Bisdee photo.
1051_001.jpg
1051 001250 viewsWelshpool, Goninan Open Day 27th August, 1988. Mt Newman Mining's Goninan new build GE CM39-8 model loco 5630 'Zeus' serial 5831-09 / 88-079 out the front of the workshop on display.
Jim Bisdee photo.
160128_00380.jpg
160128 00380373 viewsWedgefield, Sims Metal yard, surrounded by remains, the last unit of 4 GE CM39-8 units built new in 1988 by Goninan WA, 5633 serial 5831-12/88-082 has its back to the scrapping while rebuilt sibling 5636 looks on.
160128_00386.jpg
160128 00386337 viewsWedgefield, Sims Metal yard, upturned bogie from recently scrapped new built Goninan CM39-8 unit 5632. Bogie is of a GE floating bolster design, serial 1-10-87.
160128_00400.jpg
160128 00400314 viewsWedgefield, Sims Metal yard, traction motors from CM39-8 unit 5632, more than likely GE 752AF units.
160128_00402.jpg
160128 00402283 viewsWedgefield, Sims Metal yard, intact bogie from CM39-8 unit 5632, build date 11-87, GE floating bolster design.
160128_00410.jpg
160128 00410253 viewsWedgefield, Sims Metal Yard, this image shows three different types of the Dash 8 units. On the left 5654 is a GE model CM40-8M Goninan rebuild of a Comeng built ALCo M636, in the middle is new built GE model CM39-8 by Goninan 5633 and on the right is 5636 which is a GE model CM40-8M Goninan rebuild of an AE Goodwin built ALCo C636.
160128_00413A.jpg
160128 00413A331 viewsView of the stripped out cab - drivers console of Goninan built CM39-8 unit 5631, serial no. 5831-10, builders no. 88-080.
196-06.jpg
196-06276 viewsYandi Two, BHP Iron Ore 5631 'Apollo' serial 5831-10 / 88-080 originally built new by Goninan as a GE CM39-8 in 1988. Drivers side cab view shows hand brake chain and bogie. May 1998.
196-07.jpg
196-07235 viewsYandi Two, BHP Iron Ore 5630 'Zeus' serial 5831-09 / 88-079 originally built new by Goninan as a GE CM39-8 in 1988. Drivers side cab view shows hand brake chain and bogie. May 1998.
196-08.jpg
196-08251 viewsYandi Two, BHP Iron Ore 5630 'Zeus' serial 5831-09 / 88-079 originally built new by Goninan as a GE CM39-8 in 1988. Drivers side cab view shows hand brake chain and bogie. May 1998.
197-04.jpg
197-04198 viewsGoldsworthy Junction, looking west with the end of the triangle or wye, signal post is GJ 7, empty iron ore train behind BHP's Goninan 1988 build GE CM39-8 unit 5632 'Poseidon' serial 5831-11 / 88-081.
76 files on 4 page(s) 1

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2024 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional