Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Image search results - "CM40-8MEFI"
040806_091254r.jpg
040806 091254r574 viewsGoldsworthy Junction, BHP Goninan GE rebuild CM40-8MEFI 5666 'Taranto' serial 8412-11 / 94-157, was the first unit fitted with Electronic Fuel Injection to the 16FDL engine hence the EFI on the model designation, is in charge of the Weighbridge Calibration train which is situated in the middle of the switches at the Goldsworthy Junction. 5666 will do several trips back and forward over the weighbridge at various speed to allow the technicians to calibrate it as well as having to clear the mainline for loaded and empty train movements. 0915 hrs 6th August 2004.
202-31.jpg
202-31124 viewsYandi One, 307 km grade crossing, mid-train remote CM40-8MEFI Goninan GE unit 5666 'Taranto' serial 8412-11/94-157 and CM40-8ML unit 5663 'Newcastle' show the difference in the ALCo builds by the fuel tanks, 5666 was originally an M636C built by Comeng while 5663 was originally built by AE Goodwin.
228-04.jpg
228-0489 viewsYandi One, a loaded train coming off the balloon loop, this area is near the new MAC Junction. Stockpile and radio repeater in the background.
228-05.jpg
228-0583 viewsYandi One, a loaded train creeps towards the Y308.1 km grade crossing while loading a train at 0.9 km/h. Goninan GE CM40-8MEFI rebuild unit 5667 'Redcar' serial 8412-12/94-158 leads an unidentified CM40-8 new build unit, either 5646 or 5647.
228-06.jpg
228-0684 viewsYandi One, a loaded train creeps towards the Y308.1 km grade crossing while loading a train at 0.9 km/h. Goninan GE CM40-8MEFI rebuild unit 5667 'Redcar' serial 8412-12/94-158 leads an unidentified CM40-8 new build unit, either 5646 or 5647.
253-31.jpg
253-3110 viewsNelson Point yard sees BHP dumper pilot locomotive 5666 'Taranto', a Goninan GE rebuild CM40-8MEFI model with serial 8412-11 / 94-157, 5666 was the first unit fitted with Electronic Fuel Injection to the 16FDL engine hence the EFI on the model designation.
253-32.jpg
253-326 viewsNelson Point yard sees BHP dumper pilot locomotives 5666 'Taranto', a Goninan GE rebuild CM40-8MEFI model with serial 8412-11 / 94-157, 5666 was the first unit fitted with Electronic Fuel Injection to the 16FDL engine hence the EFI on the model designation, and in the background with compressor set #2 is 5633 which was a new build CM39-8 GE model by Goninan. A sharp eye will notice the difference in the fuel tanks of the two locomotives.
253-33.jpg
253-337 viewsNelson Point yard sees BHP dumper pilot locomotive 5666 'Taranto', a Goninan GE rebuild CM40-8MEFI model with serial 8412-11 / 94-157, 5666 was the first unit fitted with Electronic Fuel Injection to the 16FDL engine hence the EFI on the model designation.
254-26.jpg
254-269 viewsBing Siding at the 20 km, an empty train departs south with Goninan rebuild unit 5668 'Dunkirk' an CM40-8MEFI model with serial number 8412-01 / 95-159, one of the last four rebuilds with an EFI 7FDL engine. It is trailing AC6000 unit 6071. September 2001.
254-27.jpg
254-278 viewsBing Siding at the 20 km, an empty train departs south with Goninan rebuild unit 5668 'Dunkirk' an CM40-8MEFI model with serial number 8412-01 / 95-159, one of the last four rebuilds with an EFI 7FDL engine. It is trailing AC6000 unit 6071. September 2001.
   
10 files on 1 page(s)

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2024 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional