Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Image search results - "Conrail"
061026_0359r.jpg
061026 0359r956 viewsSeven Mile, retired Robe River ALCo units in preparation to travel to Perth. Comeng WA ALCo rebuild C636R 9426 serial WA143-1 leads the all ALCo line up. 26th October 2006.
Geoffrey Higham image.
061209_8225r.jpg
061209 8225r697 viewsSeven Mile on 38 Road, stored and stripped the Robe River ALCo units await their fate. Comeng WA ALCo rebuild C636R unit 9426 has already been sent to Perth and sister 9427 is stripped and ready to follow. The other units behind 9427 are ALCo M636 units 9416, 9413, 9415 and 9412. 9th December 2006.
061209_8227r.jpg
061209 8227r810 viewsSeven Mile 38 Road, retired Robe River Comeng WA ALCo rebuild model C636R unit 9427 serial WA143-2 sits stripped of engine, fuel tank and pilots ready for road haulage to Perth for rebuilding and use on FMG rail construction trains in May-June 2007. This unit was originally built by ALCo as C636 serial 3499-2 of January 1968 for Pennsylvania Railroad as #6331, and was purchased off Conrail as #6781 in 1986 and was rebuilt by Comeng WA prior to delivery in January 1987. 9th December 2006.
070501_9016r.jpg
070501 9016r944 viewsWedgefield, sitting in Asset Kinetics yard waiting to start construction duties are two of the four GTSA rebuilt DR class units. Comeng WA ALCo rebuild C636R model DR 8401 'Jean' serial WA143-1 and ex Robe River ALCo #9426 original serial 3499-02 and Comeng WA ALCo rebuild C636R model DR 8402 'Margaret' serial WA135 / C6011-02 and ex Hamersley Iron C636 #3007 with the differences between the Phase II and Phase III radiators of the Comeng WA ALCo rebuild models evident. 1st May 2007.
080202_1887r.jpg
080202 1887r705 viewsBarker Siding, Comeng WA ALCo rebuild C636R model DR 8401 'Jean' serial WA143-1 is ex Robe River 9426 and was originally ALCo C636 serial 3499-03 of 1968 for Pennsylvania Railroad (USA) #6332, waters the ballast rake prior to departing south. 2nd February 2008.
080202_1899r.jpg
080202 1899r937 viewsBarker Siding, Comeng WA ALCo rebuild C636R model DR 8401 'Jean' serial WA143-1 is ex Robe River 9426 and was originally ALCo C636 serial 3499-03 of 1968 for Pennsylvania Railroad (USA) #6332, powers away south into a storm as the second driver looks on. 2nd February 2008.
080202_1939r.jpg
080202 1939r805 viewsWodgina, at the grade crossing, Comeng WA ALCo rebuild C636R model DR 8401 'Jean' serial WA143-1 is ex Robe River 9426 and was originally ALCo C636 serial 3499-03 of 1968 for Pennsylvania Railroad (USA) #6332, runs south with a loaded ballast train. 2nd February 2008.
247-01.jpg
247-01214 viewsCape Lambert, Robe River's 9426 a Comeng WA rebuild from ALCo Schenectady NY model C636 serial 3499-3 originally built in January 1968 for Pennsylvania as #6332, Penn Central 6332 and finally Conrail 6782. Purchased in 1986 and rebuilt by Comeng WA into C636R before delivery to Robe in November 1986. This loco also went on to become DR 8401 for construction of FMG's railway in 2007-08. Seen here in the South Yard waiting to drag a loaded rake down to the car dumper. Approximate location of train is here. 22nd May 2002.
247-02.jpg
247-0294 viewsCape Lambert, Robe River's 9426 a Comeng WA rebuild from ALCo Schenectady NY model C636 serial 3499-3 originally built in January 1968 for Pennsylvania as #6332, Penn Central 6332 and finally Conrail 6782. Purchased in 1986 and rebuilt by Comeng WA into C636R before delivery to Robe in November 1986. This loco also went on to become DR 8401 for construction of FMG's railway in 2007-08. Seen here in the South Yard waiting to drag a loaded rake down to the car dumper. Approximate location of train is here. 22nd May 2002.
247-03.jpg
247-0384 viewsCape Lambert, Robe River's 9426 a Comeng WA rebuild from ALCo Schenectady NY model C636 serial 3499-3 originally built in January 1968 for Pennsylvania as #6332, Penn Central 6332 and finally Conrail 6782. Purchased in 1986 and rebuilt by Comeng WA into C636R before delivery to Robe in November 1986. This loco also went on to become DR 8401 for construction of FMG's railway in 2007-08. Seen here in the South Yard waiting to drag a loaded rake down to the car dumper. Approximate location of train is here. 22nd May 2002.
247-04.jpg
247-0497 viewsCape Lambert, Robe River's 9426 a Comeng WA rebuild from ALCo Schenectady NY model C636 serial 3499-3 originally built in January 1968 for Pennsylvania as #6332, Penn Central 6332 and finally Conrail 6782. Purchased in 1986 and rebuilt by Comeng WA into C636R before delivery to Robe in November 1986. This loco also went on to become DR 8401 for construction of FMG's railway in 2007-08. Seen here in the South Yard waiting to drag a loaded rake down to the car dumper. Approximate location of train is here. 22nd May 2002.
247-10.jpg
247-10115 viewsCape Lambert, Robe River's 9426 a Comeng WA rebuild from ALCo Schenectady NY model C636 serial 3499-3 originally built in January 1968 for Pennsylvania as #6332, Penn Central 6332 and finally Conrail 6782. Purchased in 1986 and rebuilt by Comeng WA into C636R before delivery to Robe in November 1986. This loco also went on to become DR 8401 for construction of FMG's railway in 2007-08. Seen here in the South Yard dragging a loaded rake down to the car dumper. Approximate location of train is here. 22nd May 2002.
247-11.jpg
247-11111 viewsCape Lambert, Robe River's 9426 a Comeng WA rebuild from ALCo Schenectady NY model C636 serial 3499-3 originally built in January 1968 for Pennsylvania as #6332, Penn Central 6332 and finally Conrail 6782. Purchased in 1986 and rebuilt by Comeng WA into C636R before delivery to Robe in November 1986. This loco also went on to become DR 8401 for construction of FMG's railway in 2007-08. Seen here in the South Yard dragging a loaded rake down to the car dumper. Approximate location of train is here. 22nd May 2002.
247-12.jpg
247-1259 viewsCape Lambert, Robe River's 9426 a Comeng WA rebuild from ALCo Schenectady NY model C636 serial 3499-3 originally built in January 1968 for Pennsylvania as #6332, Penn Central 6332 and finally Conrail 6782. Purchased in 1986 and rebuilt by Comeng WA into C636R before delivery to Robe in November 1986. This loco also went on to become DR 8401 for construction of FMG's railway in 2007-08. Seen here in the South Yard dragging a loaded rake down to the car dumper. Approximate location of train is here. 22nd May 2002.
247-16.jpg
247-1659 viewsCape Lambert, Robe River's 9426 a Comeng WA rebuild from ALCo Schenectady NY model C636 serial 3499-3 originally built in January 1968 for Pennsylvania as #6332, Penn Central 6332 and finally Conrail 6782. Purchased in 1986 and rebuilt by Comeng WA into C636R before delivery to Robe in November 1986. This loco also went on to become DR 8401 for construction of FMG's railway in 2007-08. Seen here dragging a loaded 101 waggon rake down to the car dumper. 22nd May 2002.
247-18.jpg
247-1897 viewsCape Lambert, Robe River's 9426 a Comeng WA rebuild from ALCo Schenectady NY model C636 serial 3499-3 originally built in January 1968 for Pennsylvania as #6332, Penn Central 6332 and finally Conrail 6782. Purchased in 1986 and rebuilt by Comeng WA into C636R before delivery to Robe in November 1986. This loco also went on to become DR 8401 for construction of FMG's railway in 2007-08. Seen here dragging a loaded 101 waggon rake down to the car dumper from the South Yard at Bells Crossing. Approximate location of train is here. 22nd May 2002.
247-19.jpg
247-19178 viewsCape Lambert, Robe River's 9426 a Comeng WA rebuild from ALCo Schenectady NY model C636 serial 3499-3 originally built in January 1968 for Pennsylvania as #6332, Penn Central 6332 and finally Conrail 6782. Purchased in 1986 and rebuilt by Comeng WA into C636R before delivery to Robe in November 1986. This loco also went on to become DR 8401 for construction of FMG's railway in 2007-08. Seen here dragging a loaded 101 waggon rake down to the car dumper at Bells Crossing. Approximate location of train is here. 22nd May 2002.
247-20.jpg
247-20101 viewsCape Lambert yard view with Robe River Comeng WA ALCo Schenectady NY model rebuild C636R unit 9426 dragging a loaded 101 waggon rake from the South Yard across Bells Crossing while a brace of four Goninan CM40-8M GE rebuilds wait at the fuel point for a departure with an empty train. Approximate location of photo is here. 22nd May 2002.
247-21.jpg
247-2182 viewsCape Lambert yard view with Robe River Comeng WA ALCo Schenectady NY model rebuild C636R unit 9426 dragging a loaded 101 waggon rake from the South Yard across Bells Crossing while a brace of four Goninan CM40-8M GE rebuilds wait at the fuel point for a departure with an empty train. Approximate location of photo is here. 22nd May 2002.
247-22.jpg
247-2249 viewsCape Lambert yard view with Robe River Comeng WA ALCo Schenectady NY model rebuild C636R unit 9426 dragging a loaded 101 waggon rake from the South Yard across Bells Crossing while a brace of four Goninan CM40-8M GE rebuilds wait at the fuel point for a departure with an empty train. Approximate location of photo is here. 22nd May 2002.
37 files on 2 page(s) 1

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2024 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional