Image search results - "FMG-007" |
![Filename=080525_2339r.jpg
Filesize=548KiB
Dimensions=1280x853
Date added=Apr 25, 2018 080525_2339r.jpg](albums/pr_website/thumb_080525_2339r.jpg)
080525 2339r591 viewsBoodarie, sitting at the entry to Herb Elliot Port, FMG General Electric built Dash 9-44CW unit 007 serial 58184 shunts from the loaded waggon line with compressor waggon set 9003-9004. The loco will end up on the track in foreground as it shunts the compressor set on the empty waggon line. 25th May 2008.
|
|
![Filename=080525_2349r.jpg
Filesize=409KiB
Dimensions=1280x853
Date added=Apr 25, 2018 080525_2349r.jpg](albums/pr_website/thumb_080525_2349r.jpg)
080525 2349r609 viewsBoodarie, FMG General Electric Dash 9-44CW unit 007 shunts compressor waggon set 9003-9004 onto the empty waggon line at the 4.400 km, which is the switch for the balloon unloading loop at the entrance to the Herb Elliot Port facility. 25th May 2008.
|
|
|
|
|