Image search results - "FMG-901" |
![Filename=150505_7982.jpg
Filesize=282KiB
Dimensions=1280x853
Date added=Jan 29, 2016 150505_7982.jpg](albums/Pilbara/05-2015/thumb_150505_7982.jpg)
150505 79821013 viewsFMG Solomon Line, bank engines Progress Rail EMD SD70ACe/LCi unit 716 serial 20118693-008 and EMD SD90MAC unit 901 serial 976833-1, this unit has been repowered with an 16-710G3 prime mover, cross the 227.5 km grade crossing as they shove the loaded train upgrade at an increasing speed as the front of the train has topped the grade. Geodata: -22.0187117 118.5850933 .
|
|
![Filename=150505_7986.jpg
Filesize=354KiB
Dimensions=1280x853
Date added=Jan 29, 2016 150505_7986.jpg](albums/Pilbara/05-2015/thumb_150505_7986.jpg)
150505 7986305 viewsFMG Solomon Line, bank engines Progress Rail EMD SD70ACe/LCi unit 716 serial 20118693-008 and EMD SD90MAC unit 901 serial 976833-1, this unit has been repowered with an 16-710G3 prime mover, at the 227 km as they bank the loaded train upgrade at an increasing speed as the front of the train has topped the grade. Geodata: -22.0187117 118.5850933 .
|
|
![Filename=150505_7988.jpg
Filesize=348KiB
Dimensions=1280x853
Date added=Jan 29, 2016 150505_7988.jpg](albums/Pilbara/05-2015/thumb_150505_7988.jpg)
150505 7988178 viewsFMG Solomon Line, bank engines Progress Rail EMD SD70ACe/LCi unit 716 serial 20118693-008 and EMD SD90MAC unit 901 serial 976833-1, this unit has been repowered with an 16-710G3 prime mover, at the 227 km as they bank the loaded train upgrade into the cutting, the train speed is now increasing as the front of the train has topped the grade. Geodata: -22.0187117 118.5850933 .
|
|
![Filename=150505_7990.jpg
Filesize=344KiB
Dimensions=1280x853
Date added=Jan 29, 2016 150505_7990.jpg](albums/Pilbara/05-2015/thumb_150505_7990.jpg)
150505 7990158 viewsFMG Solomon Line, bank engines Progress Rail EMD SD70ACe/LCi unit 716 serial 20118693-008 and EMD SD90MAC unit 901 serial 976833-1, this unit has been repowered with an 16-710G3 prime mover, at the 227 km as they bank the loaded train upgrade into the cutting, the train speed is now increasing as the front of the train has topped the grade. Geodata: -22.0187117 118.5850933 .
|
|
![Filename=170727_9567.jpg
Filesize=327KiB
Dimensions=1280x853
Date added=Oct 16, 2017 170727_9567.jpg](albums/Pilbara/07-2017/thumb_170727_9567.jpg)
170727 9567568 viewsOn Abydos Station, cattle not rail, empty FMG fuel train passes a derailment clean-up site at the 81 km behind NS Juniata Shops rebuilt EMD SD90MAC-H model 901 serial 976833-01 which had the 265-H engine replaced in 2013 with a 710, it leads SD70ACe/LCi unit 715 and twenty four empty fuel tank waggons. GeoData.
|
|
|
|
|
|