Image search results - "NH939" |
![Filename=130708_0821.jpg
Filesize=268KiB
Dimensions=1280x853
Date added=Jan 27, 2015 130708_0821.jpg](albums/SA_Scans/130708_SA_EP/thumb_130708_0821.jpg)
130708 082168 viewsMoule, originally an Kinki Sharyo built NH type for the NAR now coded ENH type ENH 39 B, still with hungry boards fitted loaded with gypsum, Mewett Rd grade crossing, 470.1 km.
|
|
![Filename=130708_0860.jpg
Filesize=335KiB
Dimensions=1280x853
Date added=Jan 27, 2015 130708_0860.jpg](albums/SA_Scans/130708_SA_EP/thumb_130708_0860.jpg)
130708 086058 viewsPenong Junction, originally an Kinki Sharyo built NH type for the NAR now coded ENH type ENH 39 B, still with hungry boards fitted loaded with gypsum [url=https://goo.gl/maps/45FyW] located at the 429.7 km[url].
|
|
![Filename=130708_0896.jpg
Filesize=312KiB
Dimensions=1280x853
Date added=Jan 27, 2015 130708_0896.jpg](albums/SA_Scans/130708_SA_EP/thumb_130708_0896.jpg)
130708 089658 viewsThevenard originally an Kinki Sharyo built NH type for the NAR now coded ENH type ENH 39 B, with hungry boards still fitted, loaded with gypsum crossing Bergmann Drive grade crossing, 434.2 km.
|
|
|
|