Pilbara Railways Scanned and Digital Image Showcase

The entire photo collection with the Toad's Scans images scanned from negatives and slides onto today's digital images


Home Login
Album list Most viewed Top rated My Favourites Search
Image search results - "SD70ACe/LCi"
130818_2712r.jpg
130818 2712r263 viewsKanyirri Yard, FMG's Electro-Motive Diesel built SD70ACe/LCi locomotive 707 serial 20118611-007 built 2012 seen here coupled to a sister unit. 18th August 2013.
150505_7982.jpg
150505 798251 viewsFMG Solomon Line, bank engines Progress Rail EMD SD70ACe/LCi unit 716 serial 20118693-008 and EMD SD90MAC unit 901 serial 976833-1, this unit has been repowered with an 16-710G3 prime mover, cross the 227.5 km grade crossing as they shove the loaded train upgrade at an increasing speed as the front of the train has topped the grade. Geodata: -22.0187117 118.5850933 .
150505_7986.jpg
150505 798695 viewsFMG Solomon Line, bank engines Progress Rail EMD SD70ACe/LCi unit 716 serial 20118693-008 and EMD SD90MAC unit 901 serial 976833-1, this unit has been repowered with an 16-710G3 prime mover, at the 227 km as they bank the loaded train upgrade at an increasing speed as the front of the train has topped the grade. Geodata: -22.0187117 118.5850933 .
150505_7988.jpg
150505 798842 viewsFMG Solomon Line, bank engines Progress Rail EMD SD70ACe/LCi unit 716 serial 20118693-008 and EMD SD90MAC unit 901 serial 976833-1, this unit has been repowered with an 16-710G3 prime mover, at the 227 km as they bank the loaded train upgrade into the cutting, the train speed is now increasing as the front of the train has topped the grade. Geodata: -22.0187117 118.5850933 .
150505_7990.jpg
150505 799039 viewsFMG Solomon Line, bank engines Progress Rail EMD SD70ACe/LCi unit 716 serial 20118693-008 and EMD SD90MAC unit 901 serial 976833-1, this unit has been repowered with an 16-710G3 prime mover, at the 227 km as they bank the loaded train upgrade into the cutting, the train speed is now increasing as the front of the train has topped the grade. Geodata: -22.0187117 118.5850933 .
170726_9434.jpg
170726 94343 viewsKanyirri yard, a short FMG shunt train departs the yard and heads to the car dumper balloons behind Progress Rail built SD70ACe/LCi unit 702 serial 20118611-002 and ten pairs of ore waggons. 26th July 2017.
170726_9461.jpg
170726 94614 viewsBoodarie, a loaded FMG iron ore train round the large curve at the 5 km as the train is passing under the Great Northern Highway behind Progress Rail Muncie USA built SD70ACe/LCi unit 717 serial 20118693-009 and sister 718 as they head for the car dumper unloading balloon loops. 26th July 2017.
170730_0435.jpg
170730 04352 viewsBoodarie, a loaded FMG iron ore train rounds the large curve at the 5 km as it approaches the car dumper balloon loops behind Progress Rail Muncie USA built SD70ACe/LCi unit 719 serial 20118693-011 and sister 704 with the first four waggons showing panel repairs and re-lining recently undertaken. 30th July 2017. GeoData.
8 files on 1 page(s)

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Website and all images are © 1997-2019 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional