Image search results - "WO31269" |
060528 4450121 viewsWO type iron ore waggon WO 31269 is one of a batch of eighty six built by WAGR Midland Workshops between 1967 and March 1968 with fleet number 152 for Koolyanobbing iron ore operations, with a 75 ton and 1018 ft³ capacity, red-carded at West Kalgoorlie, 28th May 2006. This unit was converted to WOC for coal in 1986 till 1994 when it was re-classed back to WO.
|
|
100731 0234782 viewsWO type iron ore waggon WO 31269 is one of a batch of eighty six built by WAGR Midland Workshops between 1967 and March 1968 with fleet number 152 for Koolyanobbing iron ore operations, with a 75 ton and 1018 ft³ capacity, on loaded train 6413 at Binduli Triangle, 31st July 2010. This unit was converted to WOC for coal in 1986 till 1994 when it was re-classed back to WO.
|
|
100822 593963 viewsWO type iron ore waggon WO 31269 is one of a batch of eighty six built by WAGR Midland Workshops between 1967 and March 1968 with fleet number 152 for Koolyanobbing iron ore operations, with a 75 ton and 1018 ft³ capacity, Binduli Triangle 22nd August 2010. This unit was converted to WOC for coal in 1986 till 1994 when it was re-classed back to WO.
|
|
|
|