Image search results - "WO31297" |
![Filename=100731_02852.jpg
Filesize=171KiB
Dimensions=1024x683
Date added=Jan 27, 2015 100731_02852.jpg](albums/Inter_Scans/WA_SG_Ironore_waggons/thumb_100731_02852.jpg)
100731 0285254 viewsWO type iron ore waggon WO 31297 is one of a batch of fifteen built by WAGR Midland Workshops between July and October 1968 with fleet number 176 for Koolyanobbing iron ore operations, with a 75 ton and 1018 ft³ capacity, on loaded train 7415 at Binduli Triangle, 31st July 2010. This unit was converted to WOG for gypsum in late 1980s till 1994 when it was re-classed back to WO.
|
|
![Filename=100822_6233.jpg
Filesize=112KiB
Dimensions=1024x683
Date added=Jan 27, 2015 100822_6233.jpg](albums/Inter_Scans/WA_SG_Ironore_waggons/thumb_100822_6233.jpg)
100822 623354 viewsWO type iron ore waggon WO 31297 is one of a batch of fifteen built by WAGR Midland Workshops between July and October 1968 with fleet number 176 for Koolyanobbing iron ore operations, with a 75 ton and 1018 ft³ capacity, on empty train 1416 at Hampton, 22nd August 2010. This unit was converted to WOG for gypsum in late 1980s till 1994 when it was re-classed back to WO.
|
|
|
|
|