Image search results - "WOB31385" |
![Filename=100731_02336.jpg
Filesize=150KiB
Dimensions=1024x683
Date added=Jan 27, 2015 100731_02336.jpg](albums/Inter_Scans/WA_SG_Ironore_waggons/thumb_100731_02336.jpg)
100731 02336131 viewsWOB type iron ore waggon WOB 31385 is one of a batch of twenty five built by Comeng WA between 1974 and 1975 and converted from Mt Newman high sided waggons by WAGR Midland Workshops with a capacity of 67 tons with fleet number 310 for Koolyanobbing iron ore operations, on loaded train 6413 at Binduli Triangle, 31st July 2010.
|
|
![Filename=100822_5972.jpg
Filesize=141KiB
Dimensions=1024x683
Date added=Jan 27, 2015 100822_5972.jpg](albums/Inter_Scans/WA_SG_Ironore_waggons/thumb_100822_5972.jpg)
100822 597278 viewsWOB type iron ore waggon WOB 31385 is one of a batch of twenty five built by Comeng WA between 1974 and 1975 and converted from Mt Newman high sided waggons by WAGR Midland Workshops with a capacity of 67 tons with fleet number 310 for Koolyanobbing iron ore operations, Binduli Triangle, 22nd August 2010.
|
|
|
|
|