Image search results - "bhp-ballast-waggon" |

0207 CNR - QRRS China 150620 9329505 viewsQuarry 8 ballast loading area, rake of CNR-QRRS of China built 99 tonne ballast waggons with the Difco USA built long and short side dump waggons with a Dash 8 loco on the rear.
|
|

0209 CNR - QRRS China 110606 1749501 viewsFlash Butt, CNR-QRRS of China built 99 tonne ballast waggon 0209 waits to be loaded.
|
|

0209 CNR - QRRS China 110606 1752518 viewsFlash Butt yard, CNR-QRRS of China built ballast waggons, 0209 is a 99 tonne bottom discharge and 0711 is an 80 tonne side dump waggon, both built and delivered in early 2011.
|
|

0209 CNR - QRRS China 150620 9326474 viewsQuarry 8 ballast loading area, CNR-QRRS of China built 99 tonne ballast waggons 0209 and 0220 await loading.
|
|

0209 CNR - QRRS China 150620 9328512 viewsQuarry 8 ballast loading area, CNR-QRRS of China built 99 tonne ballast waggon 0209 waits to be loaded.
|
|

0214 CNR - QRRS China 130720 1447483 viewsFlash Butt yard, CNR-QRRS of China built 99 tonne ballast waggons 0214 and 0212 loaded awaiting their next duty.
|
|

0214 CNR - QRRS China 130720 1448445 viewsFlash Butt yard, CNR-QRRS of China built 99 tonne ballast waggon 0214 loaded awaiting their next duty.
|
|

0220 CNR - QRRS China 150620 9327463 viewsQuarry 8 ballast loading area, CNR-QRRS of China built 99 tonne ballast waggon 0220 waits to be loaded.
|
|

0226 CNR - QRRS China 150729 9458516 viewsBing Siding, loaded CNR-QRRS of China built 60 m3 capacity ballast waggon 0226, loaded with ballast.
|
|

0235 CNR - QRRS China 150729 9457547 viewsBing Siding, loaded CNR-QRRS of China built 60 m3 capacity ballast waggon 0235, loaded with ballast.
|
|

0501 Magor USA 050518 2157465 viewsBing Siding. 3/4 view of 1963 built Magor USA waggon 501, the first of twenty waggons originally used on the Oroville Dam construction before coming to the Pilbara in January 1968 as ballast waggons.
|
|

0501 Magor USA 050518 2158496 viewsBing Siding. Side view of 1963 built Magor USA waggon 501, the first of twenty waggons originally used on the Oroville Dam construction before coming to the Pilbara in January 1968 as ballast waggons.
|
|

0502 Magor USA 050412 0772508 viewsQuarry 8, Shaw Siding area. Side view of 1963 built Magor USA ballast waggon 502.
|
|

0502 Magor USA 050412 0775540 viewsQuarry 8, Shaw Siding area. 3/4 view of 1963 built Magor USA ballast waggon 502.
|
|

0502 Magor USA 050518 2161472 viewsBing Siding. 3/4 view of 1963 built Magor USA waggon 502, one of twenty waggons originally used on the Oroville Dam construction before coming to the Pilbara in January 1968 as ballast waggons.
|
|

0502 Magor USA 050518 2162520 viewsBing Siding. Side view of 1963 built Magor USA waggon 502, one of twenty waggons originally used on the Oroville Dam construction before coming to the Pilbara in January 1968 as ballast waggons.
|
|

0503 Magor USA 050412 0762498 viewsQuarry 8, Shaw Siding area. Side view of 1963 built Magor USA ballast waggon 503.
|
|

0503 Magor USA 050412 0765487 viewsQuarry 8, Shaw Siding area. 3/4 view of 1963 built Magor USA ballast waggon 503.
|
|

0503 Magor USA 050518 2171499 viewsBing Siding. 3/4 view of 1963 built Magor USA waggon 503, one of twenty waggons originally used on the Oroville Dam construction before coming to the Pilbara in January 1968 as ballast waggons.
|
|

0503 Magor USA 050518 2172521 viewsBing Siding. Side view of 1963 built Magor USA waggon 503, one of twenty waggons originally used on the Oroville Dam construction before coming to the Pilbara in January 1968 as ballast waggons.
|
|
| 270 files on 14 page(s) |
1 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
|