Image search results - "c6084-3" |
040806 091254r645 viewsGoldsworthy Junction, BHP Goninan GE rebuild CM40-8MEFI 5666 'Taranto' serial 8412-11 / 94-157, was the first unit fitted with Electronic Fuel Injection to the 16FDL engine hence the EFI on the model designation, is in charge of the Weighbridge Calibration train which is situated in the middle of the switches at the Goldsworthy Junction. 5666 will do several trips back and forward over the weighbridge at various speed to allow the technicians to calibrate it as well as having to clear the mainline for loaded and empty train movements. 0915 hrs 6th August 2004.
|
|
202-31157 viewsYandi One, 307 km grade crossing, mid-train remote CM40-8MEFI Goninan GE unit 5666 'Taranto' serial 8412-11/94-157 and CM40-8ML unit 5663 'Newcastle' show the difference in the ALCo builds by the fuel tanks, 5666 was originally an M636C built by Comeng while 5663 was originally built by AE Goodwin.
|
|
253-3133 viewsNelson Point yard sees BHP dumper pilot locomotive 5666 'Taranto', a Goninan GE rebuild CM40-8MEFI model with serial 8412-11 / 94-157, 5666 was the first unit fitted with Electronic Fuel Injection to the 16FDL engine hence the EFI on the model designation.
|
|
253-3227 viewsNelson Point yard sees BHP dumper pilot locomotives 5666 'Taranto', a Goninan GE rebuild CM40-8MEFI model with serial 8412-11 / 94-157, 5666 was the first unit fitted with Electronic Fuel Injection to the 16FDL engine hence the EFI on the model designation, and in the background with compressor set #2 is 5633 which was a new build CM39-8 GE model by Goninan. A sharp eye will notice the difference in the fuel tanks of the two locomotives.
|
|
253-3328 viewsNelson Point yard sees BHP dumper pilot locomotive 5666 'Taranto', a Goninan GE rebuild CM40-8MEFI model with serial 8412-11 / 94-157, 5666 was the first unit fitted with Electronic Fuel Injection to the 16FDL engine hence the EFI on the model designation.
|
|
|
|
|
|