090912 2277r884 viewsBoodarie, at the entrance to the Herb Elliot port car dumper balloon loop the final unit of FMG's 15 General Electric built Dash 9-44CW locos 015 serial 58192 with compressor set 9003-9004 shunts from the loaded waggon line to the empty waggon line at the 4.2 km under Proceed Authority 57 to make way for the incoming loaded train. 12th September 2009.