Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Image search results - "g6012-1"
1062_001.jpg
1062 001267 viewsWelshpool, Goninan, Mt Newman Mining's GE C36-7M rebuild unit 5509 serial 4839-05 / 87-074 being road hauled to Port Hedland by Bell on a ninety four wheel float. This unit was rebuild from AE Goodwin ALCo C636 unit 5452 serial G6012-1. May 1987.
Jim Bisdee photo.
19794.jpg
19794216 viewsBassendean, Goninan workshops, former BHP Iron Ore Goninan GE rebuild C36-7M unit 5509, seen here stripped down to being an engine test bed, view from the no. 2 end. Sept 2003.
Jim Bisdee photo.
19795.jpg
19795174 viewsBassendean, Goninan workshops, former BHP Iron Ore Goninan GE rebuild C36-7M unit 5509, seen here stripped down to being an engine test bed, view from the no. 2 end. Sept 2003.
Jim Bisdee photo.
19796.jpg
19796127 viewsBassendean, Goninan workshops, former BHP Iron Ore Goninan GE rebuild C36-7M unit 5509, seen here stripped down to being an engine test bed, view from the no. 1 end. Sept 2003.
Jim Bisdee photo.
19797.jpg
19797112 viewsBassendean, Goninan workshops, former BHP Iron Ore Goninan GE rebuild C36-7M unit 5509, seen here stripped down to being an engine test bed, view from the no. 1 end. Sept 2003.
Jim Bisdee photo.
19798.jpg
19798110 viewsBassendean, Goninan workshops, former BHP Iron Ore Goninan GE rebuild C36-7M unit 5509, seen here stripped down to being an engine test bed, close up of front pilot. Sept 2003.
Jim Bisdee photo.
19799.jpg
19799105 viewsBassendean, Goninan workshops, former BHP Iron Ore Goninan GE rebuild C36-7M unit 5509, seen here stripped down to being an engine test bed, view of the radiator section with the lube filter and cooler visible on the no. 2 end. Sept 2003.
Jim Bisdee photo.
19800.jpg
1980097 viewsBassendean, Goninan workshops, former BHP Iron Ore Goninan GE rebuild C36-7M unit 5509, seen here stripped down to being an engine test bed, front on view of cab remains. Sept 2003.
Jim Bisdee photo.
242-01.jpg
242-01248 viewsNelson Point, BHP Goninan GE rebuild C36-7M unit 5509 serial 4839-05 / 87-074 about to be trucked to United Goninan Perth for eventual cutting down to the frame and heading to United Goninan Broadmeadow NSW as an engine test bed. May 2002.
242-02.jpg
242-0293 viewsNelson Point, BHP Goninan GE rebuild C36-7M unit 5509 serial 4839-05 / 87-074 about to be trucked to United Goninan Perth for eventual cutting down to the frame and heading to United Goninan Broadmeadow NSW as an engine test bed. May 2002.
242-03.jpg
242-03109 viewsNelson Point, BHP Goninan GE rebuild C36-7M unit 5509 serial 4839-05 / 87-074 about to be trucked to United Goninan Perth for eventual cutting down to the frame and heading to United Goninan Broadmeadow NSW as an engine test bed. May 2002.
242-04.jpg
242-0498 viewsNelson Point, BHP Goninan GE rebuild C36-7M unit 5509 serial 4839-05 / 87-074 about to be trucked to United Goninan Perth for eventual cutting down to the frame and heading to United Goninan Broadmeadow NSW as an engine test bed. May 2002.
242-05.jpg
242-05262 viewsNelson Point, BHP Goninan GE rebuild C36-7M unit 5509 serial 4839-05 / 87-074 about to be trucked to United Goninan Perth for eventual cutting down to the frame and heading to United Goninan Broadmeadow NSW as an engine test bed. May 2002.
251-09.jpg
251-0916 viewsNelson Point, BHP's recently retired Goninan WA ALCo C636 to GE C36-7M rebuild unit 5509 awaits its fate. Rebuilt in 1987 at Goninan's Welshpool factory from 1969 AE Goodwin built ALCo C636 with serial number G6012-1 and road number 5452 and assigned new serial number 4839-05 / 87-074. It was delivered in Mt Newman Mining orange and was named Chichester. 5509 was subsequently cut down in September 2003 and then sent to United Goninan's Lansdowne NSW facility for use as an engine test bed, then later to Broadmeadow NSW. 22nd April 2000.
251-10.jpg
251-1018 viewsNelson Point, BHP's recently retired Goninan WA ALCo C636 to GE C36-7M rebuild unit 5509 builders plate. 22nd April 2000.
5835_001_Welshpool_1987July.jpg
5835 001 Welshpool 1987July916 viewsWelshpool, Goninan rebuilt GE C36-7M unit 5509 'Chichester' serial 4839-05 / 87-074 rebuilt using Mt Newman Mining AE Goodwin ALCo C636 5452 serial G6012-1, on a Bell road float in July 1987.
Jim Bisdee photo.
5942_001_Welshpool_1986Sept.jpg
5942 001 Welshpool 1986Sept102 viewsWelshpool, Goninan workshops, Mt Newman Mining C636 ALCo unit 5452 serial G6012-1 built by AE Goodwin in May 1968 is undergoing a world first as it gets rebuilt into a GE C36-7M locomotive. In the September 1986 view the process has started and it is on shop bogies, by July 1987 it would become 5509. Sept 1986.
Jim Bisdee photo.
5946_001_Welshpool_1986Sept.jpg
5946 001 Welshpool 1986Sept94 viewsWelshpool, Goninan workshops, Mt Newman Mining C636 ALCo unit 5452 serial G6012-1 built by AE Goodwin in May 1968 is undergoing a world first as it gets rebuilt into a GE C36-7M locomotive, by July 1987 it would become 5509. Sept 1986.
Jim Bisdee photo.
5952_001.jpg
5952 00184 viewsWelshpool, Goninan workshops, Mt Newman Mining C636 ALCo unit 5452 serial G6012-1 built by AE Goodwin in May 1968 is undergoing a world first as it gets rebuilt into a GE C36-7M locomotive, by July 1987 it would become 5509. Sept 1986.
Jim Bisdee photo.
 
19 files on 1 page(s)

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2024 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional