Most viewed - 0206 |

206-19347 viewsThe western wall of Carawine Pool.
|
|

206-32324 viewsAn empty train on the Yarrie (former Goldsworthy) line with a string of Golynx ore waggons, built by Goninan WA to a Lynx Engineering design, and then the two types of the waggons from the Phelps Dodge Copper Mine, the ribbed units are built by Portec USA and the smooth ones built by Gunderson USA. All of these are belly dump waggons as opposed to the BHP fleet of rotary dump bodies.
|
|

206-34304 viewsPope Searle getting the hang of Windows.
|
|

206-23303 viewsToad yelling some sort of abuse to Pope, at Carawine Pool.
|
|

206-37303 viewsThe dining area at 42 Kingsmill Street.
|
|

206-29302 viewsAn empty train on the Yarrie (former Goldsworthy) line behind BHP 5633 'Hephaestus' built new in 1988 by Goninan as a GE CM39-8 model, serial 5831-12 / 88-082. The four CM39-8 units were upgraded to CM40-8 units following overhauls and finally scrapped in January 2016.
|
|

206-22299 viewsWhere Carawine Creek joins the Oakover River.
|
|

206-25298 viewsThe signs for Telfer, along the same lines as the Woodie Woodie signs.
|
|

206-24288 viewsThe signs for Telfer, along the same lines as the Woodie Woodie signs.
|
|

206-30288 viewsAn empty train on the Yarrie (former Goldsworthy) line behind BHP 5633 'Hephaestus' built new in 1988 by Goninan as a GE CM39-8 model, serial 5831-12 / 88-082. The four CM39-8 units were upgraded to CM40-8 units following overhauls and finally scrapped in January 2016.
|
|

206-35287 viewsPossibly a spaghetti sauce.
|
|

206-36286 viewsThe fridge at 42 Kingsmill Street.
|
|

206-28282 viewsAn empty train on the Yarrie (former Goldsworthy) line behind BHP 5633 'Hephaestus' built new in 1988 by Goninan as a GE CM39-8 model, serial 5831-12 / 88-082. The four CM39-8 units were upgraded to CM40-8 units following overhauls and finally scrapped in January 2016.
|
|

206-27272 viewsAn empty train on the Yarrie (former Goldsworthy) line behind BHP 5633 'Hephaestus' built new in 1988 by Goninan as a GE CM39-8 model, serial 5831-12 / 88-082. The four CM39-8 units were upgraded to CM40-8 units following overhauls and finally scrapped in January 2016.
|
|

206-33268 viewsAn empty train on the Yarrie (former Goldsworthy) line with a string of Golynx ore waggons, built by Goninan WA to a Lynx Engineering design, and then the two types of the waggons from the Phelps Dodge Copper Mine, the ribbed units are built by Portec USA and the smooth ones built by Gunderson USA and finally the Tomlinson Steel WA built hopper waggons. All of these are belly dump waggons as opposed to the BHP fleet of rotary dump bodies.
|
|

206-26266 viewsAn empty train on the Yarrie (former Goldsworthy) line behind BHP 5633 'Hephaestus' built new in 1988 by Goninan as a GE CM39-8 model, serial 5831-12 / 88-082. The four CM39-8 units were upgraded to CM40-8 units following overhauls and finally scrapped in January 2016.
|
|

206-21261 viewsCarawine Pool at Carawine Gorge, looking north.
|
|
|
|
|
|