Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > pr_website

Most viewed - pr_website
090814_2109r.jpg
090814 2109r568 viewsHunter Siding, the empty train takes the passing track under the power of two FMG General Electric built Dash 9-44CW units 011 serial 58188 and 010 serial 58187, while another pair of identical units 002 serial 58179 and 012 serial 58189 hold the mainline and will wait for a new PA to continue towards the port. The dust between the two trains is from the BHP access road. 14th August 2009.
040818_205238r.jpg
040818 205238r567 viewsNelson Point, BHP Billiton yard pilot EMD SD40 unit 3078 serial 31503 originally Southern Pacific unit SP 8422 and still wearing former owner IC&E blue and yellow livery with a loaded rake awaiting clearance though Car Dumper 2 18th August 2004.
060414_3465r.jpg
060414 3465r567 viewsNelson Point, BHP Billiton yard pilot locos EMD SD40 3080 serial 33674 frame 7083-4 originally Southern Pacific SD40 SP 8482 and only 3000 hp shares the yard with GE AC6000 6076 'Mt Goldsworthy' serial 51068 and at 6000 hp is double 3080's size, between shunts 15th April 2006.
140202_0448r.jpg
140202 0448r567 viewsNelson Point at Car Dumper One, in the process of dumping this view shows another modified type 'patio gate' arrangement on the front of BHP Billiton SD70ACe unit 4365 serial 20098203-010 part of an eighteen unit sixth order for EMD locomotive built at London Ontario. 2nd February 2014.
050110_175326r.jpg
050110 175326r565 viewsHarding Siding, Robe River ore waggon 074 built by Nippon Sharyo Nihon in 1971 is one of a few waggons that runs permanently coupled to another waggon. Unlike the Hamersley Iron system married pairs, the Robe fleet each have their own brake system and are coupled by a length of round bar as the Cape Lambert dumper only dumps one waggon at a time. Monday 10th January 2005.
080525_2339r.jpg
080525 2339r562 viewsBoodarie, sitting at the entry to Herb Elliot Port, FMG General Electric built Dash 9-44CW unit 007 serial 58184 shunts from the loaded waggon line with compressor waggon set 9003-9004. The loco will end up on the track in foreground as it shunts the compressor set on the empty waggon line. 25th May 2008.
040502_091608r.jpg
040502 091608r561 viewsBing Siding, BHP GE AC6000 6074 'Kalgan' serial 51066 leading EMD SD40-2 3084 serial 786263-35 originally Union Pacific UP 3643 at the 15.4 km grade crossing with a loaded Yandi train 2nd May 2004.
040807_121312r.jpg
040807 121312r558 viewsNelson Point freshly delivered BHP Billiton EMD SD40R unit 3095 serial 33677 frame 7083-7 and originally Southern Pacific SD40 SP 8485 is being shunted by Track Mobile #2 7th August 2004.
060719_7279r.jpg
060719 7279r554 viewsNelson Point, BHP Billiton examples of Electro-Motive built old and new motive power in the form of SD70ACe/LC unit 4307 'Shaw' serial 20038540-008 and SD40R unit 3095 serial 33677 / 7083-7. 19th July 2006.
080202_1918r.jpg
080202 1918r554 viewsIndee, at the 44 km post on the FMG railway a loaded ballast train heads south round the curve and into a summer rain squall. 2nd February 2008.
110414_0127r.jpg
110414 0127r553 viewsBoodarie, loco prep shed see BHP Billiton 'Pumpkin' unit 4326 'Spring' serial 20066862-055 being prepped on 9 Road with the FMG dumper road in the background. 4326 was built by Electro-Motive at London Ontario originally for BNSF railroad of the USA but was part of an order for 10 standard domestic USA model SD70ACe units diverted to BHP in BNSF base pumpkin orange. The ten units underwent a significant upgrade program to see them become lead unit capable. 14th April 2011.
080614_2605.jpg
080614 2605551 viewsNelson Point hard stand sees BHP Billiton's latest Electro-Motive SD70ACe unit 4331 serial 20066862-060 originally built for BNSF as BNSF 9189 in all over BNSF orange referred to as 'pumpkins'. A 300 tonne crane on the left and an even bigger 500 tonne crane combine to lift the 200 tonne mass of the 4300 hp SD70ACe locomotive, 14th June 2008.
060714_6737r.jpg
060714 6737r548 viewsHesta, a brace of BHP Billiton Electro-Motive built SD70ACe/LC mid-train units 4302 'Mooka' serial 20038540-003 and 4311 'Poonda' serial 20038540-012 are in full power as they assist a loaded train climbing the grade at the 226 km. 14th July 2006.
081217_0448r.jpg
081217 0448r547 viewsWoodstock Siding BHP Goninan GE rebuild and former cab-less CM40-8ML unit 5665 'Rotterdam' serial 8412-10 / 94-156 runs along the mainline with the rail or steel train under the FMG flyover. It is not uncommon to see long hood leading units on BHP work trains. 17th December 2008.
051023_6248r.jpg
051023 6248r546 viewsNelson Point hard stand, rear view of BHP Billiton Electro-Motive built SD70ACe/LC unit 4305 serial 20038540-006 showing radiator wing, dual rear marker lights and dynamic brake detail. 23rd October 2005.
080202_1810r.jpg
080202 1810r546 viewsPort Hedland wharf, CFCLA ballast waggon CHQY 708 B is unloaded off the vessel Kimberley Rose for road transporting to Cloud Break mine for use with TL 154 and a small ballast rake. 2nd February 2008.
040802_090026r.jpg
040802 090026r545 viewsRedbank, Nelson Point yard entrance BHP GE AC6000 6077 'Nimingarra' serial 51069 and Goninan CM40-8M rebuild 5654 'Kashima' serial 8412-11/93-145 arrive in Nelson Point with a loaded Yandi, of note was the mid-train engines EMD SD40R units 3090-3089 and CM40-8M 5636 had engineers on-board to carry out tests on the SD40R locomotives 2nd August 2004.
050110_175330r.jpg
050110 175330r545 viewsHarding Siding, Robe River ore waggon 730 built by Tomlinson Steel Perth in 1982 is one of a few waggons that runs permanently coupled to another waggon. Unlike the Hamersley Iron system married pairs, the Robe fleet each have their own brake system and are coupled by a length of round bar as the Cape Lambert dumper only dumps one waggon at a time. Monday 10th January 2005.
040807_184612r.jpg
040807 184612r544 viewsNelson Point, BHP Billiton EMD SD40R unit 3093 serial 33679 and originally Southern Pacific SD40 SP 8487 sits at the hard stand having been delivered earlier in the day 7th August 2004.
040812_123214r.jpg
040812 123214r543 viewsYarrie line 148 km, east of Taplin, BHP Billiton Goninan GE rebuild CM40-8M 5639 'Corunna Downs' serial 8281-03/92-128 works a 'mixed' of 12 ballast and 10 loaded GML waggons towards Hedland following a derailment further out near the Yarrie Mine, 1230 hrs 12th August 2004.
342 files on 18 page(s) 11

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2024 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional