Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > pr_website

Most viewed - pr_website
070501_9014r.jpg
070501 9014r659 viewsWedgefield, radiator section showing ownership details of Coote Industrial ALCo rebuild unit DR 8402 'Margaret' originally Hamersley Iron #3007 an AE Goodwin built ALCo C636 serial G6011-2, rebuilt by Comeng WA 1985 to C636R serial WA135 / C6011-02, then rebuilt by GTSA with an Alco 251F engine for the construction of the FMG line. 1st May 2007.
150412_7911.jpg
150412 7911658 viewsBoodarie, Roy Hill rotary tip 70m³ capacity waggons stored on the ground adjacent to their Flash Butt facility. 12th April 2015. View map here.
090121_0986r.jpg
090121 0986r656 viewsBoodarie Workshop BHP Billiton EMD built SD70ACe/LC (first order) 4302 'Mooka' serial 20038540-002 and built by Electro-Motive in London Ontario watches on with Goninan GE rebuild CM40-8M 5656 as units from the forth order of SD70ACe/LC units get commissioned by EDI personal. Units in view are (L to R) 4337, 4338, 4335, 4340, 4346 and 4339 21st January 2009.
040817_194500r.jpg
040817 194500r653 viewsNelson Point, BHP Billiton Goninan GE CM39-8 unit 5630 'Zeus' serial 5831-09 / 88-079 class leader of a batch of four new built units, 5630 ended up travelling 4,940,000 km when retired. Here it idles away next to TSB 2 building awaiting a path out of Nelson Point yard with the 'Recycle Rake' bound for the dumper at Finucane Island 1945 hrs 17th August 2004.
070823_0325r.jpg
070823 0325r652 viewsBing Siding, The David and Goliath of BHP Billiton's' motive power roster in the guise of GE AC6000 unit 6073 'Fortescue' serial 51065 and EMD SD40R unit 3089 serial 31512 originally Southern Pacific SD40 SP 8431 stand on the passing track waiting a run south to the mines 23rd August 2007.
080116_1372r.jpg
080116 1372r652 viewsChapman Siding, FMG 'control' ore waggon 2396 tare 22.9 tonnes with bar coupling for the 'married' pair showing the train pipe, waggon control pipe and electrical jumper. Built by the Zhuzhou Rolling Stock Works in China, stands on the passing track. 16th January 2008.
080525_2325r.jpg
080525 2325r651 viewsBoodarie, Great Northern Highway grade crossing sees FMG General Electric built Dash 9-44CW locomotive 010 serial 58187 leading sisters 012 serial 58189 and 003 serial 58180 with an empty train heading for Cloud Break mine. The very top of the failed BHP Billiton HBI plant can be seen over the fourth and fifth ore waggons. 25th May 2008.
041016_170918r.jpg
041016 170918r646 viewsNelson Point Car Dumper 3 roads BHP Billiton Goninan GE rebuild CM40-8M 5635 'Pippingarra' serial 8151-09 / 91-121 leads EMD SD40-2 3081 and SD40R 3089 awaiting their turn to spot through dumper 3 16th October 2004.
150129_7482.jpg
150129 7482646 viewsRedbank, running off the bridge over competitor BHP's railway Roy Hill's General Electric built ES44ACi unit RHA 1013 serial 62585 being delivered behind two ALE Kenworth prime movers. 29th January 2015.
050110_140552r.jpg
050110 140552r644 viewsHaving departed Ibis Siding five minutes earlier double General Electric built Dash 9-44CW Hamersley Iron units 7069 serial 47748 and 7077 serial 47756 work a 230 loaded waggon train heading north between Ibis and Gull sidings. Above the two locos the east mainline can be seen in the background which was part of the second last duplication project from Gull to Tunkawanna and is a single track section with only passing tracks being on the original west mainline section. Monday 10th January 2005.
050108_182036r.jpg
050108 182036r643 viewsDingo Siding, Hamersley Iron's General Electric built Dash 9-44CW unit 7083 serial 47762 heads up the motley collection of eleven tank waggons that form the Hamersley Iron fuel train. Saturday 8th January 2005.
171204_0998r.jpg
171204 0998r642 viewsRoy Hill Access Road, CFCLA's Goninan ALCo to GE rebuild CM40-8M locomotive CD 4302, originally Robe River Comeng NSW built ALCo M636 serial C6103-1 #9421, rebuilt by Goninan in 1993 with serial 8297-2 / 93-137 then to CFCLA in 2012, is being hired by Roy Hill and being delivered to their flash butt yard by Doolan's Heavy Haulage 4th December 2017. View map here.
050110_072701r.jpg
050110 072701r642 viewsParker Point, brilliant summer morning light captures the driver in charge of General Electric built Dash 9-44CW units 7073 serial 47752 and 7078 serial 47757 stops to have a chat with the driver of the Parker Point dumper pilot on 7096 serial 52843 all wearing the original Hamersley Iron 'Pepsi' livery. Monday 10th January 2005.
061209_8231r.jpg
061209 8231r642 viewsSeven Mile 38 Road, former Robe River AE Goodwin built ALCo M636 unit 9416 serial G6046-16 awaits a new owner. 9416 was originally built for Hamersley Iron as #4045 and was purchased by Robe right before shipping to Hamersley Iron and entered service in February 1973. The ducting on the hood is the air to air intercooler modifications that Robe trialled. Also of note is the unit is fitted with an ALCo C630 fuel tank, swapped when the C630 units were rebuilt into the CM40-8M units. 9th of December 2006.
090814_2105r.jpg
090814 2105r642 viewsHunter Siding, instrumented ore waggon pair 1685 'control' and 2686 'slave' from the original order built by CSR at their Zhuzhou Rolling Stock Works in China. 14th August 2009.
050102_170134r.jpg
050102 170134r641 viewsNelson Point, BHP GE AC6000 6072 'Hesta' serial 51064 leads EMD SD40-2 unit 3081 serial 786170-75 originally Union Pacific unit UP 3573 under the Redbank Bridge with their loaded train arriving into Nelson Point Yard 2nd January 2005.
150130_7570.jpg
150130 7570639 viewsPort Hedland, Wilson Street, now with the second ALE Kenworth prime mover coupled up Roy Hill's General Electric built ES44ACi unit RHA 1011 serial 62583 heads off to be placed on rails. 30th January 2015.
070414_8774.jpg
070414 8774638 viewsNelson Point Locomotive Overhaul Workshop, brand new BHP Billiton Electro-Motive built SD70ACe/LC unit 4314 serial 20058712-001 during 'fit out' work by EDI 14th April 2007.
080120_1443r.jpg
080120 1443r637 viewsRowley Yard which was the name for FMG's marshalling facilities has eleven of the General Electric built Dash 9-44CW locomotives lined up, 003, 013, 001, 010, 005, 014, 007, 004, 015, 002 and 011 coupled to ore waggon pair 2264 - 1263, pointing south. 20th January 2008.
061209_8235r.jpg
061209 8235r634 viewsSeven Mile 38 Road, former Robe River AE Goodwin built ALCo M636 unit 9413 serial G6060-4 from December 1971, originally numbered 262.004 during construction, then 1713 and finally 9413 awaits a new owner. The ducting on the hood is the air to air intercooler modifications. 9th of December 2006.
342 files on 18 page(s) 7

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2024 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional