Most viewed - pr_website |

080524 2247r1517 viewsBoodarie, panoramic view of FMG's General Electric built Dash 9-44CW unit 004 serial 58181 leading two sister units, 130 ore waggons and a two waggon compressor set as they pass in front of the failed BHP Billiton HBI plant. 24th May 2008.
|
|

120307 0074 brian marsh1461 viewsThe first BHP Billiton Progress Rail built SD70ACe unit at Muncie USA. Note the lack of nose grab irons, the unit also has two new EMD type roof mounted antennas, a larger antenna at the rear, no grabs on the rear, no grabs behind the inverter area and has additional access openings in the side railing, just a few details of note. Window protectors have not yet been installed and step well guards will be installed in Australia.
Photo by Brian Marsh, Overland Models, Inc.
|
|

150713 9439r1418 viewsHerb Elliot Port, South Hedland sees FMG's Electro-Motive Division built SD90MAC-H2 locomotive 915 serial 976833-17, originally UP 8538 built in 1999 and rebuilt by Progress Rail Kentucky USA in 09/2014, seen here 13th July 2015.
|
|

130721 2193r1377 viewsBoodarie, empty waggon pair 3357 and 4358 head south back to the mines. A pair of waggons from orders for 882 pairs built by China Northern or CNR QRRS Qiqihar Railway Rolling Stock Co between 2010 and 2012. 21st July 2012.
|
|

5835 001 Welshpool 1987July1363 viewsWelshpool, Goninan rebuilt GE C36-7M unit 5509 'Chichester' serial 4839-05 / 87-074 rebuilt using Mt Newman Mining AE Goodwin ALCo C636 5452 serial G6012-1, on a Bell road float in July 1987.
Jim Bisdee photo.
|
|

5953 001 Welshpool 1987Jan1351 viewsBuilders plate on Goninan rebuilt GE C36-7M unit 5506 'Mt Whaleback' serial 4839-01 / 87-071 rebuilt using Mt Newman Mining AE Goodwin ALCo C636 5455 serial G6012-4. January 1987.
Jim Bisdee photo.
|
|

031119 165830r1321 viewsNelson Point, Ex Southern Pacific SD40T-2 loco 8335 serial 786175-9 built in April 1979 and retired by Union Pacific 23rd May 2001, this unit was purchased as a spares source for the other SD40 style units. The T signifies that it is a Tunnel motor with a modified radiator intake to allow 'cool' running through the Sierra Nevada tunnels. And the 'M' with a lighting rod through it meant that it was a master unit for radio controlled helpers, used in the Tehachapi mountains. 19th November 2003.
|
|

54991309 viewsNelson Point, Mt Newman Mining Comeng NSW built ALCo M636 model locomotive 5499 serial C6096-4 is the last active ALCo on the roster of BHP 22nd April 2000.
|
|

030726 121315r1210 viewsNelson Point Loco Overhaul Workshop sees BHP Billiton Goninan GE build CM39-8 unit 5632 'Poseidon' serial 5831-11 / 88-081 as it waits for a new engine. Although this was the first unit painted, sister loco 5639 saw the first mainline working of the new scheme to Yandi. This shot was taken on Saturday 26th July 2003.
|
|

051022 6068r1194 viewsNelson Point hard stand area, the second BHP Billiton Electro-Motive built SD70ACe/LC unit to be unloaded off the Jumbo Vision was 4302 serial 20038540-003, seen being towed by 5667 to the service shop for fitting out by EDI, Electro-Motive's Australian agents. 22nd October 2005.
|
|

040127 163743r1177 viewsNelson Point, SD40-2 loco 3085 serial 786170-25 originally Union Pacific unit UP 3523 stands out the front of the Locomotive Overhaul Shop, awaiting repairs 27th January 2004.
|
|

040403 103310r1176 viewsNelson Point, Car Dumper 3, BHP GE AC6000 6071 'Chichester' serial 51063 and SD40-2 unit 3083 serial 786170-2 originally Union Pacific UP 3500 push the empty rake towards the south yard in a method called the 'Pull-Push' style of spotting and clearing rakes 3rd April 2004.
|
|

090915 2477r1176 viewsForrest Siding, north end looking south on the FMG line at the 125.75 km. This siding was orginally 3 km long before having the north end becoming duplicated back to Durack and the south end extended 3 km. 15th of September 2009. Geodata location data.
|
|

050319 0082r1173 viewsNelson Point, Ex Southern Pacific SD40T-2 loco 8335 serial 786175-9 built in April 1979 and retired by Union Pacific 23rd May 2001, this unit was purchased as a spares source for the other SD40 style units. The T signifies that it is a Tunnel motor with a modified radiator intake to allow 'cool' running through the Sierra Nevada tunnels. And the 'M' with a lighting rod through it meant that it was a master unit for radio controlled helpers, used in the Tehachapi mountains. 19th March 2005.
|
|

090915 2481r1168 viewsForrest Siding, south end looking south on the FMG line at the 128.96 km. This siding was orginally 3 km long, the south end here was extended a further 3 km towards the flyover bridge over BHP. 15th of September 2009. Geodata location data.
|
|

031109 140045r1167 viewsNelson Point, the first actual EMD SD40 model locomotive to arrive in Australia GECX 6415 serial 31542 frame 7861-52 built April 1966 for Southern Pacific as SP 8461 and still wearing previous owner IC & E blue and / yellow livery with 'fire cracker' aerial waits patiently on the back of a Brambles heavy-haul float with the tarp due to some quarantine issues and an officer from AQIS was in attendance as foreign soil had been found 9th November 2003.
|
|

090915 2474r1149 viewsDurack Siding location on the FMG line at the 98 km, looking south, this was a single ended spur. 15th of September 2009. Geodata location here.
|
|

080614 26291132 viewsPort Hedland, Gilbert Street, the last BHP Billiton Electro-Motive built SD70ACe 'Pumpkin' 4328 serial 20066862-057 and originally destined to be BNSF 9186 is turning into Gate 9 after being unloaded off the heavy lift ship DA QIANG Saturday 14th June 2008.
|
|

040530 150318r1124 viewsNelson Point Car Dumper 2 holding roads, BHP Billiton Goninan GE rebuild CM40-8M units 5642 'Wallareenya' serial 8281-07 / 92-131, 5669 'Beilun' serial 8412-02 / 95-160 and 5659 'Kobe' serial 8412-04 / 94-150 show some of the differences amongst the rebuild, 42 was a Goodwin built C636 ALCo and 59 was also build by Goodwin but an M636 hence both round tanks while 69 was a Comeng built M636 with a larger fuel tank. 30th May 2004.
|
|

081225 0720r1123 viewsTurner North on Christmas Day 2008 sees the first BHP Billiton Electro-Motive built SD70ACe 'Pumpkin' unit 4332 serial 20066862-061, originally built for BNSF, to be fitted out as a lead unit. This cab shot shows some of the external modifications to allow it to lead. In-fill step covers, second handrail, second (tropical) roof, bifurcation of main air line, AM/FM CD player-radio and removal of sun shades.
|
|
346 files on 18 page(s) |
 |
 |
 |
 |
 |
 |
 |
9 |  |
 |
 |
 |
 |
 |
 |
 |
|