Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Victorian negative and digital Albums > 0108

Most viewed - 0108
108-06.jpg
108-06349 viewsMurchison East Ascom Jumbo silo complex, around the curve north of the station, shows the grain loading siding, No.2 Rd and the main on the right.
108-05.jpg
108-05347 viewsMurchison East silo complex, elevation of the Ascom Jumbo silo elevator, mobile grain bins in foreground.
108-08.jpg
108-08347 viewsMurchison East silo complex, elevation of the Ascom Jumbo elevator tower, inflow grate and road outflow spout.
108-16.jpg
108-16346 viewsToolamba station building and platform, track removed, opening in platform where signal box once stood.
108-01.jpg
108-01345 viewsMurchison East silo complex, detail photos Ascom Jumbo silo rail outflow spout, right side elevation, hopper silo.
108-04.jpg
108-04345 viewsMurchison East silo complex, looking south, yard layout, early Ascom outflow spout, with Murphy outflow spout further down.
108-03.jpg
108-03344 viewsMurchison East silo complex, detail photos Ascom Jumbo silo rail outflow spout, left side elevation.
108-10.jpg
108-10344 viewsMurchison East silo complex, detail photos Ascom Jumbo elevator tower.
108-11.jpg
108-11344 viewsMurchison East silo complex, detail photos of early Ascom style silo, elevator tower.
108-13.jpg
108-13342 viewsMurchison East looking towards Melbourne, yard and station overview, gravity track on the left, station platform on the right, Murphy silo and horizontal grain bunker at left.
108-15.jpg
108-15338 viewsMurchison East station platform building, goods shed.
108-02.jpg
108-02336 viewsMurchison East silo complex, detail photos Ascom Jumbo silo rail outflow spout, front elevation.
108-07.jpg
108-07334 viewsMurchison East Ascom Jumbo silo complex outflow spout, points from No.2 Rd to the grain siding, looking south.
108-18.jpg
108-18334 viewsToolamba station overview, station building, looking north, platform cut back and track removed.
108-09.jpg
108-09332 viewsMurchison East silo complex, detail photos Ascom Jumbo silo road outflow spout.
108-14.jpg
108-14332 viewsMurchison East silo complex, detail photo of Murphy silo rail loading spout.
108-12.jpg
108-12327 viewsMurchison East silo complex, detail photos of early Ascom style silo, rail loading spout.
108-20.jpg
108-20324 viewsTatura yard derrick crane.
108-17.jpg
108-17319 viewsToolamba station building and sign, platform edge cut back, platform track removed, Ford XE Falcon.
108-19.jpg
108-19311 viewsToolamba mainline view water tank, block point location in background.
37 files on 2 page(s) 1

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional