Most viewed |
150523 8218181 viewsNelson Point Yard, BHP Billiton diesel fuel tank waggon 0021, total capacity of 117 m3 for a nominal capacity of 113 m3 built in China by CNR - QRRS.
|
|
208-2-21181 viewsMt Lawley, Westrail L class L 263 Clyde Engineering EMD model GT26C serial 68-553 leads the empty cars from the Indian Pacific to Forrestfield.
|
|
237-19181 viewsPilga Station ruins and old buildings. Geodata .
|
|
244-18181 viewsCoomunga, stabled on the siding, Transfield track machine TMN 02 ballast regulator. 6th April, 2003.
|
|
111-24180 viewsNorth Geelong station, V/Line broad gauge N class N 470 'City of Wangaratta' Clyde Engineering EMD model JT22HC-2 serial 86-1199 and N set work an up Geelong passenger train to Melbourne as it splits semaphore signal posts 33 and 34, driver only operation.
|
|
138-17180 viewsBendigo North, taken from D Box, looking towards Eaglehawk, line set for Eaglehawk, Echuca line in the middle, and the far points to the right lead to Bendigo Workshops, Siding B and Rangelea, while the track at the far right 'W' and leads to Siding A and the old goods loading platform.
|
|
189-10180 viewsThe Rock, located at the 550.29 km on NSW Main South line, view looking north with the along the Mainline with the Down Loop at right and the branch line to Oaklands coming in on the left with the ground frame E and signal, the No. 54 points from the Mainline to Up Loop are visible in front of the signal bridge.
|
|
189-16180 viewsYerong Creek, located at the 565.08 km on the NSW Main South line, view looking north along the mainline, then the Loop and Goods Siding with stored car carrying waggons.
|
|
197-04180 viewsGoldsworthy Junction, looking west with the end of the triangle or wye, signal post is GJ 7, empty iron ore train behind BHP's Goninan 1988 build GE CM39-8 unit 5632 'Poseidon' serial 5831-11 / 88-081.
|
|
201-06180 viewsMidland, the first Perth built NR class NR 61 Goninan GE model Cv40-9i serial 7250-11/96-263 shunts at Midland with two brand new NR units.
|
|
201-09180 viewsMidland, the first Perth built NR class NR 61 Goninan GE model Cv40-9i serial 7250-11/96-263 shunts at Midland with two brand new NR units.
|
|
205-17180 viewsWittenoom, top of Bee Gorge, Pope decided it was time for bacon and egg sangos, location is 22 17'46.38" S 118 15'50.08" E, 688 metres.
|
|
208-2-01180 viewsToodyay, emus at the Free Range Emu Farm.
|
|
208-2-03180 viewsToodyay, emus at the Free Range Emu Farm.
|
|
060116 2683180 viewsAOPY and WOE iron ore waggons loaded with lump ore depart West Kalgoorlie for Esperance as the Prospector awaits entry to continue to Kalgoorlie, while Pope Searle takes in the action, West Kalgoorlie 16th January 2006.
|
|
051101 6420180 viewsParkeston, AHBY 0059 one of sixty five AHBY type ballast hoppers built by EDI Rail at their Port Augusta Workshops for ARG in 2001-02 for the Darwin line, also the FMG construction in 2008, here in limestone quarry products service.
|
|
223-31180 viewsPossum Siding, a loaded train behind a pair of Hamersley Iron General Electric built Dash 9-44CW units 7072 serial 47751 and 7074 serial 47753 with the crew change completed, the empty is starting to roll on the passing track. 21st October 2000.
|
|
208-2-13180 viewsMt Lawley, Westrail L class L 272 Clyde Engineering EMD model GT26C serial 69-621 leads the empty cars from the Indian Pacific to Forrestfield.
|
|
208-2-32180 viewsDimboola, the Up Dimboola pass lead by Victorian Railways liveried B class B 65, Clyde Engineering EMD model ML2 serial ML2-6 with D van and N set.
|
|
160522 2025180 viewsParkeston, 5MP2 steel train, one of the bar coupled pair of waggons making up RKAF type 2-pack rail transport waggon RKAF 4 for a length of 29.8 metres loaded with new rail, these 'pairs' are rebuilt from a pair of RKJX type waggons. The RKJX were rebuilds from V/Line VOBX type waggons.
|
|
16175 files on 809 page(s) |
|
|
|
|
|
|
|
|
103 | |
|
|
|
|
|
|
|