Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Most viewed
221-04.jpg
221-04145 viewsHardie Siding, with the days of C36-7M operations numbered, Goninan rebuild 5513 serial 88-078 / 4839-02 from ALCo C636 5453 holds the mainline with a loaded train bound for Finucane Island.
223-13.jpg
223-13145 viewsPossum Siding, Hamersley Iron loco 7082 a General Electric built Dash 9-44CW serial 47761 leads sister unit 7080 with an empty train just inside the loop waiting to effect a crew change. 21st October 2000.
223-17.jpg
223-17145 viewsPossum Siding, trailing view of Hamersley Iron loco 7080 a General Electric built Dash 9-44CW serial 47759 second unit behind sister locomotive 7082 looking south. 21st October 2000.
160101_9790.jpg
160101 9790145 viewsWittenoom Gorge, Gorge Mine area, mine adit no. 2. Geodata: 22°19'28.8"S 118°19'41.7"E .
150507_8100.jpg
150507 8100145 viewsFMG Solomon Line, bridge over the Fortescue River South which drains out of Hamersley Gorge. Geodata: -22.1842517 118.0346950 .
150518_8120.jpg
150518 8120145 viewsBHP Iron Ore old and retired ore stacker #4 and bucket wheel reclaimer #4 are blown apart to aid in the scrapping process.
160128_00568.jpg
160128 00568145 viewsWedgefield, Sims Metal Yard, the sparks fly as the remains on an ALCo frame are thermal lanced into smaller manageable pieces, a GE V16 7FDL-16 engine is also cut in half.
232-36.jpg
232-36145 viewsYandi One balloon loop cab-less BHP Goninan GE rebuild CM40-8ML (L for LocoTrol) 5665 'Rotterdam' serial 8412-10 / 94-156 in the mid train consist about to enter the tunnel on the 18th of February 1997. This loco was built cab-less to control remote consists and here is in use as a slave, being controlled by a unit with a cab. GeoData.
208-2-23.jpg
208-2-23145 viewsMidland, The York Jazz Festival special train pauses at the platform behind Westrail DA class unit DA 1571 a Clyde Engineering EMD G26C serial 72-758.
160522_2068.jpg
160522 2068145 viewsBinduli, 5MP2 steel train, RKVY 8002 wide steel plate tilt waggon, built as part of a batch of five units by Goninan Bassendean WA in 2011, loaded with plates.
160522_2090.jpg
160522 2090145 viewsParkeston, 6MP4 intermodal train, RQSY 34974 container waggon, Toll half height curtainsider 5TC 205 and Pedemonts PHR613 bulk container.
160522_2092.jpg
160522 2092145 viewsParkeston, 6MP4 intermodal train, platform 1 of 5-pack RRRY 7007 well waggon set, one of nineteen built in China at Zhuzhou Rolling Stock Works for Goninan in 2005, ARLS 505 reefer and Toll half height curtainsider 5TC 227
160522_2096.jpg
160522 2096145 viewsParkeston, 6MP4 intermodal train, platform 5 of 5-pack RRRY 7007 well waggon set, one of nineteen built in China at Zhuzhou Rolling Stock Works for Goninan in 2005, Harris Refrigerated Logistics HARR 466001 reefer and Toll TCML 48583 48' container.
160522_2099.jpg
160522 2099145 viewsParkeston, 6MP4 intermodal train, platform 3 of 5-pack RRRY 7006 well waggon set, one of nineteen built in China at Zhuzhou Rolling Stock Works for Goninan in 2005, Linfox LSDU half height side door container and FCL FBGU 480273 48' container.
040530_143906.jpg
040530 143906145 viewsNelson Point, compressor waggon set No. 6, made from a pair of cut down Magor USA built 91 ton ore waggons, originally ex Oroville Dam, California.
040627_080053.jpg
040627 080053145 viewsNelson Point, fuel tank waggon 0020 82 kL capacity, built by Comeng NSW for BP as RTD 2, last of two such tanks, used on Mt Newman line, unsure when converted to 0020.
040502_085548.jpg
040502 085548145 viewsMooka Siding, trailing view of the 'Pony' heading south, 50 ton waggon 6703, one of three 'special' waggons converted from Magor USA built ore waggons, loaded with concrete sleepers is closet to camera.
030403_153816.jpg
030403 153816145 viewsGladstone, former South Australian Railways AE Goodwin built DL500G ALCo designated the 700 class, class leader 701 serial G6042-2 leads a grain train being loaded on the 3rd April 2003.
040407_075425.jpg
040407 075425145 viewsMooka Siding, LED colour light signal head MAN 6 located at the north end of the passing siding, departure signal.
242-08.jpg
242-08145 viewsNelson Point, BHP Goninan GE rebuild C36-7M unit 5508 serial 4839-04 / 87-073 about to be trucked to United Goninan Perth for eventual overhaul and repainting into the Pilbara Rail livery and leased to Pilbara Rail re-numbered 5052 as a shunt unit at Dampier. May 2002.
16104 files on 806 page(s) 143

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2024 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional