Most viewed |

051023 6119r974 viewsNelson Point hard stand, BHP Billiton's brand new Electro-Motive built SD70ACe/LC unit 4301 serial 20038540-002 is lowered onto the rails by three Boom Logistics cranes, a 200, 160 and 120 tonne units. Sunday 23rd October 2005.
|
|

050204 080056r973 viewsMooka, BHP GE AC6000 final unit 6077 serial 51069 with EMD SD40R 3091 serial 31496 originally Southern Pacific SD40 SP 8415 power along at the 30 km mark with an empty 200 waggon train, smoke can just been seen coming from mid train units 6071 and 3083 4th February 2005.
|
|

060225 2978r967 viewsNelson Point yard sees BHP Billiton Electro-Motive built SD70ACe unit 4309 'Gidgi' serial 20038540-010 passing General Electric built AC6000 6076 'Mt Goldsworthy' serial 51068. 4309 is leading a loaded train towards the dumpers while 6076 is taking empty cars to the departure yard. 25th February 2006.
|
|

179-32961 viewsGheringhap, internal view of signal box showing the electric staff instruments for the North Geelong C section on the left and the Meredith section on the right, above each exchanger is the respective bell for each section, along with wall clock and Code of Bell Signals wall chart, to left is a station stretcher and hand lamp and on the right the electric staff carriers or hoops. At the very left of frame the train register desk can be just seen, through the opening in the wall behind the exchangers can be seen the 18+2 lever frame levers.
|
|

140603 0700r961 viewsHere's the Troopy at the panel shop with the mudguard and fender removed showing the relays and engine bay. June 2014.
|
|

232-37960 viewsYandi One balloon loop cab-less BHP Goninan GE rebuild CM40-8ML (L for LocoTrol) 5665 'Rotterdam' serial 8412-10 / 94-156 in the mid train consist about to enter the tunnel on the 18th of February 1997. This loco was built cab-less to control remote consists and here is in use as a slave, being controlled by a unit with a cab. GeoData.
|
|

060417 3531958 viewsNelson Point Yard, still relatively new Electro-Motive built SD70ACe/LC unit 4305 serial 20038540-006 'Coonarie' under lights awaits it next job on the evening 17th April 2006.
|
|

040801 144102957 viewsWalla Siding, Goninan built, Lynx Engineering designed ore waggon 4403 made from 5Cr12Ti stainless steel these waggons are known as Golynx waggons, asset number 203510 with serial 950124-004 and build date 02/2004. 1st August 2004.
|
|

050625 3840955 viewsGoldsworthy Junction, BHP Goninan GE rebuilt model CM40-8M unit 5648 'Kwangyang Bay' serial 8412-06 / 93-139 long end leading runs off the Goldsworthy or GML line past signal GJ 2 onto the Newman mainline with the Sundowner on its return to Hedland 25th June 2005.
|
|

160522 2092954 viewsParkeston, 6MP4 intermodal train, platform 1 of 5-pack RRRY 7007 well waggon set, one of nineteen built in China at Zhuzhou Rolling Stock Works for Goninan in 2005, ARLS 505 reefer and Toll half height curtainsider 5TC 227
|
|

040807 185900r954 viewsNelson Point BHP Billiton EMD SD40R unit 3093 serial 31498 originally Southern Pacific SD40 SP 8417 waits on a road float to be lifted onto rails the following day 7th August 2004.
|
|

040802 141058r954 viewsGoldsworthy Junction, BHP Billiton Goninan GE built CM39-8 5632 'Poseidon' serial 5831-11 / 88-081 in charge of the 'Recycle Rake' is traversing the Transfer Road, this train conveys ore from Nelson Point to Finucane Island, sometimes twice a day. The line to the right is the line to the Junction, Yarrie and Bing. 1410 hrs 2nd August 2004.
|
|

080621 2783r951 viewsTabba Siding at the 83.4 km crossing, the final member of the original BHP Billiton order for thirteen Electro-Motive built SD70ACe/LC units 4313 serial 20038540-014 leads CM40-8M 5653 with a loaded 330 waggon train from Yandi 2 mine. Other locos in the consist are two set of mid train units consisting of CM40-8M-SD40R-SD40R and CM40-8-SD40R-SD40R. 21st June 2008.
|
|

110208 9328r951 viewsBing Siding, BHP Billiton's 4354 'ANZAC' an Electro-Motive built EMD SD70ACe unit with serial 20088019-008 from the fifth order of nine locos built in London Ontario. This image shows the ladder stirrups on the nose have been removed and there has been a trial set of sliding gates fitted to the gate to prevent a fall from heights when the step well plate is installed. This style of handrail didn't last long. 8th February 2011.
|
|

050204 080155r948 viewsMooka, BHP mid train units of GE AC6000 6071 'Chichester' serial 51063 with the metal windscreen protecting blinds up and EMD SD40-2 unit 3083 serial 786170-2 originally Union Pacific UP 3500 at close to line speed of 80 kph/h at the 30 km, 4th February 2005.
|
|

040819 040126r941 viewsNelson Point, BHP Billiton EMD SD40R unit 3087 serial 31519 and originally Southern Pacific SD40 SP 8438 has been placed at the wheel lathe road for attention in the morning 19th August 2004.
|
|

091002 2602r934 viewsPort Hedland, at the 11.8 km on the big curve trailing BHP Billiton locomotive 4311 Poonda from the original order for thirteen SD70ACe/LC model EMD units from Electro-Motive and built in London, Ontario in August 2005 with serial 20038540-012 assists in powering an empty 330 waggon train south to the mines, these units were delivered with the round middle rail on the handrail and a standard cab which resulted in all subsequent orders having the isolated or Whisper cab fitted. 4311 and its twelve stablemates were traded back to Progress Rail and sent to the USA in January 2015. 2nd October 2009.
|
|

091002 2629r934 viewsPort Hedland, at the 11.8 km on the big curve the second set lead controlling remote BHP Billiton locomotive 4353 from the fifth order for nine SD70ACe model EMD units from Electro-Motive and built in London, Ontario in 2009 with serial 20088019-007 controls older stablemate 4303 Walla from the original SD70ACe/LC order. 4353 would later be named Warman. 2nd October 2009.
|
|

050625 3829933 viewsNode #2 at the 38 km on the GML sees BHP Goninan GE rebuilt model CM40-8M unit 5648 'Kwangyang Bay' serial 8412-06 / 93-139 long end leading the Sundowner along the main on its return to Hedland 25th June 2005.
|
|

238-05925 viewsPort Hedland Harbour, heavy lift ship Happy Buccaneer (IMO: 8300389) sits at Finucane Island D Berth delivering a new shiploader for BHP Billiton. 1st November 2003. Geodata . Back in time here the ship cranes were only 550 tonne each, these are now 700.
|
|
| 19088 files on 955 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
21 |  |
 |
 |
 |
 |
 |
 |
|