Most viewed |
050625 3788373 viewsTabba Tabba Creek bridge at the 48 km on the GML sees BHP Goninan GE rebuilt model CM40-8M unit 5648 'Kwangyang Bay' serial 8412-06 / 93-139 long end leading the Sundowner on its return to Hedland 25th June 2005.
|
|
040409 121920373 viewsBoodarie, Goninan built Golynx waggon 8416 with serial number 950088-326 from November 2011, which is a modified version of the BHP mainline waggons for service on the Goldsworthy system as a bottom discharge waggon. 9th of April 2004.
|
|
109-12372 viewsSeymour, rationalised yard view with V/Line broad gauge stabled grain train, X class X 47 Clyde Engineering EMD model G26C serial 75-794 and S class S 307 'John Pascoe Fawkner' Clyde Engineering EMD model A7 serial 57-171, V/Line Grain VHGF type bogie grain waggons.
|
|
223-27372 viewsPossum Siding, the no 2 or B ends of a pair of Hamersley Iron General Electric built Dash 9-44CW locomotives 7072 and 7074. 1500 hrs 21st October 2000.
|
|
110414 0104r372 viewsFinucane Island, bit of history in this image, the second unit has been returned to the USA, the white index waggons are no longer used, the road way has been moved well left of this and a second track no occupies this road and the HBI plant in the background has been demolished. BHP Billiton's 4315 'Mijarrpa' serial 20058712-002 from the second order of EMD SD70ACe/LC locomotives built by Electro-Motive in London Ontario in October 2006 leads a loaded train towards the car dumpers at Finucane Island on what used to be the Goldsworthy Mining Ltd mainline. 14th April 2011.
|
|
040810 125600r369 viewsHesta Siding, BHP GE AC6000 6074 'Kalgan' serial 51066 leading EMD SD40R 3088 serial 31513 originally Southern Pacific SD40 SP 8432 with a loaded train powering upgrade 10th August 2004.
|
|
050625 3768369 viewsBroome Rd grade crossing at the 57.1 km on the GML sees BHP Goninan GE rebuilt model CM40-8M unit 5648 'Kwangyang Bay' serial 8412-06 / 93-139 long end leading the Sundowner on its way back to Hedland across the highway 25th June 2005.
|
|
090814 2059r369 viewsWoodstock, having only been delivered the month before new BHP Billiton 4348 an Electro-Motive built EMD SD70ACe model locomotive with serial 20088019-002, from the fifth order for nine units, is under commissioning as a remote unit on a 330 waggon train. The unit has since been named 'Hematite'. 14th August 2009.
|
|
091002 2629r369 viewsPort Hedland, at the 11.8 km on the big curve the second set lead controlling remote BHP Billiton locomotive 4353 from the fifth order for nine SD70ACe model EMD units from Electro-Motive and built in London, Ontario in 2009 with serial 20088019-007 controls older stablemate 4303 Walla from the original SD70ACe/LC order. 4353 would later be named Warman. 2nd October 2009.
|
|
146-18368 viewsSeymour, preserved broad gauge Victorian Railways RY type four wheel open waggon RY 1504, side view. Built as a GZ type bulk grain waggon in 1938 at Newport Workshops, in 1956 recoded to IZ type, then in 1965 to RY type.
|
|
050624 3268368 viewsBroome Rd grade crossing at the 57.1 km on the GML sees BHP Billiton Goninan GE rebuilt model CM40-8M unit 5636 'Munda' serial 8151-11 / 91-122 leads the Sundowner on its way to Goldsworthy across the highway 24th June 2005.
|
|
105-06366 viewsWallan station platform, V/Line broad gauge T class T 410 Clyde Engineering EMD model G18B serial 68-626 roars past the up platform with the up Wodonga oil train 9224 at 1845 hrs, Plasser tamper in back road.
|
|
223-29366 viewsPossum Siding, rear view of Hamersley Iron loco 7072 a General Electric built Dash 9-44CW model serial 47751 leads sister unit 7074 with a loaded train as they effect a crew change. 21st October 2000.
|
|
050624 3249366 viewsTabba Tabba Creek, 46.5 km on the GML sees BHP Billiton Goninan GE rebuilt model CM40-8M unit 5636 'Munda' serial 8151-11 / 91-122 leads the Sundowner on its way to Goldsworthy on top of the bridge 24th June 2005.
|
|
050624 3297366 viewsDe Grey River bridge, 82.9 km on the GML sees BHP Billiton Goninan GE rebuilt model CM40-8M unit 5636 'Munda' serial 8151-11 / 91-122 leads the Sundowner on its way to Goldsworthy 24th June 2005.
|
|
170-07365 viewsDookie, track view looking towards Shepparton, west, along the mainline, crossover to silos and gravitational road on the left, GEB sub-terminal silo complex visible on the right.
|
|
100-03365 viewsAlbury station yard overview looking south, from Wilson Street footbridge, NSWSRA standard gauge 81 class 8178 Clyde Engineering EMD model JT26C-2SS serial 85-1097 double heading with a sister 81 class, both in candy livery, Sydney bound goods, 2 lever ground frame beside loco. Geodata.
|
|
194-08364 viewsWittenoom Gorge, Colonial Mine, asbestos mining remains, sealed up main mine adit or entry point, safety statistic board on the left, this was one of the main drives for the Colonial Mine. A couple of historical images can be seen here: SLWA image b4232624_9 and here: SLWA image b1923178_1.
|
|
040815 165832363 viewsNelson Point Car Dumper 3, a new Goninan built ore waggon 4239, one of 126 such waggons constructed during 1997 out of 3CR12 stainless steel in an effort to eliminate painting and to reduce wear on the waggon body. Note the rounded bottom edge and tapered floor, this design was designated HC7081. 15th August 2004.
|
|
215-13362 viewsPeterborough, a new Perth electric suburban A Set being transported across the country on the rear of an SP service, AEA class AEA 220 and an AEB, built by Walkers Limited in Maryborough, Qld. The narrow gauge power bogies are in the following open waggon.
|
|
16099 files on 805 page(s) |
|
|
|
|
|
|
|
|
22 | |
|
|
|
|
|
|
|