Most viewed |

080621 2783r1124 viewsTabba Siding at the 83.4 km crossing, the final member of the original BHP Billiton order for thirteen Electro-Motive built SD70ACe/LC units 4313 serial 20038540-014 leads CM40-8M 5653 with a loaded 330 waggon train from Yandi 2 mine. Other locos in the consist are two set of mid train units consisting of CM40-8M-SD40R-SD40R and CM40-8-SD40R-SD40R. 21st June 2008.
|
|

197-131123 viewsWittenoom, Colonial Mine, asbestos mining remains, Mancha battery locomotive #4 looking north west, demolished workshops and office on the left, mine adit doors visible, compressor building in the distance.
|
|

050625 37681122 viewsBroome Rd grade crossing at the 57.1 km on the GML sees BHP Goninan GE rebuilt model CM40-8M unit 5648 'Kwangyang Bay' serial 8412-06 / 93-139 long end leading the Sundowner on its way back to Hedland across the highway 25th June 2005.
|
|

195-021114 viewsMunjina, end of Roy Hill Road where it meets the Great Northern Highway, Toyota HJ75 Landcruiser, loaded up to the max, it has a 13 leaf spring pack on the rear, 9 on the front, PTO winch, in route to Wittenoom.
|
|

160522 20921109 viewsParkeston, 6MP4 intermodal train, platform 1 of 5-pack RRRY 7007 well waggon set, one of nineteen built in China at Zhuzhou Rolling Stock Works for Goninan in 2005, ARLS 505 reefer and Toll half height curtainsider 5TC 227
|
|

040817 010702r1103 viewsNelson Point, Wheel Lathe, BHP GE AC6000 unit 6073 'Fortescue' serial 51065 wait collection following a wheel turn. 17th August 2004.
|
|

040809 160142r1103 viewsNelson Point BHP Billiton EMD SD40R units 3094-3097-3096-3095 under load testing between CM40-8M units 5641 and 5636 return from Bing Siding prior to them entering service 9th August 2004.
|
|

050624 31971102 viewsPort Hedland, the 19.3 km on the GML sees BHP Billiton Goninan GE rebuilt model CM40-8M unit 5636 'Munda' serial 8151-11 / 91-122 leads the Sundowner across the Broome Rd crossing on its way to Goldsworthy 24th June 2005.
|
|

2063 Goninan 040815 1655081100 viewsNelson Point Car Dumper 3, builders plate of Goninan built replacement ore waggon 2063, one of a batch of 345 waggons built to the new Lynx Engineering design known as the Golynx waggons serial 950088-190 and build date 04/2001. 15th August 2004.
|
|

040807 024920r1099 viewsNelson Point, BHP GE AC6000 6077 'Nimingarra' serial 51069 idles away 0250 hrs on the loco spur near the South Yard Loco Prep facility 7th August 2004.
|
|

030415 0659111093 viewsKevin, originally one of sixty two Kinki Sharyo built NH type for the NAR in 1966, sent to Eyre Peninsula in 1985 and recoded to ENH type, ENH 11 with hungry boards fitted and loaded with gypsum on train 3DD2 at the Kevin loading point.
|
|

040817 011436r1091 viewsNelson Point, Wheel Lathe, BHP GE AC6000 unit 6073 'Fortescue' serial 51065 wait collection following a wheel turn. 17th August 2004.
|
|

238-051090 viewsPort Hedland Harbour, heavy lift ship Happy Buccaneer (IMO: 8300389) sits at Finucane Island D Berth delivering a new shiploader for BHP Billiton. 1st November 2003. Geodata . Back in time here the ship cranes were only 550 tonne each, these are now 700.
|
|

170727 95671090 viewsOn Abydos Station, cattle not rail, empty FMG fuel train passes a derailment clean-up site at the 81 km behind NS Juniata Shops rebuilt EMD SD90MAC-H model 901 serial 976833-01 which had the 265-H engine replaced in 2013 with a 710, it leads SD70ACe/LCi unit 715 and twenty four empty fuel tank waggons. GeoData.
|
|

100508 8340r1089 viewsNelson Point Loco Overhaul Workshop sees BHP Billiton Electro-Motive EMD SD70ACe/LC unit 4335 serial 20078915-002 from the fourth order for thirteen locomotives undergoing attention with blue board protection. 8th May 2010.
|
|

222-371087 viewsLoaded Hamersley Iron Comeng NSW built ore waggon 562, one of a batch of 150 built in 1968.
|
|

110-111086 viewsBenalla yard overview, broad gauge V/Line S class S 302 'Edward Henty' Clyde Engineering EMD model A7 serial 57-166, B class B 64 Clyde Engineering EMD model ML2 serial ML2-5 and V/Line T class loco T 403 with serial 67-498 a Clyde Engineering Granville NSW built EMD model G18B with stabled down Wodonga goods train 9303, point indicators.
|
|

091002 2602r1084 viewsPort Hedland, at the 11.8 km on the big curve trailing BHP Billiton locomotive 4311 Poonda from the original order for thirteen SD70ACe/LC model EMD units from Electro-Motive and built in London, Ontario in August 2005 with serial 20038540-012 assists in powering an empty 330 waggon train south to the mines, these units were delivered with the round middle rail on the handrail and a standard cab which resulted in all subsequent orders having the isolated or Whisper cab fitted. 4311 and its twelve stablemates were traded back to Progress Rail and sent to the USA in January 2015. 2nd October 2009.
|
|

050109 0930411081 viewsPilbara Railways Historical Society, the cab from scrapped Australian built ALCo MLW M636 model by Comeng NSW in November 1974 for Mt Newman Mining and BHP Iron Ore numbered 5495 serial number C6084-11. 9th October 2005.
|
|

040817 011002r1081 viewsNelson Point, Wheel Lathe, BHP GE AC6000 unit 6073 'Fortescue' serial 51065 wait collection following a wheel turn. 17th August 2004.
|
|
| 19467 files on 974 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
22 |  |
 |
 |
 |
 |
 |
 |
|