Most viewed |

160524 3711247 viewsKalgoorlie, SCT train 2PM9 operating from Perth to Melbourne, PBGY type covered van PBGY 0093 Multi-Freighter, one of eighty units built by Gemco WA.
|
|

160525 4550247 viewsParkeston, SCT train 3PG1 which operates from Perth to Parkes NSW (Goobang Junction) arrives round the curve behind SCT class SCT 005 serial 07-1729 is an EDI Downer built EMD model GT46C-ACe and sister loco SCT 011 with 73 waggons for 3381 tonnes and 1726 metres.
|
|

160530 9171247 viewsParkeston, SCT train 7GP1 which operates from Parkes NSW (Goobang Junction) to Perth, PBHY type covered van PBHY 0087 Greater Freighter, built by CSR Meishan Rolling Stock Co China in 2014 without the Greater Freighter signage.
|
|

161111 2453247 viewsBinduli, Kalgoorlie Freighter train 5025, Clyde Engineering EMD model GT64C Q class unit Q 4005 serial 97-1458 renumbered from Q 305.
|
|

161111 2461247 viewsBinduli, Kalgoorlie Freighter train 5025, waggon APNY 31166, last of four built by Westrail Midland Workshops in 1978 as WNA type pneumatic discharge nickel concentrate waggon, WAGR built and owned copies of the AE Goodwin built WN waggons for WMC.
|
|

161111 2405247 viewsKalgoorlie, Malcolm freighter train 5029, waggon AQNY 32180 one of sixty two waggons built by Goninan WA in 1998 as WQN type for Murrin Murrin container traffic with an undecorated Bis Industries hard-top 25U0 type sulphur container BISU 100048 and original style sulphur container S107U 949 with original style door and sliding tarpaulin.
|
|

161112 2982247 viewsWest Kalgoorlie, loaded Malcolm sulphur train 6029, CQZY type waggon CQZY 1699, built by CIMC at Dalian China for CFCLA and one of fifteen on lease to Aurizon with two non decaled Bis Industries hard-top 25U0 type sulphur containers BISU 100064 and 100075.
|
|

040616 162244247 viewsNelson Point, the Sundowner coach, originally built by E. G. Budd in 1939 numbered 301 as the Silver Star as a diner-parlour-observation coach on the Chicago, Burlington and Quincy Railroad's General Pershing Zephyr train from the 1930s and 1940s. Donated to Mt Newman Mining Co. by AMAX an original joint venture partner to commemorate the projects first 100 million tonnes of iron ore railed between Mount Whaleback mine and the Port Hedland port.
|
|

WTT West 1981-10-04247 viewsWorking Time-Table Western and South Western Districts, 4th October 1981, complete 177 page PDF download, 7.4 MB.
|
|

030404 141132247 viewsPort Augusta Spencer Junction yard, MKA (Morrison Knudsen Australia) rebuilt AL class AL 24 into EMD JT26C-2M model for Australian National in 1993 as the ALF class, here ALF 20 serial 94-AB-020 shunts empty rail transport waggon sets from the Darwin construction. 4th April, 2003.
|
|

170730 0476247 viewsBoodarie, a loaded Roy Hill train crossing the Great Northern Highway grade crossing with mid-train General Electric built ES44ACi unit RHA 1011 serial 62583. 30th July 2017. GeoData.
|
|

24135247 viewsBassendean, Collier Road, Key Transport hauling the final BHP Iron Ore Goninan GE rebuilt CM40-8M unit 5669 serial 8412-02 / 95-160, which is actually an CM40-8MEFI as the final three had electronic fuel injection fitted to their 7FDL-16 engines. 5669 was rebuilt from Comeng NSW built ALCo M636 model 5486 serial C6084-2. July 1995.
Jim Bisdee photo.
|
|

190107 0423247 viewsParkeston, UGL plate on Mineral Resources MRL class locomotive bogie.
|
|

080621 2797247 viewsWalla back track, BHP track machine TM04 a Plasser Australia unit model 09-3X serial M489. 21st June 2008.
|
|

150619 9100247 viewsFlash Butt yard, Speno owned and operated rail grinder RG2 for BHP, overview of entire unit, from the left is the driving and grinding module, then two grinding modules and the power and driving unit.
|
|

200914 iPhone IMG 8830247 viewsPilbara Railways Historical Society, in this panorama image you can see from the left, the PWD crane, waggons and Simplex loco from Point Samson, a couple of ALCo engines, the Locotrol 'cab'; off of BHP 5663, the ALCo S2 Hamersley Iron 007 'Mabel', ALCo C415 demonstrator Hamersley Iron 1000, former NSWGR ALCo RSC-3 Robe River Iron Associates 9405 renumbered to 4002, English Electric ST95B Goldsworthy Mining 1, ALCo M636 BHP 5502 and EMD F7A Mt Newman Mining 5450. 14th September 2020.
|
|

200914 iPhone IMG 8838247 viewsPilbara Railways Historical Society, gauge panel located above the centre entry door to the cab of 3017. 14th September 2020.
|
|

246-23247 viewsCape Lambert, Robe River locomotive 9420 which is a Goninan WA ALCo to GE rebuild CM40-8M with serial 8109-03 / 91-119 from March 1991 riding on Hi-Ad bogies and was originally an ALCo Schenectady built C630 serial 3486-4 and built new for Chesapeake & Ohio (USA) as their 2103. It is one of four C630 ALCo units purchased in 1974 and delivered to Robe in January 1975. Everything below the frame is ALCo while above is GE and Pilbara Cab. 22nd May 2002.
|
|

WTT Combined Regions General-Instructions 1986-11-11 247 viewsGeneral Instructions for the Combined Regions working timetable 11th November 1986.
Complete 154 pages, 15.5 MB download.
|
|

120-36246 viewsWodonga loco depot turntable, pit, radial roads, V/Line broad gauge locos T class T 402 Clyde Engineering EMD model G18B serial 67-497, X class X 36 Clyde Engineering EMD model G16C serial 66-489, X class X 54 Clyde Engineering EMD model G26C serial 75-801, the differences between to the X class units are evident.
|
|
16911 files on 846 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
251 |  |
 |
 |
 |
 |
 |
 |
|