Most viewed |

160524 3674442 viewsKalgoorlie, SCT train 2PM9 operating from Perth to Melbourne, PBGY type covered van PBGY 0006 Multi-Freighter, one of eighty two waggons built by Queensland Rail Redbank Workshops in 2005.
|
|

160524 3685442 viewsKalgoorlie, SCT train 2PM9 operating from Perth to Melbourne, PBGY type covered van PBGY 0130 Multi-Freighter, one of eighty units built by Gemco WA.
|
|

160525 4590442 viewsParkeston, SCT train 3PG1 which operates from Perth to Parkes NSW (Goobang Junction), PWXY type PWXY 0006 one of twelve well waggons built by CSR Meishan Rolling Stock Co of China for SCT in 2008, loaded with an SCT 48' reefer SCTR 311 and an SCT 40' reefer SCTR 130.
|
|

160527 5527442 viewsBlamey crossing loop at the 1692 km, SCT train 5PM9 operating from Perth to Melbourne, PBHY type covered van PBHY 0098 Greater Freighter, built by CSR Meishan Rolling Stock Co China in 2014 without the Greater Freighter signage.
|
|

160530 9167442 viewsParkeston, SCT train 7GP1 which operates from Parkes NSW (Goobang Junction) to Perth departs the mainline behind SCT class SCT 013 serial 08-1737 an EDI Downer built EMD model GT46C-ACe.
|
|

160530 9175442 viewsParkeston, SCT train 7GP1 which operates from Parkes NSW (Goobang Junction) to Perth, PBHY type covered van PBHY 0012 Greater Freighter, one of thirty five units built by Gemco WA in 2005 without the Greater Freighter signage.
|
|

161109 1899442 viewsMoule, former BHP RSK type iron ore waggon, modified by G&W Port Lincoln to cart gypsum and coded RSG type, RSG 4, fitted with hungry boards and loaded with gypsum.
|
|

161111 2459442 viewsBinduli, Kalgoorlie Freighter train 5025, waggon APNY 31164, one of four built by Westrail Midland Workshops in 1978 as WNA type pneumatic discharge nickel concentrate waggon, WAGR built and owned copies of the AE Goodwin built WN waggons for WMC.
|
|

161111 2463442 viewsBinduli, Kalgoorlie Freighter train 5025, waggon APNY 31155, one of twelve built by WAGR Midland Workshops in 1974 as WNA class pneumatic discharge nickel concentrate waggon, WAGR built and owned copies of the AE Goodwin built WN waggons for WMC.
|
|

161111 2406442 viewsKalgoorlie, Malcolm freighter train 5029, waggon AQNY 32196 one of sixty two waggons built by Goninan WA in 1998 as WQN type for Murrin Murrin container traffic with two original style sulphur containers both with original style doors and sliding tarpaulin tops. The numbers are graffitied out, G 969 and G 857.
|
|

040616 162128442 viewsNelson Point, the Sundowner coach, originally built by E. G. Budd in 1939 numbered 301 as the Silver Star as a diner-parlour-observation coach on the Chicago, Burlington and Quincy Railroad's General Pershing Zephyr train from the 1930s and 1940s. Donated to Mt Newman Mining Co. by AMAX an original joint venture partner to commemorate the projects first 100 million tonnes of iron ore railed between Mount Whaleback mine and the Port Hedland port.
|
|

050801 4741442 viewsFlash Butt yard, Barclay Mowlem track tamper a Fairmont Jackson model 6700 tamper. 1st August 2005.
|
|

030404 131500442 viewsPort Augusta, Spencer Junction shunt loco 830 class unit 863 serial 84709 is an AE Goodwin built ALCo DL531 model and entered service in June 1963. 4th April 2003.
|
|

030404 141457442 viewsPort Augusta Spencer Junction yard, MKA (Morrison Knudsen Australia) rebuilt AL class AL 24 into EMD JT26C-2M model for Australian National in 1993 as the ALF class, here ALF 20 serial 94-AB-020 shunts empty rail transport waggon sets from the Darwin construction. 4th April, 2003.
|
|

170730 0511442 viewsIndee, a loaded Roy Hill train runs along at the 71 km heading to the port behind General Electric built ES44ACi units RHA 1010 serial 62582 and RHA 1004 with 224 waggons and a mid-train remote in the middle. 30th July 2017. GeoData.
|
|

030416 110228442 viewsManguri Siding station nameboard, located 706.5 km from the 0 datum at Coonamia and 200 km north of Tarcoola between Wirrida and Cadney Park on the Tarcoola - Alice Springs line. 16th April 2003.
|
|

170915 0710442 viewsGreat Northern Highway 18.2 km grade crossing, empty Roy Hill fuel train powers along bound for Tad Yard with General Electric built ES44ACi unit RHA 1019 serial 64300 leading eleven of Roy Hill's twelve tank waggons. 15th September 2017. View map here.
|
|

190109 1580442 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00041 built by CSR Yangtze Co China serial 2014/382-41 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|

080116 1371442 viewsChapman Siding 69 km, FMG slave waggon 1395 tare 22.6 tonnes with rotary coupler built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China during 2007, stands on the passing track. 16th January 2008.
|
|

200914 iPhone IMG 8831442 viewsPilbara Railways Historical Society, in this panorama image you can see from the left 3017 a Comeng WA ALCo rebuild C636R locomotive serial WA-135-C-6043-04. The improved Pilbara cab was fitted as part of the rebuild in April 1985 and the former NSWGR bogie passenger carriages. 14th September 2020.
|
|
| 19088 files on 955 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
260 |  |
 |
 |
 |
 |
 |
 |
|