Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Most viewed
239-15.jpg
239-15106 viewsLooking down from the middling crushers to the original 'old side' bank of five tertiary crushers. Sub-Station 2 can be seen at right with the control room above that. GeoData.
160526_5253.jpg
160526 5253106 viewsParkeston, 3MP7 priority service train runs upgrade around the curve bound for Kalgoorlie and Perth behind Goninan built GE model Cv40-9i NR class units NR 82 serial 7250-03/97-284 and NR 49 serial 7250-08/97-251.
160523_2941.jpg
160523 2941106 viewsParkeston, 7SP3 intermodal train, RRGY 7128 platform 1 of 5-pack articulated skel waggon, one of fifty originally built by AN Rail Islington Workshops in 1996-97 as type RRBY, later rebuilt with 48' intermediate decks and coded RRGY, 40' deck with two 20' containers ADLU 203738 and NWSU 9204.
160522_2105.jpg
160522 2105106 viewsParkeston, 6MP4 intermodal train, platform 4 of 5-pack RRRY 7014 well waggon set, one of nineteen built in China at Zhuzhou Rolling Stock Works for Goninan in 2005, Linfox reefer FTAD 9106014 and half height side door red Linfox LSDU 6940058 container.
160522_2125.jpg
160522 2125106 viewsParkeston, 6MP4 intermodal train departs for Kalgoorlie and Perth, view of crew accommodation coach RZAY 283, built by Comeng NSW in 1972 as type ARJ stainless steel, air conditioned, first class roomette sleeping coach.
160522_2126.jpg
160522 2126106 viewsParkeston, 6MP4 intermodal train, RQJW type container waggon RQJW 21964 built by Mittagong Engineering NSW as part of a batch of twenty five NQJW type waggons in 1981, loaded with half height side door SCF container SCFU 607093 and a flatrack with a Regal Transport truck.
160522_2180.jpg
160522 2180106 viewsParkeston, 6MP4 intermodal train, RRAY 7232 platform 5 of 5-pack articulated skel waggon set, 1 of 100 built by ABB Engineering NSW 1996-2000, 40' flatrack with chlorine gas cylinders.
160522_2336.jpg
160522 2336106 viewsParkeston, 7MP7 priority service train running up the hill to Kalgoorlie with a pair of Goninan built GE model Cv40-9i NR class units NR 105 serial 7250-08/97-310 and NR 113 serial 7250-09/97-312 and crew accommodation coach BRS 222 all in Pacific National livery.
160522_2344.jpg
160522 2344106 viewsParkeston, 7MP7 priority service train, platform 2 of 5-pack articulated skel waggon set, Qiqihar Rollingstock Works China built RRQY 5816, 40' flatrack with tarped load.
160522_2355.jpg
160522 2355106 viewsParkeston, 7MP7 priority service train, RRAY 7243 platform 2 of 5-pack articulated skel waggon set, 1 of 100 built by ABB Engineering NSW 1996-2000, 46' reefer BTRN 466007.
161109_1895.jpg
161109 1895106 viewsMoule, train 4DD4 rumbles along the mainline with second unit Genesee & Wyoming locomotive Clyde Engineering EMD model JL22C unit 1603 serial 70-730, originally built as the NJ class NJ 3.
161111_2456.jpg
161111 2456106 viewsBinduli, Kalgoorlie Freighter train 5025, AQWY 30348 container waggon, originally built by Tomlinson Steel WA as WFX type in 1970 from a batch of one hundred and sixty one waggons, to narrow gauge as QWF type in 1970, back to SG in 1972 as WFX, recoded in 1979 to WQCX type. Loaded with two Cockburn Cement Convair type 20' tanktainers 1109 and 1108.
161116_5099.jpg
161116 5099106 viewsWest Kalgoorlie, loaded Shell fuel train 3442 arrives behind UGL Rail built GE model C44ACi unit ACC 6031 serial R-0093-01 / 13-485 following its overnight run from Esperance with 26 waggons for 505 metres and 2165 tonnes.
060414_3448.jpg
060414 3448106 viewsNelson Point yard, originally a Magor USA built ballast waggon for the Oroville Dam construction, 507 seen here modified as a weighbridge test waggon, end view.
040408_162730.jpg
040408 162730106 viewsMooka Siding north backtrack, view of the driving cab end of BHP's mainline Tamper 1, Plasser Australia 09-32 CAT model with serial 306. 8th April 2004.
23721.jpg
23721106 viewsBassendean, Goninan workshops, Mt Newman Mining AE Goodwin built ALCo M636 unit, 5481 serial G6061-2 awaiting rebuilding into CM40-8M 5650 in July 1993. December 1992.
Jim Bisdee photo.
24902.jpg
24902106 viewsBassendean, Goninan workshops, Mt Newman Mining's Comeng NSW built ALCo M636 5504 serial C6104-2 sits out the back in a partially stripped state with fellow unit 5503. Both of these units was subsequently scrapped. July 1995.
Jim Bisdee photo.
030415_154528.jpg
030415 154528106 viewsTarcoola, at the 504.5 km, looking west along loop line, the eastern leg of the triangle running to the left, middle road is the Trans Australian Railway line while the right is the Central Australian Railway line. Tarcoola is the junction for the TAR and CAR railways situated 504 km from the 0 km datum at Coonamia. GeoData location. 15th April 2003.
030415_171948.jpg
030415 171948106 viewsTarcoola, at the 504.5 km, looking east along the Central Australian Line, Trans Australian is the middle road with the loop on the far right. Tarcoola is the junction for the TAR and CAR railways. GeoData location. 15th April 2003.
170915_0724.jpg
170915 0724106 viewsGreat Northern Highway 18.2 km grade crossing, empty Roy Hill fuel train powers away north from the highway towards Tad Yard with General Electric built ES44ACi unit RHA 1019 leading eleven of Roy Hill's twelve tank waggons. 15th September 2017. View map here.
16257 files on 813 page(s) 302

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2024 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional