Most viewed |

160522 2226473 viewsParkeston, SCT train 6MP9 operating from Melbourne to Perth, PBHY type covered van PBHY 0096 Greater Freighter, built by CSR Meishan Rolling Stock Co China in 2014.
|
|

160522 2268473 viewsParkeston, SCT train 6MP9 operating from Melbourne to Perth, PQIY type 80' container flat PQIY 0014, one of forty units built by Gemco WA loaded with two 20' 2EG1 type Cronos boxes CXSU 118468 and 115879 and a 40' 4EG1 type Cronos box CSXU 120522.
|
|

160523 2883473 viewsParkeston, SCT train 7GP1 which operates from Parkes NSW (Goobang Junction) to Perth, PBHY type covered van PBHY 0082 Greater Freighter, built by CSR Meishan Rolling Stock Co China in 2014 without the Greater Freighter signage.
|
|

160525 4581473 viewsParkeston, SCT train 3PG1 which operates from Perth to Parkes NSW (Goobang Junction), PWWY type PWWY 0015 one of forty well waggons built by Bradken NSW for SCT, loaded with a 48' MEG1 type plain box SCFU 480475 and a 46' 6" MFRG type former Wilmot Freeze Haul reefer, now SCFU 814055.
|
|

160526 5329473 viewsWest Kalgoorlie, SCT train 3MP9 operating from Melbourne to Perth, originally built by Victorian Railways Newport Workshops in 1975 as one of twenty five FCF type 'Jumbo' Container Flat waggons built, PQDY 20 still in Freight Australia green livery loaded with a half height 40' former Macfield flatrack MGCU with an SCF tarp and an SCT 40' half height curtainsider.
|
|

160527 5548473 viewsBlamey crossing loop at the 1692 km, SCT train 5PM9 operating from Perth to Melbourne, Gemco WA built forty of these PQIY type 80' container flat waggons in 2009, PQIY 0007 loaded with two SCT 40' reefer units SCTR 010 and SCTR 015.
|
|

160530 9117473 viewsParkeston, SCT train 1PM9 operates mostly empty from Perth to Melbourne, Gemco WA built PQIY type 80' container flat PQIY 0030 loaded with 40' SCT box SCT 40214, 40' SCT curtainsider SCT 1029 and an empty unidentified white 40' flatrack.
|
|

160530 9135473 viewsParkeston, SCT train 1PM9 operates mostly empty from Perth to Melbourne, PBGY type covered van PBGY 0011 Multi-Freighter, one of eighty two waggons built by Queensland Rail Redbank Workshops in 2005.
|
|

160530 9144473 viewsParkeston, SCT train 1PM9 operates mostly empty from Perth to Melbourne, ARFY type ARFY 2248 refrigerated van with a Ballarat built Maxi-CUBE body mounted on an original Commonwealth Railways ROX container waggon built by Comeng Victoria in 1971, recoded to ROX, RQX, AFQX, AQOY and RQOY before having the Maxi-CUBE refrigerated body added circa 1998 for SCT service.
|
|

160530 9215473 viewsParkeston, SCT train 7GP1 which operates from Parkes NSW (Goobang Junction) to Perth, PWXY type PWXY 0004 one of twelve well waggons built by CSR Meishan Rolling Stock Co of China for SCT in 2008, loaded with a 48' SCT reefer SCTR 326 and a 46' 6" MFRG type former Wilmot Freeze Haul reefer now with SCF SCFU 814028.
|
|

161111 2452473 viewsBinduli, Kalgoorlie Freighter train 5025, Clyde Engineering EMD model GT64C Q class unit Q 4013 serial 97-1466 renumbered from Q 313.
|
|

161111 2487473 viewsBinduli, Kalgoorlie Freighter train 5025, container flat waggon AQWY 30212 container waggon, originally one of forty five built by WAGR Midland Workshops in 1974 as WFX type, to WQCX in 1981, then AQCY, seen here loaded with two 20' 25B0 type Colemans ammonium nitrate boxes CCBU 020013[0] and CCBU 004400[0] and a 20' half height Nickel West box NIWU 100055[3] that normally contains quartz for the smelter.
|
|

0202 USA 040419 102145473 viewsAbydos back track, riveted flat waggon 202 with three water tanks fitted, view of non-handbrake end, originally part of the 'camp train', modified by Mt Newman Mining railway workshops.
|
|

050414 0936473 viewsFlash Butt yard, Barclay Mowlem track tamper a Fairmont Jackson model 6700 tamper serial 153172. 14th April 2005.
|
|

170728 09782473 viewsGreen Pool on the Robe line at the 60.75 km original order and now aging General Electric built Dash 9-44CW model locomotive 7091 serial 47770 is operating in AutoHaul™ mode with a pair of GE ES44DCi units 8155 and 8165 both in the Rio Tinto stripe livery as they pass a tamper and regulator doing track work. 28th July 2017. GeoData.
|
|

3585 001473 viewsBassendean, Wood St, delivery of the final BHP CM40-8MEFI unit 5669 'Beilun' serial 8412-02 / 95-160. Unit was rebuilt as one of three with an electronic fuel injected prime mover by Goninan from Comeng built ALCo M636 unit 5486 serial C6084-2. Date July 1995.
Jim Bisdee photo.
|
|

20860473 viewsBassendean, Goninan workshops, sitting outside the locked gates having just been bought down from Port Hedland, Mt Newman Mining's AE Goodwin ALCo C636 unit 5454 serial G6012-3 on a ninety six wheel road float. 5454 will be rebuilt into CM40-8M unit 5641 by June 1992. Image taken January 1992.
Jim Bisdee photo.
|
|

180615 1518473 viewsWalla Siding, another named Progress Rail built EMD SD70ACe model 4478 'Ivan Butson' serial 20148001-011 leads sister 4467 with a loaded train. 15th June 2018.
|
|

180615 1520473 viewsWalla Siding, another named Progress Rail built EMD SD70ACe model 4478 'Ivan Butson' serial 20148001-011. 15th June 2018.
Toad Montgomery photo.
|
|

150619 9145473 viewsMooka, BHP Iron Ore's track recording vehicle, EM80 which is a Plasser & Theurer EM-80 model and still wearing the old BHP blue and white livery, this unit was delivered in Mt Newman Mining orange and white, Mermec fitted a Tecnogamma system as part of a refurbishment.
|
|
| 19216 files on 961 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
303 |  |
 |
 |
 |
 |
 |
 |
|