Most viewed |

160529 8769227 viewsParkeston, 6MP4 intermodal train, RRZY 7049 platform 3 of 5-pack well waggon set, one of thirty two sets built by Goninan NSW in 1995-96 for National Rail as RQZY type, recoded to RRZY when repaired with an SCF 40' half height side door container SCFU 607095 and a Linfox 53' PFG1 type box DRC 54##.
|
|

160530 9255227 viewsBinduli, 7SP3 intermodal service, container waggon RQAY 21910, one of a hundred such waggons built in 1981 by EPT NSW as type NQAY, recoded to RQAY in 1994. 20' Royal Wolf RWPU 200499 container and 40' SCF Austrans AUSU 470475 container.
|
|

160531 9879227 viewsWest Kalgoorlie, RRKY type container waggon RRKY 2723, originally built by Perry Engineering SA as part of a batch of forty five RM type container waggons in 1974, before going through several code changes and then fitted with aligned bogies as AQPY. Loaded with three 22G1 type 20' Royal Wolf boxes, RWMC 817983, RWMC 818013 and RWMC 815879. 31st of May 2016.
|
|

160522 2254227 viewsParkeston, SCT train 6MP9 operating from Melbourne to Perth, ABSY type ABSY 2479 covered van, originally built by Mechanical Handling Ltd SA in 1972 for Commonwealth Railways as VFX type recoded to ABFX and then RBFX before being converted by Gemco WA to ABSY type in 2004/05.
|
|

160524 3652227 viewsKalgoorlie, SCT train 2PM9 operating from Perth to Melbourne, PBHY type covered van PBHY 0067 Greater Freighter, built by CSR Meishan Rolling Stock Co China in 2014.
|
|

161109 1892227 viewsMoule, train 4DD4 rumbles along the mainline behind Genesee & Wyoming locomotives Clyde Engineering EMD model JL22C units 1601 serial 71-728 and 1603 serial 71-730 and a pair of AE Goodwin ALCo model DE531 units 859 serial 84705 and 850 serial 84136 with 62 loaded waggons.
|
|

161109 1898227 viewsMoule, former BHP RSK type iron ore waggon, modified by G&W Port Lincoln to cart gypsum and coded RSG type, RSG 6, fitted with hungry boards and loaded with gypsum.
|
|

161111 2516227 viewsBinduli, Kalgoorlie Freighter train 5025, waggon AZDY 30728, one of about fourteen WBAX vans converted to AZDY type sodium cyanide container waggon, originally built by WAGR Midland Workshops as one of seventy five WV/X type covered vans in 1967-68, converted late 1988/9 to WQDF.
|
|

040419 102145227 viewsAbydos back track, riveted flat waggon 202 with three water tanks fitted, view of non-handbrake end, originally part of the 'camp train', modified by Mt Newman Mining railway workshops.
|
|

060414 3447227 viewsNelson Point yard, originally a Magor USA built ballast waggon for the Oroville Dam construction, 507 seen here modified as a weighbridge test waggon with an axle load of 20 ton.
|
|

030403 162110227 viewsCrystal Brook, cab side shot of CLF class leader CLF 1 'City of Whyalla' serial 93-AN-1, rebuilt by MKA to EMD model AT26C-2M from CL class unit CL 2 in 1993. 3rd April 2003.
|
|

070908 0595227 viewsRobe River compressor waggon set IC 22 with air receiver and IC 23 with two Ingersoll Rand air compressors. These waggons are ballasted to 100 tonnes each and are modified ore waggons. Cape Lambert 8th August 2007.
|
|

22654227 viewsBassendean, Goninan workshops, brand new GE CM40-8M rebuild unit for BHP Iron Ore 5634 'Boodarie' serial 8151-07 / 91-120 looks to be in the final stages of construction as it sits out side during an Open Day on 20th July 1991 with WAGR Fs 460 4-8-0 steam locomotive and Xa Class No 1405 'Warienga'. 20th July 1991.
Jim Bisdee photo.
|
|

22668227 viewsBassendean, during an Open Day at the Goninan workshops, a stripped back ALCo locomotive frame under re-construction which will become a GE CM40-8M in the background and some ALCo Hi-Ad trucks being overhauled. 20th July 1991.
Jim Bisdee photo.
|
|

23721227 viewsBassendean, Goninan workshops, Mt Newman Mining AE Goodwin built ALCo M636 unit, 5481 serial G6061-2 awaiting rebuilding into CM40-8M 5650 in July 1993. December 1992.
Jim Bisdee photo.
|
|

030415 160210227 viewsTarcoola, station nameboard new style, the junction for the TAR and CAR railways situated 504.5 km from the 0 km datum at Coonamia. GeoData location. 15th April 2003.
|
|

240-16227 viewsWickham, left hand side number one end view of former Robe River and NSWGR MLW built ALCo RSC3 serial 77737 of October 1951, was originally 40 class 4006. Shows modified bogie to convert the A1A to a BO bogie type. 31st August 2002.
|
|

080621 2808227 viewsWalla back track, BHP track machine BR 34 a Plasser Australia unit model 305 serial M490. 21st June 2008.
|
|

150619 9095227 viewsFlash Butt yard, Speno owned and operated rail grinder RG2 for BHP, rail grinding module, shows coupling and connections to driving module, 2500 litre water tank, electrical cabinet, blower fans and filter housing, grinding hood between bogies.
|
|

200914 7783227 viewsPilbara Railways Historical Society museum, former Cliffs Robe River Iron Associates RSC-3 model ALCo locomotive built by Montreal Locomotive Works (MLW) in 1951 for NSWGR as the 40 class 4002 serial 77733, purchased by CRRIA in 1971 and numbered 261.002, then 1705 and finally 9405. 4002 is preserved in an operational state and another claim to fame is it run the Royal Train in NSW February 1954. Donated to the Society in 1979. 14th September 2020.
|
|
16911 files on 846 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
316 |  |
 |
 |
 |
 |
 |
 |
|