Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images. **Note - Due to recent changes to make the gallery mobile friendly, please click the image for full size picture.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Most viewed
211-24.jpg
211-24571 viewsWeipa, Lorim Point railway workshops, front view of Comalco R 1001 loco Clyde Engineering EMD model GT26C serial 72-752 while is sits at the fuel point, items of note are the second 'tropical roof' and the five chime horn cut into the nose. Also as the Weipa locomotives don't work in MU there is only the train brake hose and the main res hose for charging the belly dump discharge doors.
030406_115702.jpg
030406 115702571 viewsPort Lincoln, derailment damaged HCN type bogie wheat waggon HCN 18, modified at Islington Workshops in 1978-80 which started life as a Tulloch built NHB type iron ore hopper for the CR on the North Australia Railway in 1968-69. It was scrapped in May 2003, not long after this image was taken. April 6, 2003.
130703_0306.jpg
130703 0306571 viewsKaldow, HAN type bogie grain hopper waggon HAN 61, one of sixty eight units built by South Australian Railways Islington Workshops between 1969 and 1973 as the HAN type for the Eyre Peninsula system.
060531_4983.jpg
060531 4983571 viewsWest Kalgoorlie, AQNY 32183 one of sixty two waggons built by Goninan WA in 1998 as WQN type for Murrin Murrin container traffic, with a pair of loaded sulphur skips with original door and sliding tarpaulins.
224-07.jpg
224-07571 viewsBing siding, 6076 'Mt Goldsworthy' serial 51068 a General Electric AC6000 built by GE at Erie awaits the road to depart south. GeoData.
224-16.jpg
224-16571 viewsBing siding, 6076 'Mt Goldsworthy' serial 51068 a General Electric AC6000 built by GE at Erie awaits the road to depart south. GeoData.
160102_DJI_0022.jpg
160102 DJI 0022571 viewsWittenoom Gorge, western wall of gorge view, looking west, Third Crossing. Geodata.
150508_8111.jpg
150508 8111571 viewsFMG Solomon Line, empty train lead by triple combination of General Electric Dash 9-44CW 004 serial 58181, EMD SD90MAC-H 916 serial 976833-22 and EMD SD70ACe 710 serial 20118693-002 power through the hills around the Bea Bea Creek area. Geodata: -22.0528200 118.7132450 .
060110_2152.jpg
060110 2152571 viewsPillana, former station site, 59 km, empty grain train behind ARG 1200 class unit 1204, a Clyde Engineering EMD model G12C serial 65-428, originally built for the WAGR as the final unit of fourteen A class locomotives in 1965 then sent to the Eyre Peninsula in July 2004, and two 830 class AE Goodwin built ALCo model DL531 units 842 serial 84140 ex SAR broad gauge to Eyre Peninsula in October 1987, and 851 serial 84137 new to Eyre Peninsula in 1962. Approx. location of photo.
160524_4323.jpg
160524 4323571 viewsWest Kalgoorlie, 1MP2 steel train, RQJW 21951, first of the fourth batch of twenty five built by Mittagong Engineering NSW in 1980/81 as the JCW type 80' container waggon, recoded to NQJW. Loaded with two Royal Wolf 40' boxes, 42G1 type RWTU 431644 and 4EG1 type RWTU 941222.
160609_0418.jpg
160609 0418571 viewsWoodbridge, 5PM5 intermodal train, platform 4 of 5-pack RRRY 7008 well waggon set, one of nineteen built in China at Zhuzhou Rolling Stock Works for Goninan in 2005, Linfox 48' box DRC 468 and Rand Refrigerated Logistics 46'6" MPR1 type reefer RAND 155 on top.
160524_3676.jpg
160524 3676571 viewsKalgoorlie, SCT train 2PM9 operating from Perth to Melbourne, PQIY type 80' container flat PQIY 0019, one of forty units built by Gemco WA loaded with a SCT 40' GPR1 type reefer CR 020 and a 40' 4EG1 type Cronos box CRTU 091773.
160526_5323.jpg
160526 5323571 viewsWest Kalgoorlie, SCT train 3MP9 operating from Melbourne to Perth, PBHY type covered van PBHY 0049 Greater Freighter, one of a second batch of thirty units built by Gemco WA without the Greater Freighter signage.
160526_5338.jpg
160526 5338571 viewsWest Kalgoorlie, SCT train 3MP9 operating from Melbourne to Perth, PBGY type covered van PBGY 0153 Multi-Freighter, one of eighty units built by Gemco WA, with Independent Brake signage.
160526_5344.jpg
160526 5344571 viewsWest Kalgoorlie, SCT train 3MP9 operating from Melbourne to Perth, ABSY type ABSY 3121 covered van, originally built by Comeng WA in 1977 for Commonwealth Railways as VFX type, recoded to ABFX and RBFX to SCT as ABFY before conversion by Gemco WA to ABSY in 2004/05.
160530_9159.jpg
160530 9159571 viewsParkeston, SCT train 1PM9 operates mostly empty from Perth to Melbourne, ABSY type ABSY 2792 covered van, originally built by Carmor Engineering SA in 1976 as a VFX type covered van for Commonwealth Railways, recoded to ABFX and converted from ABFY by Gemco WA in 2004/05 to ABSY.
160530_9218.jpg
160530 9218571 viewsParkeston, SCT train 7GP1 which operates from Parkes NSW (Goobang Junction) to Perth, PWXY type PWXY 0006 one of twelve well waggons built by CSR Meishan Rolling Stock Co of China for SCT in 2008, loaded with a 46' 6" MFRG type former Wilmot Freeze Haul WB009 now in SCF service SCFU 814029 and a 48' SCT reefer SCTR 322.
161111_2405.jpg
161111 2405571 viewsKalgoorlie, Malcolm freighter train 5029, waggon AQNY 32180 one of sixty two waggons built by Goninan WA in 1998 as WQN type for Murrin Murrin container traffic with an undecorated Bis Industries hard-top 25U0 type sulphur container BISU 100048 and original style sulphur container S107U 949 with original style door and sliding tarpaulin.
170729_0119.jpg
170729 0119571 viewsGreen Pool, as they cross the #6 bridge on the original Robe River line with their train snaking all the way back to Western Creek, General Electric built ES44DCi unit 8114 serial 59106 in original silver livery and operating in AutoHaul™ with later sister units 8120 and 8148 with a loaded train from Yandicoogina. July 29, 2017. GeoData.
IC20_070908_0594.jpg
IC20 070908 0594571 viewsRobe River compressor waggon sets IC 20 with air receiver and IC 21 with two Ingersoll Rand air compressors and IC 22 with receiver and IC 23 with compressors. These waggons are ballasted to 100 tonnes each and are modified ore waggons and used on the pooled fleet rakes that come from HIY [Yandicoogina] and West Angelas mines. Cape Lambert yard, August 8 2007.
19447 files on 973 page(s) 335

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2026 www.pilbararailways.com.au Contact Us
Australian flag  Valid XHTML 1.0 Transitional