Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Most viewed
160529_8765.jpg
160529 8765135 viewsParkeston, 6MP4 intermodal train, RRKY 4335 container waggon, originally built in a batch of one hundred and fifty by Perry Engineering SA in 1975 as RMX type, recoded to AQMX, and RQKY, loaded with two Isuzu cab-chassis trucks.
160531_9910.jpg
160531 9910135 viewsWest Kalgoorlie, 1MP2 steel train, container waggon PRRY 5012 with two 20' steel coil 'butter boxes'.
160531_9955.jpg
160531 9955135 viewsWest Kalgoorlie, 3PM4 steel train, empty container waggon RQTY 620 originally built by Victorian Railways Newport Workshops between 1969-72 as part of a batch of two hundred FQX type container waggons, recoded to VQCX in c1979, Oct 1994 to National Rail as RQCX, Feb 1995 to RQCY.
160601_10101.jpg
160601 10101135 viewsWest Kalgoorlie, 2MP5 intermodal train, platform 5 of 5-pack RRRY 7011 well waggon set, one of nineteen built in China at Zhuzhou Rolling Stock Works for Goninan in 2005, Linfox 46' reefer FTAD 910601, from the Thermo King side.
160609_0485.jpg
160609 0485135 viewsWoodbridge, 5PM5 intermodal train, RRAY 7180 platform 5 of 5-pack articulated skel waggon set, one of a hundred built by ABB Engineering NSW 1996-2000, 40' deck with two 20' boxes, Royal Wolf RWTU 965616 and Linfox FSWB 963508.
110710_7422_PD.jpg
110710 7422 PD135 viewsWest Kalgoorlie, AQAY 2273, this orphan waggon started life as a Comeng Vic built GOX type open waggon for Commonwealth Railways in 1970, then coded AOOX. Under AWR ownership is was reduced to this 3 TEU unit container skeletal waggon. Peter Donaghy image.
110710_7427_PD.jpg
110710 7427 PD135 viewsWest Kalgoorlie, AQAY 2273, this orphan waggon started life as a Comeng Vic built GOX type open waggon for Commonwealth Railways in 1970, then coded AOOX. Under AWR ownership is was reduced to this 3 TEU unit container skeletal waggon. Peter Donaghy image.
160525_4568.jpg
160525 4568135 viewsParkeston, SCT train 3PG1 which operates from Perth to Parkes NSW (Goobang Junction), originally built by V/Line's Bendigo Workshops in June 1986 as one of fifty VQDW type 'Jumbo' Container Flat waggons built, PQDY 54 still in Freight Australia green livery loaded with two SCT 40' containers SCT 40222 and SCT 40220.
161109_1939.jpg
161109 1939135 viewsMoule, originally Kinki Sharyo built NHA type NHA 1005 for the NAR in 1968, to EP Division 1978, rebuilt with extended sides for gypsum traffic and recoded to ENHA type ENHA 7 in 1984, heavy wall patching with hungry boards loaded with gypsum.
161116_5101.jpg
161116 5101135 viewsWest Kalgoorlie, Shell fuel train 3442, tank waggon ATPF 575, built by WAGR Midland Workshops 1974 for Shell as type WJP 80.66 kL one compartment one dome.
161116_5115.jpg
161116 5115135 viewsWest Kalgoorlie, Shell fuel train 3442, ATMF 552 fuel tank waggon, one of three built by Tulloch Limited NSW as WJM type in 1971 with a capacity of 96.25 kL one compartment one dome, current capacity of 80500 litres. 551 and 552 for Shell and 553 for BP Oil, E type couplers fitted.
040407_073324.jpg
040407 073324135 viewsGoldsworthy Junction, Barclay Mowlem's R.E.L.A.M lease ballast plough, Knox Kershaw KBR 850 model travels east along the Goldsworthy line past the dual headed GJ 9 signal. 7th April 2004
040408_162741.jpg
040408 162741135 viewsMooka Siding north backtrack, side view of the driving cab end of BHP's mainline Tamper 1, Plasser Australia 09-32 CAT model with serial 306. 8th April 2004.
050407_0384.jpg
050407 0384135 viewsNelson Point yard hard stand area sees brand new having only been delivered, BHP track tamper support trailer for Tamper 3 which will arrive in a couple of days. Plasser Australia 09-3X model with serial M480. 7th April 2005.
030404_125126.jpg
030404 125126135 viewsPort Augusta Spencer Junction yard, a Perth bound intermodal awaits departure time on 13 Road behind National Rail NR class units built by Goninan as GE Cv40-9i models, NR 50 serial 7250-08 / 97-252. 4th April 2003.
5952_001.jpg
5952 001135 viewsWelshpool, Goninan workshops, Mt Newman Mining C636 ALCo unit 5452 serial G6012-1 built by AE Goodwin in May 1968 is undergoing a world first as it gets rebuilt into a GE C36-7M locomotive, by July 1987 it would become 5509. Sept 1986.
Jim Bisdee photo.
20860.jpg
20860135 viewsBassendean, Goninan workshops, sitting outside the locked gates having just been bought down from Port Hedland, Mt Newman Mining's AE Goodwin ALCo C636 unit 5454 serial G6012-3 on a ninety six wheel road float. 5454 will be rebuilt into CM40-8M unit 5641 by June 1992. Image taken January 1992.
Jim Bisdee photo.
23761.jpg
23761135 viewsBassendean, Goninan workshops, a stripped back ALCo locomotive frame under re-construction which will become a GE CM40-8M and the ARHS former WAGR B class shunt engine. January 1993.
Jim Bisdee photo.
170915_0719.jpg
170915 0719135 viewsAt the 18.2 km as part of the empty Roy Hill fuel train, TA type diesel fuel tank waggon TA 1012 built by CSR Yangtze Rolling Stock Co China with a capacity of 96000 litres. 15th September 2017. View map here.
240-22.jpg
240-22135 viewsWickham, left hand side number one end view of former Robe River and NSWGR MLW built ALCo RSC3 serial 77737 of October 1951, was originally 40 class 4006. Shows modified bogie to convert the A1A to a BO bogie type. 31st August 2002.
16872 files on 844 page(s) 351

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional