Most viewed |
160523 2838112 viewsParkeston, SCT train 7GP1 which operates from Parkes NSW (Goobang Junction) to Perth, PBGY type covered van PBGY 0105 Multi-Freighter, one of eighty units built by Gemco WA.
|
|
160524 3649112 viewsKalgoorlie, SCT train 2PM9 operating from Perth to Melbourne, SCT crew accommodation coach PDAY 002 'Peter Terence Mason' converted from former Bluebird 250 class power car #260 'Corella' originally built by SAR Islington Workshops in 1959 and seated 56 second class passengers, converted to crew car in 2005.
|
|
160524 3660112 viewsKalgoorlie, SCT train 2PM9 operating from Perth to Melbourne, PBGY type covered van PBGY 0079 Multi-Freighter, one of eighty two waggons built by Queensland Rail Redbank Workshops in 2005.
|
|
160524 3666112 viewsKalgoorlie, SCT train 2PM9 operating from Perth to Melbourne, CQWY type CQWY 5007-1 with an SCT 48' reefer SCTR 318 and SCT 48' MFG1 type box SCTDS 4851. The CQWY was built by Bluebird Rail Operations in South Australia in 2008 as a batch of sixty pairs.
|
|
161109 1890112 viewsMoule, train 4DD4 rumbles along the mainline behind Genesee & Wyoming locomotives Clyde Engineering EMD model JL22C units 1601 serial 71-728 and 1603 serial 71-730 and a pair of AE Goodwin ALCo model DE531 units 859 serial 84705 and 850 serial 84136 with 62 loaded waggons.
|
|
050704 3971112 viewsBing Siding, empty 116 kL Comeng NSW built tank waggon 0012 from 1972, one of three such tank waggons, view of handbrake detail, on the rear of a loaded ore train.
|
|
050704 3978112 viewsBing Siding, empty 116 kL Comeng WA built tank waggon 0018 from 1974-5, one of six such tank waggons, detail of the A end and bogie, wearing the BHP Billiton Earth livery.
|
|
060414 3443112 viewsNelson Point yard, originally a Magor USA built ballast waggon for the Oroville Dam construction, 510 seen here modified as a weighbridge test car.
|
|
060429 3749112 viewsFlash Butt yard, Pony re-laying waggon 6703 is a heavily cut down and modified Magor USA ore waggon done by Mt Newman Mining workshops, converted to a 50 tonne flat waggon.
|
|
040408 162741112 viewsMooka Siding north backtrack, side view of the driving cab end of BHP's mainline Tamper 1, Plasser Australia 09-32 CAT model with serial 306. 8th April 2004.
|
|
040408 162813112 viewsMooka Siding north backtrack, side view of BHP's mainline Tamper 1, Plasser Australia 09-32 CAT model with serial 306. 8th April 2004.
|
|
030403 162352112 viewsCrystal Brook, view from rear of CLF class leader CLF 1 'City of Whyalla' serial 93-AN-1, rebuilt by MKA to EMD model AT26C-2M from CL class unit CL 2 in 1993. 3rd April 2003.
|
|
030403 165451112 viewsRed Hill, a Clyde Engineering built EMD JT46C model AN class unit AN 6 serial 93-1302 on an Adelaide and then Melbourne bound service depart following a crib break for the driver. 3rd April 2003.
|
|
030404 082909112 viewsPort Germein, Perth bound steel and intermodal hurries through on the main behind National Rail's NR class units, showing one and a half stacking and new vehicles on flat waggons. 4th April 2003.
|
|
030404 104443112 viewsPort Augusta, Spencer Junction yard, RQZY type five unit bar coupled well container waggon RQZY 7050 built as one of a batch of thirty two by Goninan NSW for National Rail, with a Mayne Logistics 48' box DRC 180 on top of a TNT tarped 40' half height unit. 4th April, 2003.
|
|
030404 104454112 viewsPort Augusta, Spencer Junction yard, RQZY type five unit bar coupled well container waggon RQZY 7050 built as one of a batch of thirty two by Goninan NSW for National Rail, detail of the bar coupling arrangement. 4th April, 2003.
|
|
190107 0559112 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00142 built by CSR Yangtze Co China serial 2014/382-142 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|
190107 0651112 viewsWest Kalgoorlie, Mineral Resources MRL class loco MRL 002 'Spirit of Yilgarn' with serial R-0113-03/14-505 a UGL Rail Broadmeadow NSW built GE model C44ACi model locomotive sits on a rake of fuel waggons awaiting its' transfer run to Esperance on the overnight fuel train.
|
|
190109 1559112 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with Pacific National's NR class loco NR 80 with serial 7250-03 / 97-282 a Goninan Bassendean WA built GE model Cv40-9i model locomotive originally built for National Rail Corporation 1997.
|
|
190109 1592112 viewsBinduli, Mineral Resources Ltd empty iron ore train 4030 with MRL's MHPY type iron ore waggon MHPY 00242 built by CSR Yangtze Co China serial 2014/382-242 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
|
|
16480 files on 824 page(s) |
|
|
|
|
|
|
|
|
355 | |
|
|
|
|
|
|
|